Difference between revisions of "Notices"
Line 18: | Line 18: | ||
− | + | == CS COMPUTING LAB AVAILABILITY == | |
− | == CS COMPUTING LAB AVAILABILITY | ||
=== MH 122 (Ugrad Lab) === | === MH 122 (Ugrad Lab) === | ||
Open as usual. | Open as usual. | ||
− | |||
Line 37: | Line 35: | ||
WHY: Network cable installation. The lab will be closed those two | WHY: Network cable installation. The lab will be closed those two | ||
mornings as workers install additional network cable. | mornings as workers install additional network cable. | ||
− | |||
=====NOTES:===== | =====NOTES:===== |
Revision as of 21:47, 12 February 2016
UNPLANNED SERVICE OUTAGES
None at this time.
PLANNED OUTAGES
None at this time.
CS COMPUTING LAB AVAILABILITY
MH 122 (Ugrad Lab)
Open as usual.
MH G-61 (Masters/Ugrad Lab)
PLANNED CLOSURE
WHERE: Malone Hall G-61, both the Masters and Ugrad sides of the lab.
WHEN: Monday, March 14 & Tuesday, March 15, from 6am to 12 Noon.
WHY: Network cable installation. The lab will be closed those two mornings as workers install additional network cable.
NOTES:
- During the lab closure times, the masters and ugrad Linux computers
in G-61 will continue to be available remotely, via SSH.
- Ugrad Lab, MH 122 will not be affected and will remain open during
those times.