Difference between revisions of "Notices"

Line 17: Line 17:
  
 
;'''WHAT'''
 
;'''WHAT'''
:MH 122: ugrad1 cannot display anything on the projector
+
::MH 122: ugrad1 cannot display anything on the projector
 
;'''WHEN'''
 
;'''WHEN'''
:Since February 2019
+
::Since February 2019
 
;'''DETAILS'''
 
;'''DETAILS'''
:Communication between ugrad1 and the projector does not currently work.  We're waiting on a fix from the manufacturer of our A/V system.  You ''can'' still connect a laptop to the projector using the instructions available at the table.
+
::Communication between ugrad1 and the projector does not currently work.  The A/V in the lab is managed by JHU's A/V group, Kit-cats.  They have notified the manufacturer of the A/V connection equipment of the problem, and they are waiting on a fix from the manufacturer.  You ''can'' still connect a laptop to the projector using the instructions available at the table.
  
 
<!--:None at this time.-->
 
<!--:None at this time.-->

Revision as of 01:30, 7 April 2019


SERVICE OUTAGES


UNPLANNED JHU SERVICE OUTAGES

WHAT: The CS and WSE websites are down.
WHEN: Started evening of April 6.
DETAILS: The main CS website is down. The CS website is run by WSE. And, WSE's own website is down. We've heard from WSE that they have hardware down and are investigating the problem now.


UNPLANNED CS SERVICE OUTAGES

WHAT
MH 122: ugrad1 cannot display anything on the projector
WHEN
Since February 2019
DETAILS
Communication between ugrad1 and the projector does not currently work. The A/V in the lab is managed by JHU's A/V group, Kit-cats. They have notified the manufacturer of the A/V connection equipment of the problem, and they are waiting on a fix from the manufacturer. You can still connect a laptop to the projector using the instructions available at the table.


PLANNED CS SERVICE OUTAGES

None at this time.



CS COMPUTING LAB AVAILABILITY

All CS computing labs available at this time.