Difference between revisions of "CS Computing Labs Schedule Changes"

Line 3: Line 3:
  
  
'''Friday, Feb 6 through Saturday, Feb 7''', the 3rd floor CS Ugrad Lab, Malone Hall 322, will be unavailable for brief 30 to 45 minute periods due to occasional workshops for HopHacks, our semesterly hackathon.
+
'''Friday, Feb 6 through Saturday, Feb 7''', the 3rd floor CS Ugrad Lab, Malone Hall 322, will be unavailable for brief 30 to 45 minute periods due to occasional workshops for HopHacks, our semesterly hackathon. ''(The Linux Systems will still be available remotely.)''  We are awaiting details with specific times. '''''MH 122 (the downstairs Ugrad Lab) will remain available.'''''
 
 
(The Linux Systems will still be available remotely.)
 
 
 
We are awaiting details with specific times.
 
 
 
MH 122 (the downstairs Ugrad Lab) will remain available.
 
  
  

Revision as of 21:32, 27 January 2015

There are no planned Ugrad Lab schedule changes at this time.


Friday, Feb 6 through Saturday, Feb 7, the 3rd floor CS Ugrad Lab, Malone Hall 322, will be unavailable for brief 30 to 45 minute periods due to occasional workshops for HopHacks, our semesterly hackathon. (The Linux Systems will still be available remotely.) We are awaiting details with specific times. MH 122 (the downstairs Ugrad Lab) will remain available.