Difference between revisions of "Notices"
(→2) |
|||
Line 18: | Line 18: | ||
=== UNPLANNED CS SERVICE OUTAGES === | === UNPLANNED CS SERVICE OUTAGES === | ||
− | ====Outage 1==== | + | ===='''Outage 1'''==== |
;'''WHAT''' | ;'''WHAT''' | ||
: MH-G61's printer is jamming. | : MH-G61's printer is jamming. |
Revision as of 21:00, 18 February 2019
SERVICE OUTAGES
UNPLANNED CS SERVICE OUTAGES
Outage 1
- WHAT
- MH-G61's printer is jamming.
- WHEN
- Since 2/16/19
- DETAILS
- Printer is jamming a lot. We have called our printer service company, and are awaiting their coming out to do repairs.
Outage 2
- WHAT
- MH 122: ugrad1 cannot display anything on the projector
- WHEN
- Since February 2019
- DETAILS
- Communication between ugrad1 and the projector does not currently work. We're waiting on a fix from the manufacturer of our A/V system. You can still connect a laptop to the projector using the instructions available at the table.
PLANNED CS SERVICE OUTAGES
- None at this time.
CS COMPUTING LAB AVAILABILITY
- All CS computing labs available at this time.