Difference between revisions of "Notices"

Line 2: Line 2:
  
 
== <span style="color:#ff0000">SERVICE OUTAGES <span>==
 
== <span style="color:#ff0000">SERVICE OUTAGES <span>==
 +
 +
<!--
  
 
=== PLANNED ''JHU'' SERVICE OUTAGES ===
 
=== PLANNED ''JHU'' SERVICE OUTAGES ===
Line 15: Line 17:
 
:: G29 server room users: We're told that the G29 server room itself will not have its network switch affected, however, connections to and from G29 might be affected the building network switch its connected to is rebooted.  
 
:: G29 server room users: We're told that the G29 server room itself will not have its network switch affected, however, connections to and from G29 might be affected the building network switch its connected to is rebooted.  
 
<br>
 
<br>
<!-- -------------------------------------------------------------- -->
+
  -------------------------------------------------------------- -->
  
 
=== UNPLANNED CS SERVICE OUTAGES ===
 
=== UNPLANNED CS SERVICE OUTAGES ===

Revision as of 15:08, 4 October 2019


SERVICE OUTAGES

UNPLANNED CS SERVICE OUTAGES

None at this time.


PLANNED CS SERVICE OUTAGES

None at this time.



CS COMPUTING LAB AVAILABILITY

All CS computing labs available at this time.



AUDIO/VISUAL (A/V) OUTAGES

WHAT: MH 122: ugrad1 cannot display anything on the projector
WHEN: Since February 2019
DETAILS: Communication between ugrad1 and the projector does not currently work. The A/V in the lab is managed by JHU's A/V group, Kit-cats. They have notified the manufacturer of the A/V connection equipment of the problem, and they are waiting on a fix from the manufacturer. You can still connect a laptop to the projector using the instructions available at the table.