Difference between revisions of "Notices"

(393 intermediate revisions by 2 users not shown)
Line 3: Line 3:
 
== <span style="color:#ff0000">CS IT STAFF AVAILABILITY</span> ==
 
== <span style="color:#ff0000">CS IT STAFF AVAILABILITY</span> ==
  
:<span style="color:#ff0000"> Beginning Fall semester, 2021,...</span>
+
*  The CS IT Support staff is back in Malone Hall. Our group is working a hybrid schedule with some of us working remotely on certain days, while others of our team are on campus.   
*  The CS IT Support staff will be back in Malone Hall. Our group will be working a hybrid schedule with some of us working remotely on certain days, while others of our team will be on campus.   
+
* We continue being available M-F, 8:30 to 5pm, but there may be certain times we might be online only.
* We will continue being available M-F, 8:30 to 5pm, but there may be certain times we might be online only.
 
 
*  Therefore, please remember to email [mailto:support@cs.jhu.edu support@cs.jhu.edu] for assistance.
 
*  Therefore, please remember to email [mailto:support@cs.jhu.edu support@cs.jhu.edu] for assistance.
 
*  Also, please have [https://support.cs.jhu.edu/wiki/Zoom Zoom] available on your device(s), so that we can arrange to contact you using that method, as an alternative to in-person communication.  
 
*  Also, please have [https://support.cs.jhu.edu/wiki/Zoom Zoom] available on your device(s), so that we can arrange to contact you using that method, as an alternative to in-person communication.  
Line 11: Line 10:
  
 
<br><p>
 
<br><p>
 +
  
 
<!--
 
<!--
== <span style="color:#ff0000">JHU IT SERVICE OUTAGES AFFECTING CS IT SERVICES<span>==
+
== <span style="color:#ff0000">JHU IT SERVICE OUTAGES AFFECTING CS IT SERVICES<span>==  
 
 
 
=== PLANNED ''JHU'' SERVICE OUTAGES ===
 
=== PLANNED ''JHU'' SERVICE OUTAGES ===
 +
-->
  
::'''WHAT:''' Potential 1 to 2 minute power outage in Malone Hall
+
<!-- TEMPLATE JHU Service Outages -->
 +
<!--
 +
{{outage
 +
  |type=Planned JHU outage
 +
  |services=Malone Hall
 +
  |time=Friday, March 10, starting around 11am and lasting until completed
 +
  |summary=Wi-Fi access point replacement
 +
  |details=JHU Networking will be swapping out all of the Hopkins-managed Malone Hall ''wifi'' access points in the building. They plan to start work around 11am that Friday, and they expect it could take 4 hours, more or less, to replace them all.  During that time, wifi access might disappear and reappear.  Additionally, when your wireless device tries to reconnect to the newly-replaced access point, you ''might'' be prompted to accept a certificate, and we were informed that you should do so.<br/>
 +
<br/>
 +
After the wifi outage, if you continue to have issues with your device, '''''please contact JHU IT directly...''''' Visit [[Wireless Networking]] for details on who to contact for assistance.
 +
}}
 +
-->
 +
<!--
 +
::JHU Networking has indicated they are testing power transfer equipment in Mason Hall that will affect several buildings, including Malone and Hackerman.  They will be cycling power to the buildings, perhaps several times.  They expect their outages to be < 10 seconds each.
  
::'''WHEN:''' Saturday, June 26, starting at 8pm
+
::Our CS IT servers that provide you most of our IT services should remain up and running, since our servers have backup battery power.  Unfortunately, the JHU network in the building does not.  So, you will probably experience brief network interruptions when the power is cycled by Facilities.  And each time the power is out, CS services that you interact with (email, web, home directories, etc.) will be inaccessible due to the building's network being unavailable during the outage times.
  
::'''DETAILS:'''
+
::Faculty who run their own servers in the CS Server Room (MH G-29), please note that if you do not have UPS units in your racks (and most of you do not), you can expect your systems will power cycle each time Facilities cycles power in Malone Hall.  Please be aware.  PhD students who maintain those systems (and perhaps other systems in the building), please keep that in mind as well.
  
 +
::The CS computing labs' systems (currently, for the summer, all located in G-61), those computers are not on UPS systems, so those computers will power cycle and should boot back up on their own.  But, if you're planning to use our lab systems, because they might go up and down several times during the electrical work time period, you might not want to do your school work on those systems during that time.
 +
-->
 +
<!--
 
::JHU Facilities is preparing for BGE to test electrical equipment that affects several Homewood buildings.  They will be performing this test on Saturday evening, June 26 at 8pm.  If you recall, back on May 6, there was a very short power outage that affected our building and others.  The testing BGE will be doing is part of their troubleshooting what happened in May.
 
::JHU Facilities is preparing for BGE to test electrical equipment that affects several Homewood buildings.  They will be performing this test on Saturday evening, June 26 at 8pm.  If you recall, back on May 6, there was a very short power outage that affected our building and others.  The testing BGE will be doing is part of their troubleshooting what happened in May.
  
Line 42: Line 58:
 
-->
 
-->
  
== <span style="color:#ff0000">CS IT SERVICE OUTAGES <span>==
+
== <span style="color:#ff0000">CS IT SERVICE OUTAGES (Unplanned & Planned)<span>==
  
<!--=== UNPLANNED ''JHU'' SERVICE OUTAGES ===-->
+
<!--
 +
=== UNPLANNED ''JHU'' SERVICE OUTAGES ===
  
<!--TEMPLATE
+
====<span style="color:#ff0000">9/29/23 MAJOR JHU email outage and delays</span>====
::'''WHAT:'''
 
  
::'''WHEN:'''  
+
:JHU is experiencing email issues with it's @jhu.edu mail services due to a global outage at Cisco.  This affects both incoming and outgoing email messages to external recipients.  It also impacts systems that send email through JHU's email gateways.  Expect major mail delays until this is fixed.  (We suspect that those with @jhu.edu addresses can still send and receive to others with @jhu.edu addresses.)
  
::'''DETAILS:''' -->
+
:'''''UPDATE:'''''  JHU has implemented a work-around to the email problem, and email delivery has returned to normal.
 +
-->
 +
<!--TEMPLATE
 +
{{outage
 +
  |services=
 +
  |summary=
 +
  |time=
 +
  |details=
 +
}}
 +
-->
  
 
<!-- <br>-->
 
<!-- <br>-->
  
 
=== UNPLANNED CS IT SERVICE OUTAGES ===
 
=== UNPLANNED CS IT SERVICE OUTAGES ===
<!--:'''WHAT:''' G61's MHG61PRT printer is down for repair.
 
  
:'''WHEN:'''  Started Aug 26, 2021 at 11am
 
  
:'''DETAILS:''' The HP printer in G-61, MHG61PRT is down for repair.  The repair company needs to order a part.  It is unknown when the part will become available and installed. 
 
 
:In the meantime, please use the printer in MH-122, MH122PRT.
 
 
:Other available printers can be found at:  [[Available Printers]]  -->
 
 
<!--TEMPLATE
 
<!--TEMPLATE
 
{{outage
 
{{outage
   |time=
+
   |time=Started Aug 15, 2022 around 7am
   |services=
+
   |services=MH-122's MH122PRT printer
   |summary=
+
   |summary=The HP printer in MH-122, mh122prt, is down due to a fuser error.  Service has been called.
 +
  |details=In the meantime, please use the printer in MH-G61, mhG61prt.<br/>
 +
<br/>
 +
Other available printers can be found at:  [[Available Printers]]
 
}}
 
}}
 
-->
 
-->
  
<!--:None at this time.-->
+
:None at this time.
 
 
<!-- <br>-->
 
 
 
{{outage
 
  |time=Started  around October 30, 2020
 
  |services=Grad Net Self-Service File Recovery
 
  |summary=Intermittent errors while using self-service recovery
 
  |details=The <code>/users/backup</code> directory used for [[Self-Service File Recovery]] on the CS '''''Grad''''' Net Linux clients may be ''sporadically unavailable'', due to a software bug.  Although you may still attempt the self-service recovery, until further notice, if you need a file restored and are having issues accessing the <code>/users/backups</code> directory, please [[BACKUPS - Requesting Restoration of a Deleted File|request restoration from our offline backups]].<br/>
 
<br/>
 
We are working on getting a fix for it, but it might be some time before that fix is available.<br/>
 
<br/>
 
NOTE: Self-Service File Recovery continues to be available on the CS '''''Ugrad''''' Net.}}
 
  
 
<!--====<span style="color:#0000ff">PHISHING EMAIL AND OTHER ACCOUNT ISSUES!</span>====
 
<!--====<span style="color:#0000ff">PHISHING EMAIL AND OTHER ACCOUNT ISSUES!</span>====
Line 97: Line 106:
  
 
  </div>-->
 
  </div>-->
 
 
<!--:None at this time.-->
 
<!--:None at this time.-->
  
 
=== PLANNED CS IT SERVICE OUTAGES ===
 
=== PLANNED CS IT SERVICE OUTAGES ===
  
<!--:None at this time.-->
+
:None at this time.
 +
<!--
  
==== CS Mail Service ''Unavailability'' Due To Planned Maintenance  ====
+
====Major Malone Power Outage Planned (Affecting CS IT Services) - Saturday, March 30 from 6am to 2:30pm (CS IT Services Outage before and after Power Outage as well)====
  
:'''WHAT:''' CS Mail will be unavailable as we switch mail services.
+
:'''WHAT:''' There will be '''''no''''' CS IT computing services available during an upcoming all-day major power outage for ALL of Malone Hall.
  
:'''WHEN:'''  ''Wednesday, November 17, 5:30am to 7am.''
+
:'''WHEN:'''  Power Outage - Saturday, March 30, 2024, starting at '''6am''' and running until '''2:30pm''' (so, roughly, 8.5 hours.)
  
:'''DETAILS:''' As we are switching our mail server software to a different "brand" of software, during the transition time, several of our CS mail services will be unavailable during this time period.
+
:: Loss of CS IT services - Saturday, March 30, 2024, starting at '''5am''' (one hour before the power outage) and lasting until '''4:30pm''' (two hours after the power outage is completed.)
  
=====CS Mail Services That Will '''''Not''''' Be Available=====
+
:'''DESCRIPTION:'''   JHU is planning an a all-day power outage for Malone Hall, and all of our computing services will be unavailable during that time.
  
* Inbound mail. Mail that people send to @cs.jhu.edu email addresses will not be accepted during this time periodThe sending mail server    should hold on to the messages and resend them after service has been restoredAny mail sent to @cs.jhu.edu email addresses during the   maintenance should arrive, just delayed by some period of time.
+
:The actual power outage is planned to start at 6am, Saturday morning, March 30,, and will continue for approximately an 8.5 hours'''''However,''''' we need to safely bring down our computer servers and clients ''earlier'' than that (before the power goes out.) We plan to bring our systems down that morning around '''5am'''. And although the power to the building should restored around 2:30pm that same day, we will not have all our systems back up and running until approx. 4:30pm, so plan on about 2 hours after the power outage is deemed over until our servers and services are available again.
  
* Outbound mail.  People with CS grad mail accounts will not be able to send mail during the maintenance.  Please wait until after 7:00 am to    send mail with your CS account.  Note: People with *ugrad* accounts will still be able to send mail, since they use JHU's mail server for sending mail.
+
:<span style="color:#ff0000">Please read all of the notes below regarding Malone Hall Residents, CS Server Room users, and a list of the CS IT services that will be unavailable during the outage. </span>
  
* CS Mailing ListsDuring the mail service switchover, CS mailing lists will be unavailable.
+
::<span style="color:#ff0000">'''NOTES TO MALONE HALL RESIDENTS:'''</span>  During the time of the outage, we're assuming most building lights will be out and the J-Card system might be out tooThat might make it more difficult to get into the building during the outage.  But with the power out, we're not sure how much need there will be for anyone to be in the building during that time anyway.  If you have an office refrigerator, expect that to be out too.  If you are counting on your UPS (battery-backup) systems to continue powering your office equipment, keep in mind the expected length of the outage (8 hours) and plan for a longer period of time, just to be safe.  And keep in mind that your office phones may be inoperable during the outage.  So please plan in advance for this outage.  
  
=====CS Mail Services That Will Remain Available=====
+
::<span style="color:#ff0000">'''NOTE TO CS SERVER ROOM (MH G-29) SERVER OWNERS:''' </span>  Our server room will be out of power, so our servers will be unavailable.  If you host servers in the server room, your servers will be down as well.  Plan ahead of time to shut down and to bring back up your servers.  Your group is responsible for any systems you choose to shut down before the outage or boot back up after the outage.
  
* IMAP and POP.  If you use a mail client to access your CS mail remotely, this will continue to work.  You will still be able to read messages already in your mail mail folders (though, as noted above, no new messages will de delivered).  The CS webmail uses IMAP, so you  will be able to access your existing messages from webmail.
+
=====Tracking Our CS IT Services Status Updates During The Outage=====
  
* Mail spool access from the Linux clients.  If you use a direct-access  mail client on the CS Linux clients (e.g. pine), you will continue to    have access to all of your email messages (though, as noted above, no new messages will de delivered).
+
:Because we will not have power to our servers in Malone Hall, the CS IT Support Wiki, and especially this Notices page ( https://support.cs.jhu.edu/wiki/Notices ) will be unavailable during the outage.  Instead, during the outage, we have arranged for status updates to be available at the following website (served at an off-site facility):
  
 +
::[https://csstatus.jhu.edu https://csstatus.jhu.edu]  We will update that page soon with this information.
  
<!--
+
:(Bookmark that link ahead of time, in case you can't access your CS mail during the outage.)
{{outage
 
  |type=Planned outage
 
  |time=Wednesday, April 14 from 2:00 pm to 3:00 pm
 
  |services=[[Webmail]] on www.cs.jhu.edu
 
  |summary=During the scheduled time period, people using the department's webmail service may be logged out and will have to log back in.  This might happen more than once during the time period.
 
  |update=As of 2:40 pm, the maintenance is complete. If you were perviously logged in to the webmail, you might need to log out and back in again (or just log in again), but no further interruptions should occur.
 
}}
 
  
-->
+
:As soon as we're able to do so after the outage, we'll also make this Notices page available again.
<!--
 
********************
 
** SERVICE OUTAGE **
 
********************
 
  
==== Major CS Grad/Research Net service outage (mail,<span style="color:#ff0000"> web, home directories, login, etc.) ====
+
=====CS IT Services ''Un''available During The Power Outage Include...=====
  
'''WHAT:''' Major CS Grad/Research Net IT services outage, as we update our file server system.  
+
* DNS resolution (hostname lookups) for all cs.jhu.edu hostnames will be unavailable.  This will affect all websites with cs.jhu.edu domain names, even if the website is hosted by someone other than the CS department.
  
'''WHEN:'''  ''Tuesday morning, Oct 13, 5am to approx. 6am.''
+
* CS Mail service, both incoming and outgoing, will be suspended for CS Grad/Research Net users.  And some CS email services will not be available for CS Ugrad Net users.
 +
** Incoming mail ''should'' be queued by the sender until our mail service is back up again. Outgoing mail will not be available.
 +
** Outgoing CS mail will not be available to Grad Net users, but since CS Ugrads can send through the JHU mail server, CS Ugrads might still be able to send email during the outage (just not from a Malone Hall–based computer.)
 +
** IMAP, POP, and webmail (for both Grad/Research and Ugrad accounts) will be unavailable.
  
'''DETAILS:'''
+
* '''No''' CS webpages will be available.  This includes the main CS website.  And, as mentioned above... because we will not have power to our servers, the CS IT Support Wiki, and especially its Notices page will be unavailable during the outagePlease refer to https://csstatus.jhu.edu for status updates during the outage.
:Our CS Grad/Research Net home directory file server, ''rtfm.cs.jhu.edu'', will be rebooted so that a time-sensitive, required update can be applied.    We will apply the required update this coming Tuesday morning, Oct 13, starting at 5amWe expect the reboot and configuration to take no more than an hour if all goes well.
 
  
: During the process of applying the update, several of our CS services will be unavailable.  A list is below.
+
* Grad/Research Net and Ugrad Net user accounts and home directories will be inaccessible during the power outage.
  
: If there are any unexpected complications during the update process that will delay the restoration of services, we will update this CS IT Support Wiki's Notices page.
+
* ssh service to our CS Grad/Research Net & Ugrad Net Linux boxes (masters1 through masters16, ugrad1 through ugrad24, gradx, gradz, ugradx, and ugradz) will be unavailable.
  
===Suspended (Unavailable) ''Grad/Research Net'' services expected to be down while rtfm.cs.jhu.edu is rebooted:===
+
* Console (desktop) access at any of our lab Linux client systems will be unavailable.
  
* CS Mail service, both incoming and outgoing, will be suspended for CS Grad/Research Net users.  Incoming mail should be queued by the sender until our mail service is back up again.
+
* SMB (SAMBA) File Shares (the CS Office Staff and some others use these) will be unavailable.
  
* IMAP, POP, and Webmail from our CS (Grad/Research Net) Mail server will be unavailable.
+
* MySQL service via the mysql.cs.jhu.edu server and through the dbase.cs.jhu.edu server will be unavailable.
CS IT Support Wiki
 
* Some CS webpages, including user (and possibly lab and other CS pages), will be unavailable.
 
  
* Grad/Research Net user accounts/home directories will be inaccessible during the downtime.
+
* Network switches in the building will be without power, so no network connections in Malone Hall.
 
 
* SMB File Shares (CS Office Staff and some CS faculty and grad students use these) will be unavailable.
 
 
 
* SSH service to our C.S Grad/Research Net Linux boxes (masters1 through masters16, gradx, and gradz) will be unavailable.
 
 
 
* Console (desktop) access to masters1 through masters16 will be unavailable.  However, since users are not currently allowed in the CS labs, this should not be an issue.
 
 
 
* MySQL service via the mysql.cs.jhu.edu server will be unavailable.
 
CS IT Support Wiki
 
:'''Note:'''  CS ''Ugrad Net'' services should not be affected by this outage other than incoming Ugrad Net email might be delayed.
 
  
 +
* Wifi access points in Malone Hall will be without power and will therefore not be available.
 +
<br>
 
-->
 
-->
 
<!--
 
<!--
********************
+
{{outage
** SERVER UPGRADE **
+
  |type=Planned outage
********************
+
  |services=most CS IT services
 +
  |time=Tuesday, December 27, 9:00 am to 12:00 pm
 +
  |summary=Most CS IT services will be unavailable due to file server maintenance.
 +
  |details=We will be performing maintenance on our several of servers. This will require downtime for several major CS IT services.  The affected IT services will be unavailable on the morning of Tuesday, December 27, starting at 9:00 am.  Most services should be restored before 10:00 am, but services depending on the ugrad file server will remain unavailable for longer.  Please see below for the list of affected services.<br/>
 +
<br/>
 +
'''CS IT Services That Will Not Be Available During The System Maintenance:'''<br/>
  
:'''WHAT:''' CS Ugrad systems will be unavailable during a server upgrade.
+
* CS mail service, both incoming and outgoing, will be suspended for CS Grad/Research Net users. Some CS email services will not be available for CS Ugrad Net users.  Incoming mail should be queued by the sender until our mail service is back up again.  Outgoing CS mail will not be available to Grad Net users.  CS ugrads can send through the JHU mail server, which will remain available.  We expect mail service to be restored by 10:00 am, but see below about mail retrieval for ugrad accounts.
  
:'''WHEN:''' Monday, June 29, starting at 8:30am and lasting approx. 10:30am.
+
* IMAP, POP, and webmail (for both Grad/Research and Ugrad accounts) will be unavailable.  We expect Grad Net email to be full operational by 10:00 am. Ugrad IMAP, POP, and webmail should be available by 12:00 pm.
  
:'''UPDATE:''' As of 9:30 am, the updates are complete and all ugrad services should be available again.
+
* No locally-stored CS webpages will be available. The main CS website (run by WSE) will remain available, but some individual pages may fail to load.  Personal webpages (both grad and ugrad) will not load.  Other websites hosted by us for department affiliates (e.g. lab websites) will be unavailable.  The CS IT Support Wiki and its Notices page will remain available.  We expect all service interruptions for the main webserver (www.cs.jhu.edu) and hosted websites to be completed before 10:00 am. Ugrad personal webpages should be available again by 12:00 pm.
  
:'''DETAILS:'''
+
* Grad/Research Net and Ugrad Net user accounts and home directories will be inaccessible during the services outage.  We expect Grad Net services to be restored by 10:00 am and Ugrad Net services by 12:00 pm.
  
::We need to update firmware on the CS Ugrad home directory file server.  We'll be doing that starting at 8:30am on 6/29. We expect the update process to l
+
* ssh service to our CS Grad/Research Net & Ugrad Net Linux boxes (masters1 through masters16, ugrad1 through ugrad24, gradx, gradz, ugradx,and ugradz) will be unavailable.  We expect Grad Net services to be restored by 10:00 am and Ugrad Net services by 12:00 pm.
  
:'''UPDATE:''' The Malone Hall power outage originally scheduled for Saturday, January 16, 2021 has been postponed until some time in March.  Details when we receive them.
+
* Console (desktop) access at any of our lab Linux client systems will be unavailable.  We expect Grad Net systems to be available again by 10:00 am and Ugrad Net systems by 12:00 pm.
ast up to two hours (as long as there are no issues.) Because the file server will be down, there will be several CS Ugrad computing services that will be unavailable during that time:
 
  
::'''CS UGRAD COMPUTING SERVICES ''UNAVAILABLE'' DURING THE SERVER UPGRADE'''
+
* SMB (Samba) file shares (the CS office staff and some others use these) will be unavailable.  We expect them to be available again by 10:00 am.
  
::* '''''None''''' of the CS Ugrad lab machines ''(ugrad1 through ugrad24, ugradx, ugradz)'' will work. They'll be running, but users won't be able to log in to them, and they'll appear to hang for users already logged in at the time the outage startsThese systems should return to normal after the outage is over.
+
* MySQL service via the mysql.cs.jhu.edu server and the dbase.cs.jhu.edu server will be unavailableWe expect mysql.cs.jhu.edu to be available by 10:00am and dbase.cs.jhu.edu by 12:00 pm.
 
+
}}
::* CS Ugrad web pages ''(under www.ugrad.cs.jhu.edu)'' will not load properly.
+
-->
  
::* Users with CS Ugrad email accounts will not be able to retrieve their mail.  Sending mail will technically work, but if your mail client is configured to save copies of messages to a mail folder, that will not work (and might prevent the mail from being sent).  Mail sent to CS Ugrad accounts will be available after the outage is over.  (That incoming CS Ugrad mail will queue on our central mail server during the outage.)
 
  
::* ''dbase.cs.jhu.edu'', the MySQL server used for the Databases class, will be unavailable.
+
<!--{{outage
-->
+
  |type=Limited availability
<!--                  -->
+
  |time=June 10 through August 10, 2022
 +
  |services=ugrad1 through ugrad12
 +
  |summary=''ugrad1'' through ''ugrad12'' will only be available remotely through SSH.  Please see the CS Computing Lab Availability section below for details.
 +
}}-->
 
<!--
 
<!--
 
*******************************************
 
*******************************************
*********  POWER OUTAGE TEMPLATE***********
+
**** UGRAD CLIENT UPGRADES TEMPLATE *******
 
*******************************************
 
*******************************************
 +
====CS Linux Client Unavailability During Upgrades====
  
====Major Malone Power Outage Planned, Affecting CS IT Service - October 23 & 24, 2021====
+
:We are upgrading our [https://support.cs.jhu.edu/wiki/Category:Linux_Clients CS Linux Clients] to Fedora 35 (from Fedora 33) per the following schedule:
  
:'''WHAT:''' There will be '''''no''''' CS IT computing services available during an upcoming major power outage for ALL of Malone Hall.
+
:* On Monday, January 24 the systems in Malone G61's Masters/Ugrad Lab will be upgraded.  This includes all masters lab systems (masters1 through 16) and the ugrad lab systems in that same area (ugrad13 through 24).  Please use ugradx and gradx instead.
 +
:** As of 4:00 pm, all of the Malone G61 upgrades have been completed.
  
:'''WHEN:'''  Saturday, October 23, 2021starting at '''3''pm''''' and running until Sunday, October 24, 2021, sometime around '''6''am'''''.
+
:* On Tuesday, January 25, the systems in the Malone 122 Ugrad Lab will be upgraded.  These are ugrad lab systems ugrad1 through 12.  Please use one of the already-upgraded ugrad systems (ugrad13 through ugrad24) instead. You may also use the not-yet-upgraded ugradx if you want.
 +
:** As of 2:00 pm, all of the Malone 122 upgrades have been completed.
  
:'''DESCRIPTION:'''  JHU is planning an a power outage for Malone Hall, and all of our computing services will be unavailable during that time.
+
:* On Wednesday, January 26, in addition to any of the above systems that we were unable to upgrade the prior two days, we will also upgrade the Linux clients ugradz and gradz.  Please use any of the already-upgraded systems (ugrad1 through ugrad24 or masters1 through masters16) instead.  You may also use the not-yet-upgraded ugradx and gradx if you want.
 +
:** As of 2:00 pm, both ugradz and gradz have been upgraded.
  
:The actual power outage is now planned to start at 4pm, Saturday afternoon, October 23, and will continue overnight until Sunday morning, October 24 at 4amHowever, we need to safely bring down our computer servers and clients earlier than that (before the power goes out.) We plan to bring our systems down around '''3pm''' that Saturday afternoon. And although the power should be up around 4am Sunday morning, we will not have all our systems back up and running until approx. 6am, so plan on about 2 hours after the power outage is deemed over until our servers and services are available again.
+
:* On Wednesday, February 2, the Linux clients ugradx and gradx will be upgradedPlease use ugradz/gradz or the lab client systems (ugrad1-24/masters1-16) instead.
 +
:** As of 2:00 pm, both ugradx and gradx have been upgraded.
  
 +
:'''NOTE:'''  On each day, the upgrades will start at roughly 9:00 am and are expected to be complete by 5:00 pm.
 +
END TEMPLATE - UGRAD CLIENT UPGRADES -->
 +
<!-- TEMPLATE FOR POWER OUTAGE
 +
==== Major CS Grad/Research Net and Ugrad Net IT Services Outage====
  
:<span style="color:#ff0000">Please read all of the notes below regarding Malone Hall Residents, CS Server Room users, and a list of the CS IT services that will be unavailable during the outage. </span>
 
  
::<span style="color:#ff0000">'''NOTES TO MALONE HALL RESIDENTS:'''</span>  During the time of the outage, we're assuming most building lights will be out and the J-Card system might be out too.  That might make it more difficult to get into the building during the outage.  But with the power out, we're not sure how much need there will be for anyone to be in the building during that time anyway.  If you have an office refrigerator, expect that to be out too.  If you are counting on your UPS (battery-backup) systems to continue powering your office equipment, please realize that this is an expected over-12-hour outage.  And keep in mind that your office phones may be inoperable during the outage.  So please plan in advance for this outage.  
+
:'''WHAT:''' Most CS IT services will be ''un''available due to file server maintenance.
  
::<span style="color:#ff0000">'''NOTE TO CS SERVER ROOM (MH G-29) SERVER OWNERS:''' </span> Our server room will be out of power, so our servers will be unavailable.  If you host servers in the server room, your servers will be down as well.  Plan ahead of time to shut down and to bring back up your servers.  Your group is responsible for any systems you choose to shut down before the outage or boot back up after the outage.
+
:'''WHEN:'''  ''Tuesday, December 28, 5:30am to 7:30am.''
  
====Tracking Our CS IT Services Status Updates During The Outage====
+
:'''DETAILS:''' We will be performing maintenance on our two file servers, rtfm and barley, that will require downtime for both those systems and several other major CS IT services as well. The affected IT services will be unavailable on Tuesday, December 28, from 5:30am to 7:30am. Please see below for the list of affected services.
 
+
:Because we will not have power to our servers in Malone Hall, the CS IT Support Wiki, and especially this Notices page ( https://support.cs.jhu.edu/wiki/Notices ) will be unavailable during the outage.  Instead, during the outage, we have arranged for status updates to be available at the following website (served at an off-site facility):
+
=====CS IT Services That Will ''Not'' Be Available During The System Maintenance=====
 
 
::[https://csstatus.jhu.edu https://csstatus.jhu.edu]
 
 
 
:(Bookmark that link ahead of time, in case you can't access your CS mail during the outage.)
 
 
 
:As soon as we're able to do so after the outage, we'll also make this Notices page available again.
 
 
 
====CS IT Services ''Un''available During The Power Outage Include...====
 
 
 
* DNS resolution (hostname lookups) for all cs.jhu.edu hostnames will be unavailable.  This will affect all websites with cs.jhu.edu domain names, even if the website is hosted by someone other than the CS department.
 
  
* CS Mail service, both incoming and outgoing, will be suspended for CS Grad/Research Net users.  And some CS email services will not be available for CS Ugrad Net users.
+
* CS Mail service, both incoming and outgoing, will be suspended for CS Grad/Research Net users.  Some CS email services will not be available for CS Ugrad Net users.
** Incoming mail ''should'' be queued by the sender until our mail service is back up again. Outgoing mail will not be available.  
+
** Incoming mail ''should'' be queued by the sender until our mail service is back up again.
** Outgoing CS mail will not be available to Grad Net users, but since CS Ugrads can send through the JHU mail server, CS Ugrads might still be able to send email during the outage (just not from a Malone Hall–based computer.)
+
** Outgoing CS mail will not be available to Grad Net users, but since CS Ugrads can send through the JHU mail server, CS Ugrads might still be able to send email during the outage.
 
** IMAP, POP, and webmail (for both Grad/Research and Ugrad accounts) will be unavailable.
 
** IMAP, POP, and webmail (for both Grad/Research and Ugrad accounts) will be unavailable.
  
* '''No''' CS webpages will be available.  This includes the main CS website.  And, as mentioned above... because we will not have power to our servers, the CS IT Support Wiki, and especially its Notices page will be unavailable during the outage.  Please refer to https://csstatus.jhu.edu for status updates during the outage.
+
* '''No''' locally-stored CS webpages will be available.  The main CS website (run by WSE) will remain available, but, if you have a personal or lab page that we maintain locally in the dept, those will be unavailable.  The CS IT Support Wiki and its Notices page will remain available.  
  
* Grad/Research Net and Ugrad Net user accounts and home directories will be inaccessible during the power outage.
+
* Grad/Research Net and Ugrad Net user accounts and home directories will be inaccessible during the outage.
  
 
* ssh service to our CS Grad/Research Net & Ugrad Net Linux boxes (masters1 through masters16, ugrad1 through ugrad24, gradx, gradz, ugradx, and ugradz) will be unavailable.
 
* ssh service to our CS Grad/Research Net & Ugrad Net Linux boxes (masters1 through masters16, ugrad1 through ugrad24, gradx, gradz, ugradx, and ugradz) will be unavailable.
Line 254: Line 249:
 
* Console (desktop) access at any of our lab Linux client systems will be unavailable.
 
* Console (desktop) access at any of our lab Linux client systems will be unavailable.
  
* SMB (SAMBA) File Shares (the CS Office Staff and some others use these) will be unavailable.
+
* SMB (SAMBA) file shares (the CS Office Staff and some others use these) will be unavailable.
 +
 
 +
* MySQL service via the mysql.cs.jhu.edu server and the dbase.cs.jhu.edu server will be unavailable.
  
* MySQL service via the mysql.cs.jhu.edu server and through the dbase.cs.jhu.edu server will be unavailable.
+
:We will update this Notices page if there are changes or any delay in the restore time of our IT services.
 +
-->
 +
<!--
 +
*******************************************
 +
*********  POWER OUTAGE TEMPLATE***********
 +
*******************************************
  
* Network switches in the building will be without power, so no network connections in Malone Hall.
 
  
* Wifi access points in Malone Hall will be without power and will therefore not be available.
 
 
-->
 
-->
 
<!--
 
<!--
Line 299: Line 299:
  
 
== <span style="color:#ff0000">CS COMPUTING LAB AVAILABILITY </span> ==
 
== <span style="color:#ff0000">CS COMPUTING LAB AVAILABILITY </span> ==
 +
<!--  ***** NORMAL POSTING MH 122****** -->
 +
<br>
 +
 +
:'''MH 122''' (CS Undergrad Lab/Collaboration room) is available for in-person access.
 +
 +
 +
<!--:* As of August, 2022, masks are now '''''optional''''' in the lab-->
 +
 +
<!-- for those that are vaccinated '''''and''''' boosted.  Masks '''''continue''''' to be '''''required''''' for all others using this lab.-->
 +
<!--
 +
:'''MH 122 ''UNAVAILABILITY'''''
 +
 +
::'''WHAT:'''  MH 122 (and its breakout rooms) will be '''''closed''''' for  due to a Human Language Technology Center of Excellence (HLTCOE) workshop being held there. 
 +
::'''WHEN:''' Monday, Jan 8 through Friday, Jan 19, 2024.
 +
 +
::'''NOTES:'''
 +
:* The G-61 Masters/Ugrad Lab will remain open and available during this time period.  The G-61 printer will remain available as well.
 +
:* The MH 122 Linux systems, ugrad1 through ugrad12, will continue to be available, '''''but only remotely via ssh'''''.  Please see our page on:  [[Linux_Clients_on_the_CS_Undergrad_Net]]
 +
-->
 +
<!--
 +
<--  CLSP SUMMER PROGRAM
 +
:'''MH 122 ''UNAVAILABILITY'''''
 +
::'''WHAT:'''  MH 122 (and its breakout rooms) will be '''''closed''''' for the summer due to a CLSP workshop being held there. 
 +
::'''WHEN:''' Tuesday, June 7 through Wednesday, August 10.
 +
::'''NOTES:'''
 +
-->
 +
<!--
 +
:* The MH 122 Linux systems, ugrad1 through ugrad12, will continue to be available, '''''but only remotely via ssh'''''. There will be some downtime for those systems on 6/7 and on 8/9 (and possibly 8/10) as the systems are transferred from, and then, back to MH 122.  Please see our page on:  [[Linux_Clients_on_the_CS_Undergrad_Net]]
 +
<!--https://support.cs.jhu.edu/wiki/Linux_Clients_on_the_CS_Undergrad_Net-->
 +
<!--for a list of our remotely-available Ugrad Linux systems.
 +
-->
 +
<!--
 +
:* The printer in MH 122 will be ''unavailable'' during this time.
 +
-->
 +
<!--
 +
:* The G61 Masters/Ugrad Lab will remain open and available during the summer, and its Linux systems will be available for in-person and remote work, as usual. The G61 printer will remain available as well.
 +
-->
 +
<!-- ****** NORMAL POSTING G61 ********** -->
 +
:'''MH G61''' (CS Masters/Ugrad Labs) is available for in-person access.
 +
 +
<!--:* All CS Linux systems in this lab area (masters1 through masters16 and ugrad13 through ugrad24) are available for use in-person or remotely, via ssh.--> 
 +
 +
<!--
 +
******************************************************
 +
**** ACM CONTEST TEMPLATE - All CS Labs Closed on Friday/Saturday, Feb 23-24, 2024*****
 +
******************************************************
 +
-->
 +
<!--
 +
=== Malone '''MH 122''' ''and'' '''G61''' Ugrad and Masters Labs <span style="color:#ff0000"> '''''Closure'''''<span>===
 +
 +
:'''WHAT:''' Malone Hall MH 122 '''and''' Malone Hall G61, both the Masters and Ugrad sides of the lab, '''and ''all'' the lab Linux computers, will be closed to CS students due to an ACM Programming Contest.
 +
 +
:'''WHEN:'''  Starting Friday evening, Feb 23, 5pm '''through''' Saturday, February 24, 9pm.
 +
 +
:'''DETAILS:'''
 +
 +
: Both the MH 122 '''and''' G61 Masters and Ugrad Labs will be used for an ACM Programming Contest and will therefore be '''''closed''''' to those not participating in the contest.
 +
 +
: Additionally, all of the labs' Linux computers (grad1 through grad16 and ugrad1 through ugrad24) will be unavailable during the time period referenced above.
 +
 +
* During the lab closure times, compute servers, gradx.cs.jhu.edu, gradz.cs.jhu.edu, ugradx.cs.jhu.ed, and ugradz.cs.jhu.edu  '''''will continue to be available remotely''''', via SSH.
 +
 +
* We have to take down the lab systems late that Friday afternoon.  At the end of the ACM contest that Saturday night, the coordinators of that contest will be turning our lab computer systems back on.  Most should boot normally.  But, if some do not, just trying using an alternate one in the lab.  We'll be back in the Monday afterwards and can check on any systems that didn't boot normally.  (And don't forget, as mentioned above our compute servers -- gradx, gradz, ugradx, ugradz -- will continue to be remotely available, even if the lab systems are not.)
 +
 +
* The printers in MH 122 and MH G61 will remain online, but, please pick up your printouts outside of the contest hours.
 +
 +
-->
 +
<!-- ********* TEMPLATE FOR G61 Masters Closure for ACM Local Contest **********-->
 +
<!--
 +
: '''Malone G61 ''Masters Lab'' Closure'''
 +
 +
::'''WHAT:''' Malone Hall G61, '''the ''Masters'' side only''', will be closed to CS Masters students due to a ''local'' ACM Programming Contest.
 +
 +
::'''WHEN:'''  Saturday, February 4, from 1:30pm to 7pm.
 +
 +
::'''DETAILS:'''
 +
 +
:::The G61 Masters side of the lab will be used for an ACM Programming Contest and will therefore be closed for non-contest use during the 1:30 to 7pm time period on Feb. 4.  The Ugrad side will be unaffected, and Ugrad students may enter through the Master's side of the lab to get to the Undergrad side of the lab.
 +
 +
:::During the Masters lab closure times, the Masters computers in G61 will continue to be available remotely, via SSH.
 +
 +
::Please see our [https://support.cs.jhu.edu/wiki/Category:Labs Labs] page for further information about our labs.
 +
-->
 +
<!--
 +
******************************************************
 +
**** G61 Lab Closure Programming Contest TEMPLATE ****
 +
******************************************************
 +
=== Malone '''G61''' Masters Lab/Ugrad Lab '''Closure'''===
 +
 +
:'''WHAT:''' Malone Hall G61, both the Masters and Ugrad sides of the lab, will be closed to CS students due to the ACM Programming Contest.
 +
 +
:'''WHEN:'''  Saturday, February 26, from 11am to 7pm.
 +
 +
:'''DETAILS:'''
 +
 +
:The G61 Masters and Ugrad Labs will be used for an ACM Programming Contest and will therefore be closed for non-contest use during the 11am to 7pm time period on Feb. 26.
 +
 +
* During the lab closure times, the Masters and Ugrad Linux computers in G61 will continue to be available remotely, via SSH.
 +
 +
* Ugrad Lab, MH 122 will ''not be affected'' and will remain ''open'' during this time
 +
  
 
=== '''''UPDATE''''' - July 19, 2021 -  The CS Computing Labs are once again available for '''''in-person access'''''...===
 
=== '''''UPDATE''''' - July 19, 2021 -  The CS Computing Labs are once again available for '''''in-person access'''''...===
  
:'''MH-122''' (CS Undergrad Lab/Collaboration room):  Is now '''''available for in-person access'''''.
+
:'''MH 122''' (CS Undergrad Lab/Collaboration room):  Is now '''''available for in-person access'''''.
 
::All CS Linux systems in that room (ugrad1 through ugrad12) are available for use in-person or remotely, via ssh. <span style="color:#ff0000">Masks are required for entry.</span>
 
::All CS Linux systems in that room (ugrad1 through ugrad12) are available for use in-person or remotely, via ssh. <span style="color:#ff0000">Masks are required for entry.</span>
  
:'''G-61''' (CS Masters/Ugrad Labs): Is now '''''available for in-person access'''''.
+
:'''MH G61''' (CS Masters/Ugrad Labs): Is now '''''available for in-person access'''''.
 
::The Linux systems in this lab area (masters1 through masters16 and ugrad13 through ugrad24) are available for use in-person or remotely, via ssh. <span style="color:#ff0000">Masks are required for entry.</span>
 
::The Linux systems in this lab area (masters1 through masters16 and ugrad13 through ugrad24) are available for use in-person or remotely, via ssh. <span style="color:#ff0000">Masks are required for entry.</span>
  
Line 313: Line 414:
 
<!-- :None at this time. -->
 
<!-- :None at this time. -->
 
<!--PROGRAMMING CONTEST TEMPLATE -->
 
<!--PROGRAMMING CONTEST TEMPLATE -->
<!--    === MH-122 ''and'' MH G-61 (both CS Ugrad labs & the Masters Lab) CLOSURE ON Sat., Nov. 9===
+
<!--    === MH 122 ''and'' MH G61 (both CS Ugrad labs & the Masters Lab) CLOSURE ON Sat., Nov. 9===
  
'''WHAT:'''  The 1st floor CS Ugrad lab, MH-122, and both lab sides of the CS Masters/Ugrad Lab, MH G-61, will be closed due to an ACM Programming Contest.  
+
'''WHAT:'''  The 1st floor CS Ugrad lab, MH 122, and both lab sides of the CS Masters/Ugrad Lab, MH G61, will be closed due to an ACM Programming Contest.  
  
 
'''WHEN:'''  Saturday, November 9, from 9am - 7pm.  
 
'''WHEN:'''  Saturday, November 9, from 9am - 7pm.  
Line 328: Line 429:
 
 
 
 
 
:for a list of our remotely available Linux systems.              -->
 
:for a list of our remotely available Linux systems.              -->
 
 
 
<!--
 
<!--
 
*
 
*
Line 343: Line 442:
  
  
'''''WHERE:'''''  Malone Hall G-61, both the Masters and Ugrad sides of the lab.
+
'''''WHERE:'''''  Malone Hall G61, both the Masters and Ugrad sides of the lab.
  
 
'''''WHEN:'''''  Monday, March 14 & Tuesday, March 15, from 6am to 12 Noon.
 
'''''WHEN:'''''  Monday, March 14 & Tuesday, March 15, from 6am to 12 Noon.
Line 352: Line 451:
 
=====NOTES:=====
 
=====NOTES:=====
  
* During the lab closure times, the masters and ugrad Linux computers in G-61 will continue to be available remotely, via SSH.
+
* During the lab closure times, the masters and ugrad Linux computers in G61 will continue to be available remotely, via SSH.
  
 
* Ugrad Lab, MH 122 will not be affected and will remain open during those times.
 
* Ugrad Lab, MH 122 will not be affected and will remain open during those times.
Line 486: Line 585:
  
 
== <span style="color:#ff0000">AUDIO/VISUAL (A/V) OUTAGES</span> ==
 
== <span style="color:#ff0000">AUDIO/VISUAL (A/V) OUTAGES</span> ==
:None at this time.
+
:None at this time.  
  
 
[[Category:All]]
 
[[Category:All]]

Revision as of 17:07, 19 April 2024


CS IT STAFF AVAILABILITY

  • The CS IT Support staff is back in Malone Hall. Our group is working a hybrid schedule with some of us working remotely on certain days, while others of our team are on campus.
  • We continue being available M-F, 8:30 to 5pm, but there may be certain times we might be online only.
  • Therefore, please remember to email support@cs.jhu.edu for assistance.
  • Also, please have Zoom available on your device(s), so that we can arrange to contact you using that method, as an alternative to in-person communication.
  • For the time being, Steve DeBlasio, our accounts liaison, is providing a virtual version of his daily office hours for accounts, etc. Email support@cs.jhu.edu for details.


CS IT SERVICE OUTAGES (Unplanned & Planned)

UNPLANNED CS IT SERVICE OUTAGES

None at this time.


PLANNED CS IT SERVICE OUTAGES

None at this time.


CS COMPUTING LAB AVAILABILITY


MH 122 (CS Undergrad Lab/Collaboration room) is available for in-person access.


MH G61 (CS Masters/Ugrad Labs) is available for in-person access.


AUDIO/VISUAL (A/V) OUTAGES

None at this time.