Difference between revisions of "Notices"
| Line 20: | Line 20: | ||
'''DETAILS:''' One of our main servers, blaze, requires hardware maintenance to replace some hardware and to resize a drive and will need to be shut down for up to 4 hours. | '''DETAILS:''' One of our main servers, blaze, requires hardware maintenance to replace some hardware and to resize a drive and will need to be shut down for up to 4 hours. | ||
| − | + | During that time, there will be no email service in or out on the CS Grad network. You will not be able to send or receive mail (IMAP/POP/etc.) through blaze (smtp.cs.jhu.edu) during that time. Also, DNS might be slow or non-existent, depending upon your client's own configuration. | |
Grad Net Lab Linux systems (masters1 through masters16, gradx, and gradz) may experience a short delay as their NIS service connects to a different server. | Grad Net Lab Linux systems (masters1 through masters16, gradx, and gradz) may experience a short delay as their NIS service connects to a different server. | ||
Revision as of 15:16, 13 April 2016
UNPLANNED SERVICE OUTAGES
None at this time.
PLANNED SERVICE OUTAGES
WHEN: Thursday, May 19, 4am to 8am.
DETAILS: One of our main servers, blaze, requires hardware maintenance to replace some hardware and to resize a drive and will need to be shut down for up to 4 hours.
During that time, there will be no email service in or out on the CS Grad network. You will not be able to send or receive mail (IMAP/POP/etc.) through blaze (smtp.cs.jhu.edu) during that time. Also, DNS might be slow or non-existent, depending upon your client's own configuration.
Grad Net Lab Linux systems (masters1 through masters16, gradx, and gradz) may experience a short delay as their NIS service connects to a different server.
Any updates (delays, etc.) will be found on this page.
CS COMPUTING LAB AVAILABILITY
MH 122 (Ugrad Lab)
Open as usual.
MH G-61 (Masters/Ugrad Lab)
Open as usual.