Difference between revisions of "Notices"
Line 21: | Line 21: | ||
=== PLANNED CS SERVICE OUTAGES === | === PLANNED CS SERVICE OUTAGES === | ||
− | :'''WHAT:''' | + | :'''WHAT:''' Ugrad Network Home Directory File Server Will Experience A Brief Loss Of Networking Which May Affect You. |
:'''WHEN:''' Thursday, 9/26 starting at 9am and lasting up to 15 minutes. | :'''WHEN:''' Thursday, 9/26 starting at 9am and lasting up to 15 minutes. |
Revision as of 19:27, 23 September 2019
SERVICE OUTAGES
UNPLANNED CS SERVICE OUTAGES
- None at this time.
PLANNED CS SERVICE OUTAGES
- WHAT: Ugrad Network Home Directory File Server Will Experience A Brief Loss Of Networking Which May Affect You.
- WHEN: Thursday, 9/26 starting at 9am and lasting up to 15 minutes.
- DETAILS: We need to make a network configuration change on our Ugrad :Net's home directory file server, barley.cs.jhu.edu to attempt to correct an :issue. To complete the change, we must reset the network on that system. :Since it contains your the Ugrad home directories, during the network reset :time, all the CS Ugrad clients will lose connection to the file server.
- Therefore, This Thursday, 9/26 at 9am, please do not attempt to use the CS :Ugrad Linux systems for at least 15 minutes. If you're already logged in :before 9am, please sure you are logged out by 9am.
- If there are any issues with the network reset, we'll update its status here.
CS COMPUTING LAB AVAILABILITY
- All CS computing labs available at this time.
AUDIO/VISUAL (A/V) OUTAGES
- WHAT: MH 122: ugrad1 cannot display anything on the projector
- WHEN: Since February 2019
- DETAILS: Communication between ugrad1 and the projector does not currently work. The A/V in the lab is managed by JHU's A/V group, Kit-cats. They have notified the manufacturer of the A/V connection equipment of the problem, and they are waiting on a fix from the manufacturer. You can still connect a laptop to the projector using the instructions available at the table.