Difference between revisions of "CS Computing Labs Schedule Changes"

Line 1: Line 1:
 
<!-- There are no planned Ugrad Lab schedule changes at this time.  -->
 
<!-- There are no planned Ugrad Lab schedule changes at this time.  -->
'''Friday, Feb 6 through Saturday, Feb 7''', the 3rd floor CS Ugrad Lab, Malone Hall 322, will be unavailable for brief 30 to 45 minute periods due to occasional workshops for HopHacks, our semesterly hackathon.  ''(The Linux Systems will still be available remotely.)'' We are awaiting details with specific times.  '''''MH 122 (the downstairs Ugrad Lab) will remain available.'''''
+
'''Friday, Feb 6 through Saturday, Feb 7''', the 3rd floor CS Ugrad Lab, Malone Hall 322, will be unavailable during the following times due to workshops for HopHacks, our semesterly hackathon.  ''(The Linux Systems will still be available remotely.)''  
 +
 
 +
Friday, 2/6, from 11pm to 1am
 +
 
 +
Saturday, 2/7, from 2pm to 5pm.
 +
 
 +
Note: '''''MH 122 (the downstairs Ugrad Lab) will remain available.'''''
  
  

Revision as of 04:45, 6 February 2015

Friday, Feb 6 through Saturday, Feb 7, the 3rd floor CS Ugrad Lab, Malone Hall 322, will be unavailable during the following times due to workshops for HopHacks, our semesterly hackathon. (The Linux Systems will still be available remotely.)

Friday, 2/6, from 11pm to 1am

Saturday, 2/7, from 2pm to 5pm.

Note: MH 122 (the downstairs Ugrad Lab) will remain available.