Difference between revisions of "Notices"

Line 1: Line 1:
 
== UNPLANNED SERVICE OUTAGES ==
 
== UNPLANNED SERVICE OUTAGES ==
  
None at this time. <!-- -->
+
<!-- None at this time. <!-- -->
  
 
<!--
 
<!--
Line 13: Line 13:
 
-->
 
-->
  
Our [[Linux Clients on the CS Undergrad Net|Linux client]] <tt>ugradx.cs.jhu.edu</tt> was down from approximately 11:00 pm on Thursday, February 18th through 9:00 am on Friday, February 19th.  The system is back up and available and we're investigating the outage.
+
Our [[Linux Clients on the CS Undergrad Net|Linux client]] <tt>ugradx.cs.jhu.edu</tt> has been having problems and has been periodically unavailable.  As of 9:30 am, Sunday, February 21st it is up and running, but it may have problems again.
 +
 
 +
We're investigating the problem.
  
 
== PLANNED OUTAGES ==
 
== PLANNED OUTAGES ==

Revision as of 14:38, 21 February 2016

UNPLANNED SERVICE OUTAGES

Our Linux client ugradx.cs.jhu.edu has been having problems and has been periodically unavailable. As of 9:30 am, Sunday, February 21st it is up and running, but it may have problems again.

We're investigating the problem.

PLANNED OUTAGES

Nothing at this time.


CS COMPUTING LAB AVAILABILITY

MH 122 (Ugrad Lab)

Open as usual.


MH G-61 (Masters/Ugrad Lab)

PLANNED CLOSURE

WHERE: Malone Hall G-61, both the Masters and Ugrad sides of the lab.

WHEN: Monday, March 14 & Tuesday, March 15, from 6am to 12 Noon.

WHY: Network cable installation. The lab will be closed those two mornings as workers install additional network cable.

NOTES:
  • During the lab closure times, the masters and ugrad Linux computer in G-61 will continue to be available remotely, via SSH.
  • Ugrad Lab, MH 122 will not be affected and will remain open during those times.