Difference between revisions of "Notices"

Line 38: Line 38:
 
=====NOTES:=====
 
=====NOTES:=====
  
* During the lab closure times, the masters and ugrad Linux computers
+
* During the lab closure times, the masters and ugrad Linux computer in G-61 will continue to be available remotely, via SSH.
    in G-61 will continue to be available remotely, via SSH.
 
  
* Ugrad Lab, MH 122 will not be affected and will remain open during
+
* Ugrad Lab, MH 122 will not be affected and will remain open during those times.
            those times.
 
  
  

Revision as of 21:48, 12 February 2016

UNPLANNED SERVICE OUTAGES

None at this time.


PLANNED OUTAGES

None at this time.


CS COMPUTING LAB AVAILABILITY

MH 122 (Ugrad Lab)

Open as usual.


MH G-61 (Masters/Ugrad Lab)

PLANNED CLOSURE

WHERE: Malone Hall G-61, both the Masters and Ugrad sides of the lab.

WHEN: Monday, March 14 & Tuesday, March 15, from 6am to 12 Noon.

WHY: Network cable installation. The lab will be closed those two mornings as workers install additional network cable.

NOTES:
  • During the lab closure times, the masters and ugrad Linux computer in G-61 will continue to be available remotely, via SSH.
  • Ugrad Lab, MH 122 will not be affected and will remain open during those times.