CS Computing Labs Schedule Changes

Revision as of 14:38, 16 September 2015 by Steve410.cs.jhu.edu (talk | contribs)

As of Monday, 9/15, the main phase of renovation of the new combination CS Masters/Ugrad Labs room, Malone Hall G-61 has been completed We are awaiting final approval for room occupancy. Look for email from the CS IT Support Team when the room is available for use. Additionally, signs will be posted outside MH G-61 and MH 122 to indicate the same, when the time comes.

For the Undergrad students, our Ugrad Collaboration room, Malone Hall 122, remains open.