Difference between revisions of "Notices"

(209 intermediate revisions by 2 users not shown)
Line 11: Line 11:
 
<br><p>
 
<br><p>
  
<!--== <span style="color:#ff0000">JHU IT SERVICE OUTAGES AFFECTING CS IT SERVICES<span>== -->
+
 
<!-- === PLANNED ''JHU'' SERVICE OUTAGES === -->
+
<!--
 +
== <span style="color:#ff0000">JHU IT SERVICE OUTAGES AFFECTING CS IT SERVICES<span>==  
 +
=== PLANNED ''JHU'' SERVICE OUTAGES ===
 +
-->
 +
 
 
<!-- TEMPLATE JHU Service Outages -->
 
<!-- TEMPLATE JHU Service Outages -->
 
<!--
 
<!--
'''JHU OUTAGE AFFECTING CS:'''
+
{{outage
 
+
  |type=Planned JHU outage
:'''WHAT:'''  Potentially multiple, less-than-10-second '''''power''''' outages in Malone Hall (& Hackerman)
+
  |services=Malone Hall
 
+
  |time=Friday, March 10, starting around 11am and lasting until completed
:'''WHEN:''' Thursday, July 25, from 3:30am through 6am.
+
  |summary=Wi-Fi access point replacement
 
+
  |details=JHU Networking will be swapping out all of the Hopkins-managed Malone Hall ''wifi'' access points in the building. They plan to start work around 11am that Friday, and they expect it could take 4 hours, more or less, to replace them all.  During that time, wifi access might disappear and reappear. Additionally, when your wireless device tries to reconnect to the newly-replaced access point, you ''might'' be prompted to accept a certificate, and we were informed that you should do so.<br/>
:'''DETAILS:'''
+
<br/>
 
+
After the wifi outage, if you continue to have issues with your device, '''''please contact JHU IT directly...''''' Visit [[Wireless Networking]] for details on who to contact for assistance.
 +
}}
 +
-->
 +
<!--
 
::JHU Networking has indicated they are testing power transfer equipment in Mason Hall that will affect several buildings, including Malone and Hackerman.  They will be cycling power to the buildings, perhaps several times.  They expect their outages to be < 10 seconds each.
 
::JHU Networking has indicated they are testing power transfer equipment in Mason Hall that will affect several buildings, including Malone and Hackerman.  They will be cycling power to the buildings, perhaps several times.  They expect their outages to be < 10 seconds each.
  
Line 51: Line 58:
 
-->
 
-->
  
 +
== <span style="color:#ff0000">CS IT SERVICE OUTAGES (Unplanned & Planned)<span>==
 +
 +
<!--
 +
=== UNPLANNED ''JHU'' SERVICE OUTAGES ===
  
== <span style="color:#ff0000">CS IT SERVICE OUTAGES <span>==
+
====<span style="color:#ff0000">9/29/23 MAJOR JHU email outage and delays</span>====
  
<!--=== UNPLANNED ''JHU'' SERVICE OUTAGES ===-->
+
:JHU is experiencing email issues with it's @jhu.edu mail services due to a global outage at Cisco.  This affects both incoming and outgoing email messages to external recipients.  It also impacts systems that send email through JHU's email gateways.  Expect major mail delays until this is fixed.  (We suspect that those with @jhu.edu addresses can still send and receive to others with @jhu.edu addresses.)
  
 +
:'''''UPDATE:'''''  JHU has implemented a work-around to the email problem, and email delivery has returned to normal.
 +
-->
 
<!--TEMPLATE
 
<!--TEMPLATE
::'''WHAT:'''
+
{{outage
 
+
  |services=
::'''WHEN:'''
+
  |summary=
 
+
  |time=
::'''DETAILS:''' -->
+
  |details=
 +
}}
 +
-->
  
 
<!-- <br>-->
 
<!-- <br>-->
  
 
=== UNPLANNED CS IT SERVICE OUTAGES ===
 
=== UNPLANNED CS IT SERVICE OUTAGES ===
<!--:'''WHAT:''' G61's MHG61PRT printer is down for repair.
 
 
:'''WHEN:'''  Started Aug 26, 2021 at 11am
 
 
:'''DETAILS:''' The HP printer in G-61, MHG61PRT is down for repair.  The repair company needs to order a part.  It is unknown when the part will become available and installed. 
 
  
:In the meantime, please use the printer in MH-122, MH122PRT.
 
  
:Other available printers can be found at:  [[Available Printers]]  -->
 
 
<!--TEMPLATE
 
<!--TEMPLATE
 
{{outage
 
{{outage
   |time=
+
   |time=Started Aug 15, 2022 around 7am
   |services=
+
   |services=MH-122's MH122PRT printer
   |summary=
+
   |summary=The HP printer in MH-122, mh122prt, is down due to a fuser error.  Service has been called.
 +
  |details=In the meantime, please use the printer in MH-G61, mhG61prt.<br/>
 +
<br/>
 +
Other available printers can be found at:  [[Available Printers]]
 
}}
 
}}
 
-->
 
-->
  
:None at this time
+
:None at this time.
<br>
+
 
 
<!--====<span style="color:#0000ff">PHISHING EMAIL AND OTHER ACCOUNT ISSUES!</span>====
 
<!--====<span style="color:#0000ff">PHISHING EMAIL AND OTHER ACCOUNT ISSUES!</span>====
  
Line 95: Line 106:
  
 
  </div>-->
 
  </div>-->
 
 
<!--:None at this time.-->
 
<!--:None at this time.-->
  
 
=== PLANNED CS IT SERVICE OUTAGES ===
 
=== PLANNED CS IT SERVICE OUTAGES ===
  
 +
:None at this time.
 +
<!--
 +
 +
====Major Malone Power Outage Planned (Affecting CS IT Services) - Saturday, March 30 from 6am to 2:30pm (CS IT Services Outage before and after Power Outage as well)====
 +
 +
:'''WHAT:''' There will be '''''no''''' CS IT computing services available during an upcoming all-day major power outage for ALL of Malone Hall.
 +
 +
:'''WHEN:'''  Power Outage - Saturday, March 30, 2024, starting at '''6am''' and running until '''2:30pm''' (so, roughly, 8.5 hours.)
 +
 +
:: Loss of CS IT services - Saturday, March 30, 2024, starting at '''5am''' (one hour before the power outage) and lasting until '''4:30pm''' (two hours after the power outage is completed.)
 +
 +
:'''DESCRIPTION:'''  JHU is planning an a all-day power outage for Malone Hall, and all of our computing services will be unavailable during that time.
 +
 +
:The actual power outage is planned to start at 6am, Saturday morning, March 30,, and will continue  for approximately an 8.5 hours.  '''''However,''''' we need to safely bring down our computer servers and clients ''earlier'' than that (before the power goes out.)  We plan to bring our systems down that morning around '''5am'''.  And although the power to the building should restored around 2:30pm that same day, we will not have all our systems back up and running until approx. 4:30pm, so plan on about 2 hours after the power outage is deemed over until our servers and services are available again.
 +
 +
:<span style="color:#ff0000">Please read all of the notes below regarding Malone Hall Residents, CS Server Room users, and a list of the CS IT services that will be unavailable during the outage. </span>
 +
 +
::<span style="color:#ff0000">'''NOTES TO MALONE HALL RESIDENTS:'''</span>  During the time of the outage, we're assuming most building lights will be out and the J-Card system might be out too.  That might make it more difficult to get into the building during the outage.  But with the power out, we're not sure how much need there will be for anyone to be in the building during that time anyway.  If you have an office refrigerator, expect that to be out too.  If you are counting on your UPS (battery-backup) systems to continue powering your office equipment, keep in mind the expected length of the outage (8 hours) and plan for a longer period of time, just to be safe.  And keep in mind that your office phones may be inoperable during the outage.  So please plan in advance for this outage.
 +
 +
::<span style="color:#ff0000">'''NOTE TO CS SERVER ROOM (MH G-29) SERVER OWNERS:''' </span>  Our server room will be out of power, so our servers will be unavailable.  If you host servers in the server room, your servers will be down as well.  Plan ahead of time to shut down and to bring back up your servers.  Your group is responsible for any systems you choose to shut down before the outage or boot back up after the outage.
 +
 +
=====Tracking Our CS IT Services Status Updates During The Outage=====
 +
 +
:Because we will not have power to our servers in Malone Hall, the CS IT Support Wiki, and especially this Notices page ( https://support.cs.jhu.edu/wiki/Notices ) will be unavailable during the outage.  Instead, during the outage, we have arranged for status updates to be available at the following website (served at an off-site facility):
 +
 +
::[https://csstatus.jhu.edu https://csstatus.jhu.edu]  We will update that page soon with this information.
 +
 +
:(Bookmark that link ahead of time, in case you can't access your CS mail during the outage.)
 +
 +
:As soon as we're able to do so after the outage, we'll also make this Notices page available again.
 +
 +
=====CS IT Services ''Un''available During The Power Outage Include...=====
 +
 +
* DNS resolution (hostname lookups) for all cs.jhu.edu hostnames will be unavailable.  This will affect all websites with cs.jhu.edu domain names, even if the website is hosted by someone other than the CS department.
 +
 +
* CS Mail service, both incoming and outgoing, will be suspended for CS Grad/Research Net users.  And some CS email services will not be available for CS Ugrad Net users.
 +
** Incoming mail ''should'' be queued by the sender until our mail service is back up again. Outgoing mail will not be available.
 +
** Outgoing CS mail will not be available to Grad Net users, but since CS Ugrads can send through the JHU mail server, CS Ugrads might still be able to send email during the outage (just not from a Malone Hall–based computer.)
 +
** IMAP, POP, and webmail (for both Grad/Research and Ugrad accounts) will be unavailable.
 +
 +
* '''No''' CS webpages will be available.  This includes the main CS website.  And, as mentioned above... because we will not have power to our servers, the CS IT Support Wiki, and especially its Notices page will be unavailable during the outage.  Please refer to https://csstatus.jhu.edu for status updates during the outage.
 +
 +
* Grad/Research Net and Ugrad Net user accounts and home directories will be inaccessible during the power outage.
 +
 +
* ssh service to our CS Grad/Research Net & Ugrad Net Linux boxes (masters1 through masters16, ugrad1 through ugrad24, gradx, gradz, ugradx, and ugradz) will be unavailable.
 +
 +
* Console (desktop) access at any of our lab Linux client systems will be unavailable.
 +
 +
* SMB (SAMBA) File Shares (the CS Office Staff and some others use these) will be unavailable.
 +
 +
* MySQL service via the mysql.cs.jhu.edu server and through the dbase.cs.jhu.edu server will be unavailable.
 +
 +
* Network switches in the building will be without power, so no network connections in Malone Hall.
 +
 +
* Wifi access points in Malone Hall will be without power and will therefore not be available.
 +
<br>
 +
-->
 +
<!--
 
{{outage
 
{{outage
 +
  |type=Planned outage
 +
  |services=most CS IT services
 +
  |time=Tuesday, December 27, 9:00 am to 12:00 pm
 +
  |summary=Most CS IT services will be unavailable due to file server maintenance.
 +
  |details=We will be performing maintenance on our several of servers. This will require downtime for several major CS IT services.  The affected IT services will be unavailable on the morning of Tuesday, December 27, starting at 9:00 am.  Most services should be restored before 10:00 am, but services depending on the ugrad file server will remain unavailable for longer.  Please see below for the list of affected services.<br/>
 +
<br/>
 +
'''CS IT Services That Will Not Be Available During The System Maintenance:'''<br/>
 +
 +
* CS mail service, both incoming and outgoing, will be suspended for CS Grad/Research Net users.  Some CS email services will not be available for CS Ugrad Net users.  Incoming mail should be queued by the sender until our mail service is back up again.  Outgoing CS mail will not be available to Grad Net users.  CS ugrads can send through the JHU mail server, which will remain available.  We expect mail service to be restored by 10:00 am, but see below about mail retrieval for ugrad accounts.
 +
 +
* IMAP, POP, and webmail (for both Grad/Research and Ugrad accounts) will be unavailable.  We expect Grad Net email to be full operational by 10:00 am.  Ugrad IMAP, POP, and webmail should be available by 12:00 pm.
 +
 +
* No locally-stored CS webpages will be available. The main CS website (run by WSE) will remain available, but some individual pages may fail to load.  Personal webpages (both grad and ugrad) will not load.  Other websites hosted by us for department affiliates (e.g. lab websites) will be unavailable.  The CS IT Support Wiki and its Notices page will remain available.  We expect all service interruptions for the main webserver (www.cs.jhu.edu) and hosted websites to be completed before 10:00 am. Ugrad personal webpages should be available again by 12:00 pm.
 +
 +
* Grad/Research Net and Ugrad Net user accounts and home directories will be inaccessible during the services outage.  We expect Grad Net services to be restored by 10:00 am and Ugrad Net services by 12:00 pm.
 +
 +
* ssh service to our CS Grad/Research Net & Ugrad Net Linux boxes (masters1 through masters16, ugrad1 through ugrad24, gradx, gradz, ugradx,and ugradz) will be unavailable.  We expect Grad Net services to be restored by 10:00 am and Ugrad Net services by 12:00 pm.
 +
 +
* Console (desktop) access at any of our lab Linux client systems will be unavailable.  We expect Grad Net systems to be available again by 10:00 am and Ugrad Net systems by 12:00 pm.
 +
 +
* SMB (Samba) file shares (the CS office staff and some others use these) will be unavailable.  We expect them to be available again by 10:00 am.
 +
 +
* MySQL service via the mysql.cs.jhu.edu server and the dbase.cs.jhu.edu server will be unavailable.  We expect mysql.cs.jhu.edu to be available by 10:00am and dbase.cs.jhu.edu by 12:00 pm.
 +
}}
 +
-->
 +
 +
 +
<!--{{outage
 
   |type=Limited availability
 
   |type=Limited availability
 
   |time=June 10 through August 10, 2022
 
   |time=June 10 through August 10, 2022
 
   |services=ugrad1 through ugrad12
 
   |services=ugrad1 through ugrad12
 
   |summary=''ugrad1'' through ''ugrad12'' will only be available remotely through SSH.  Please see the CS Computing Lab Availability section below for details.
 
   |summary=''ugrad1'' through ''ugrad12'' will only be available remotely through SSH.  Please see the CS Computing Lab Availability section below for details.
}}
+
}}-->
 
 
<!--:None at this time-->
 
 
 
 
<!--
 
<!--
 
*******************************************
 
*******************************************
Line 167: Line 260:
 
*******************************************
 
*******************************************
  
====Major Malone Power Outage Planned, Affecting CS IT Service - October 23 & 24, 2021====
 
 
:'''WHAT:''' There will be '''''no''''' CS IT computing services available during an upcoming major power outage for ALL of Malone Hall.
 
 
:'''WHEN:'''  Saturday, October 23, 2021,  starting at '''3''pm''''' and running until Sunday, October 24, 2021, sometime around '''6''am'''''.
 
 
:'''DESCRIPTION:'''  JHU is planning an a power outage for Malone Hall, and all of our computing services will be unavailable during that time.
 
 
:The actual power outage is now planned to start at 4pm, Saturday afternoon, October 23, and will continue overnight until Sunday morning, October 24 at 4am.  However, we need to safely bring down our computer servers and clients earlier than that (before the power goes out.)  We plan to bring our systems down around '''3pm''' that Saturday afternoon.  And although the power should be up around 4am Sunday morning, we will not have all our systems back up and running until approx. 6am, so plan on about 2 hours after the power outage is deemed over until our servers and services are available again.
 
 
 
:<span style="color:#ff0000">Please read all of the notes below regarding Malone Hall Residents, CS Server Room users, and a list of the CS IT services that will be unavailable during the outage. </span>
 
  
::<span style="color:#ff0000">'''NOTES TO MALONE HALL RESIDENTS:'''</span>  During the time of the outage, we're assuming most building lights will be out and the J-Card system might be out too.  That might make it more difficult to get into the building during the outage.  But with the power out, we're not sure how much need there will be for anyone to be in the building during that time anyway.  If you have an office refrigerator, expect that to be out too.  If you are counting on your UPS (battery-backup) systems to continue powering your office equipment, please realize that this is an expected over-12-hour outage.  And keep in mind that your office phones may be inoperable during the outage.  So please plan in advance for this outage.
 
 
::<span style="color:#ff0000">'''NOTE TO CS SERVER ROOM (MH G-29) SERVER OWNERS:''' </span>  Our server room will be out of power, so our servers will be unavailable.  If you host servers in the server room, your servers will be down as well.  Plan ahead of time to shut down and to bring back up your servers.  Your group is responsible for any systems you choose to shut down before the outage or boot back up after the outage.
 
 
====Tracking Our CS IT Services Status Updates During The Outage====
 
 
:Because we will not have power to our servers in Malone Hall, the CS IT Support Wiki, and especially this Notices page ( https://support.cs.jhu.edu/wiki/Notices ) will be unavailable during the outage.  Instead, during the outage, we have arranged for status updates to be available at the following website (served at an off-site facility):
 
 
::[https://csstatus.jhu.edu https://csstatus.jhu.edu]
 
 
:(Bookmark that link ahead of time, in case you can't access your CS mail during the outage.)
 
 
:As soon as we're able to do so after the outage, we'll also make this Notices page available again.
 
 
====CS IT Services ''Un''available During The Power Outage Include...====
 
 
* DNS resolution (hostname lookups) for all cs.jhu.edu hostnames will be unavailable.  This will affect all websites with cs.jhu.edu domain names, even if the website is hosted by someone other than the CS department.
 
 
* CS Mail service, both incoming and outgoing, will be suspended for CS Grad/Research Net users.  And some CS email services will not be available for CS Ugrad Net users.
 
** Incoming mail ''should'' be queued by the sender until our mail service is back up again. Outgoing mail will not be available.
 
** Outgoing CS mail will not be available to Grad Net users, but since CS Ugrads can send through the JHU mail server, CS Ugrads might still be able to send email during the outage (just not from a Malone Hall–based computer.)
 
** IMAP, POP, and webmail (for both Grad/Research and Ugrad accounts) will be unavailable.
 
 
* '''No''' CS webpages will be available.  This includes the main CS website.  And, as mentioned above... because we will not have power to our servers, the CS IT Support Wiki, and especially its Notices page will be unavailable during the outage.  Please refer to https://csstatus.jhu.edu for status updates during the outage.
 
 
* Grad/Research Net and Ugrad Net user accounts and home directories will be inaccessible during the power outage.
 
 
* ssh service to our CS Grad/Research Net & Ugrad Net Linux boxes (masters1 through masters16, ugrad1 through ugrad24, gradx, gradz, ugradx, and ugradz) will be unavailable.
 
 
* Console (desktop) access at any of our lab Linux client systems will be unavailable.
 
 
* SMB (SAMBA) File Shares (the CS Office Staff and some others use these) will be unavailable.
 
 
* MySQL service via the mysql.cs.jhu.edu server and through the dbase.cs.jhu.edu server will be unavailable.
 
 
* Network switches in the building will be without power, so no network connections in Malone Hall.
 
 
* Wifi access points in Malone Hall will be without power and will therefore not be available.
 
 
-->
 
-->
 
<!--
 
<!--
Line 256: Line 299:
  
 
== <span style="color:#ff0000">CS COMPUTING LAB AVAILABILITY </span> ==
 
== <span style="color:#ff0000">CS COMPUTING LAB AVAILABILITY </span> ==
 +
<!--  ***** NORMAL POSTING MH 122****** -->
 +
<br>
  
<!--:'''MH-122''' (CS Undergrad Lab/Collaboration room): Is available for in-person access.
+
:'''MH 122''' (CS Undergrad Lab/Collaboration room) is available for in-person access.
  
:::::All CS Linux systems from that room (ugrad1 through ugrad12) are available for use in-person or remotely, via ssh. Masks are once again '''''required''''' in the lab --> <!-- for those that are vaccinated '''''and''''' boosted.  Masks '''''continue''''' to be '''''required''''' for all others using this lab.-->
 
:'''MH-122 ''UNAVAILABILITY'''''
 
  
::'''WHAT:'''  MH-122 (and its breakout rooms) will be '''''closed''''' for the summer due to a CLSP workshop being held there.   
+
<!--:* As of August, 2022, masks are now '''''optional''''' in the lab-->
 +
 
 +
<!-- for those that are vaccinated '''''and''''' boosted.  Masks '''''continue''''' to be '''''required''''' for all others using this lab.-->
 +
<!--
 +
:'''MH 122 ''UNAVAILABILITY'''''
 +
 
 +
::'''WHAT:'''  MH 122 (and its breakout rooms) will be '''''closed''''' for  due to a Human Language Technology Center of Excellence (HLTCOE) workshop being held there. 
 +
::'''WHEN:''' Monday, Jan 8 through Friday, Jan 19, 2024.
 +
 
 +
::'''NOTES:'''
 +
:* The G-61 Masters/Ugrad Lab will remain open and available during this time period.  The G-61 printer will remain available as well.
 +
:* The MH 122 Linux systems, ugrad1 through ugrad12, will continue to be available, '''''but only remotely via ssh'''''.  Please see our page on:  [[Linux_Clients_on_the_CS_Undergrad_Net]]
 +
-->
 +
<!--
 +
<-- CLSP SUMMER PROGRAM
 +
:'''MH 122 ''UNAVAILABILITY'''''
 +
::'''WHAT:'''  MH 122 (and its breakout rooms) will be '''''closed''''' for the summer due to a CLSP workshop being held there.   
 
::'''WHEN:''' Tuesday, June 7 through Wednesday, August 10.
 
::'''WHEN:''' Tuesday, June 7 through Wednesday, August 10.
 
::'''NOTES:'''
 
::'''NOTES:'''
 +
-->
 +
<!--
 +
:* The MH 122 Linux systems, ugrad1 through ugrad12, will continue to be available, '''''but only remotely via ssh'''''. There will be some downtime for those systems on 6/7 and on 8/9 (and possibly 8/10) as the systems are transferred from, and then, back to MH 122.  Please see our page on:  [[Linux_Clients_on_the_CS_Undergrad_Net]]
 +
<!--https://support.cs.jhu.edu/wiki/Linux_Clients_on_the_CS_Undergrad_Net-->
 +
<!--for a list of our remotely-available Ugrad Linux systems.
 +
-->
 +
<!--
 +
:* The printer in MH 122 will be ''unavailable'' during this time.
 +
-->
 +
<!--
 +
:* The G61 Masters/Ugrad Lab will remain open and available during the summer, and its Linux systems will be available for in-person and remote work, as usual. The G61 printer will remain available as well.
 +
-->
 +
<!-- ****** NORMAL POSTING G61 ********** -->
 +
:'''MH G61''' (CS Masters/Ugrad Labs) is available for in-person access.
  
:* The MH-122 Linux systems, ugrad1 through ugrad12, will continue to be available, '''''but only remotely via ssh'''''. There will be some downtime for those systems on 6/7 and on 8/9 (and possibly 8/10) as the systems are transferred from, and then, back to MH-122.   Please see our page on:  [[Linux_Clients_on_the_CS_Undergrad_Net]]  <!--https://support.cs.jhu.edu/wiki/Linux_Clients_on_the_CS_Undergrad_Net-->  for a list of our remotely-available Ugrad Linux systems.
+
<!--:* All CS Linux systems in this lab area (masters1 through masters16 and ugrad13 through ugrad24) are available for use in-person or remotely, via ssh.-->   
  
:* The printer in MH-122 will be ''unavailable'' during this time.
+
<!--
 +
******************************************************
 +
**** ACM CONTEST TEMPLATE - All CS Labs Closed on Friday/Saturday, Feb 23-24, 2024*****
 +
******************************************************
 +
-->
 +
<!--
 +
=== Malone '''MH 122''' ''and'' '''G61''' Ugrad and Masters Labs <span style="color:#ff0000"> '''''Closure'''''<span>===
  
:* The G-61 Masters/Ugrad Lab will remain open and available during the summer, and its Linux systems will be available for in-person and remote work, as usual. The G-61 printer will remain available as well.
+
:'''WHAT:''' Malone Hall MH 122 '''and''' Malone Hall G61, both the Masters and Ugrad sides of the lab, '''and ''all'' the lab Linux computers, will be closed to CS students due to an ACM Programming Contest.
  
 +
:'''WHEN:'''  Starting Friday evening, Feb 23, 5pm '''through''' Saturday, February 24, 9pm.
  
:'''G-61''' (CS Masters/Ugrad Labs): Is now available for in-person access.
+
:'''DETAILS:'''  
  
::The Linux systems in this lab area (masters1 through masters16 and ugrad13 through ugrad24) are available for use in-person or remotely, via ssh. Masks are once again '''''required''''' in the lab <!-- for those that are vaccinated '''''and''''' boosted.  Masks '''''continue''''' to be '''''required''''' for all others using this lab.-->
+
: Both the MH 122 '''and''' G61 Masters and Ugrad Labs will be used for an ACM Programming Contest and will therefore be '''''closed''''' to those not participating in the contest.
  
:Please see our [https://support.cs.jhu.edu/wiki/Category:Labs Labs] page for further information.
+
: Additionally, all of the labs' Linux computers (grad1 through grad16 and ugrad1 through ugrad24) will be unavailable during the time period referenced above.
 +
 
 +
* During the lab closure times, compute servers, gradx.cs.jhu.edu, gradz.cs.jhu.edu, ugradx.cs.jhu.ed, and ugradz.cs.jhu.edu  '''''will continue to be available remotely''''', via SSH.
 +
 
 +
* We have to take down the lab systems late that Friday afternoon.  At the end of the ACM contest that Saturday night, the coordinators of that contest will be turning our lab computer systems back on.  Most should boot normally.  But, if some do not, just trying using an alternate one in the lab.  We'll be back in the Monday afterwards and can check on any systems that didn't boot normally.  (And don't forget, as mentioned above our compute servers -- gradx, gradz, ugradx, ugradz -- will continue to be remotely available, even if the lab systems are not.)
 +
 
 +
* The printers in MH 122 and MH G61 will remain online, but, please pick up your printouts outside of the contest hours.
 +
 
 +
-->
 +
<!-- ********* TEMPLATE FOR G61 Masters Closure for ACM Local Contest **********-->
 +
<!--
 +
: '''Malone G61 ''Masters Lab'' Closure'''
 +
 
 +
::'''WHAT:''' Malone Hall G61, '''the ''Masters'' side only''', will be closed to CS Masters students due to a ''local'' ACM Programming Contest.
 +
 
 +
::'''WHEN:'''  Saturday, February 4, from 1:30pm to 7pm.
 +
 
 +
::'''DETAILS:'''
 +
 
 +
:::The G61 Masters side of the lab will be used for an ACM Programming Contest and will therefore be closed for non-contest use during the 1:30 to 7pm time period on Feb. 4.  The Ugrad side will be unaffected, and Ugrad students may enter through the Master's side of the lab to get to the Undergrad side of the lab.
 +
 
 +
:::During the Masters lab closure times, the Masters computers in G61 will continue to be available remotely, via SSH.
 +
 
 +
::Please see our [https://support.cs.jhu.edu/wiki/Category:Labs Labs] page for further information about our labs.
 +
-->
 
<!--
 
<!--
 
******************************************************
 
******************************************************
 
**** G61 Lab Closure Programming Contest TEMPLATE ****
 
**** G61 Lab Closure Programming Contest TEMPLATE ****
 
******************************************************
 
******************************************************
=== Malone '''G-61''' Masters Lab/Ugrad Lab '''Closure'''===
+
=== Malone '''G61''' Masters Lab/Ugrad Lab '''Closure'''===
  
:'''WHAT:''' Malone Hall G-61, both the Masters and Ugrad sides of the lab, will be closed to CS students due to the ACM Programming Contest.
+
:'''WHAT:''' Malone Hall G61, both the Masters and Ugrad sides of the lab, will be closed to CS students due to the ACM Programming Contest.
  
 
:'''WHEN:'''  Saturday, February 26, from 11am to 7pm.
 
:'''WHEN:'''  Saturday, February 26, from 11am to 7pm.
Line 290: Line 394:
 
:'''DETAILS:'''  
 
:'''DETAILS:'''  
  
:The G-61 Masters and Ugrad Labs will be used for an ACM Programming Contest and will therefore be closed for non-contest use during the 11am to 7pm time period on Feb. 26.
+
:The G61 Masters and Ugrad Labs will be used for an ACM Programming Contest and will therefore be closed for non-contest use during the 11am to 7pm time period on Feb. 26.
  
* During the lab closure times, the Masters and Ugrad Linux computers in G-61 will continue to be available remotely, via SSH.
+
* During the lab closure times, the Masters and Ugrad Linux computers in G61 will continue to be available remotely, via SSH.
  
 
* Ugrad Lab, MH 122 will ''not be affected'' and will remain ''open'' during this time
 
* Ugrad Lab, MH 122 will ''not be affected'' and will remain ''open'' during this time
Line 299: Line 403:
 
=== '''''UPDATE''''' - July 19, 2021 -  The CS Computing Labs are once again available for '''''in-person access'''''...===
 
=== '''''UPDATE''''' - July 19, 2021 -  The CS Computing Labs are once again available for '''''in-person access'''''...===
  
:'''MH-122''' (CS Undergrad Lab/Collaboration room):  Is now '''''available for in-person access'''''.
+
:'''MH 122''' (CS Undergrad Lab/Collaboration room):  Is now '''''available for in-person access'''''.
 
::All CS Linux systems in that room (ugrad1 through ugrad12) are available for use in-person or remotely, via ssh. <span style="color:#ff0000">Masks are required for entry.</span>
 
::All CS Linux systems in that room (ugrad1 through ugrad12) are available for use in-person or remotely, via ssh. <span style="color:#ff0000">Masks are required for entry.</span>
  
:'''G-61''' (CS Masters/Ugrad Labs): Is now '''''available for in-person access'''''.
+
:'''MH G61''' (CS Masters/Ugrad Labs): Is now '''''available for in-person access'''''.
 
::The Linux systems in this lab area (masters1 through masters16 and ugrad13 through ugrad24) are available for use in-person or remotely, via ssh. <span style="color:#ff0000">Masks are required for entry.</span>
 
::The Linux systems in this lab area (masters1 through masters16 and ugrad13 through ugrad24) are available for use in-person or remotely, via ssh. <span style="color:#ff0000">Masks are required for entry.</span>
  
Line 310: Line 414:
 
<!-- :None at this time. -->
 
<!-- :None at this time. -->
 
<!--PROGRAMMING CONTEST TEMPLATE -->
 
<!--PROGRAMMING CONTEST TEMPLATE -->
<!--    === MH-122 ''and'' MH G-61 (both CS Ugrad labs & the Masters Lab) CLOSURE ON Sat., Nov. 9===
+
<!--    === MH 122 ''and'' MH G61 (both CS Ugrad labs & the Masters Lab) CLOSURE ON Sat., Nov. 9===
  
'''WHAT:'''  The 1st floor CS Ugrad lab, MH-122, and both lab sides of the CS Masters/Ugrad Lab, MH G-61, will be closed due to an ACM Programming Contest.  
+
'''WHAT:'''  The 1st floor CS Ugrad lab, MH 122, and both lab sides of the CS Masters/Ugrad Lab, MH G61, will be closed due to an ACM Programming Contest.  
  
 
'''WHEN:'''  Saturday, November 9, from 9am - 7pm.  
 
'''WHEN:'''  Saturday, November 9, from 9am - 7pm.  
Line 325: Line 429:
 
 
 
 
 
:for a list of our remotely available Linux systems.              -->
 
:for a list of our remotely available Linux systems.              -->
 
 
 
<!--
 
<!--
 
*
 
*
Line 340: Line 442:
  
  
'''''WHERE:'''''  Malone Hall G-61, both the Masters and Ugrad sides of the lab.
+
'''''WHERE:'''''  Malone Hall G61, both the Masters and Ugrad sides of the lab.
  
 
'''''WHEN:'''''  Monday, March 14 & Tuesday, March 15, from 6am to 12 Noon.
 
'''''WHEN:'''''  Monday, March 14 & Tuesday, March 15, from 6am to 12 Noon.
Line 349: Line 451:
 
=====NOTES:=====
 
=====NOTES:=====
  
* During the lab closure times, the masters and ugrad Linux computers in G-61 will continue to be available remotely, via SSH.
+
* During the lab closure times, the masters and ugrad Linux computers in G61 will continue to be available remotely, via SSH.
  
 
* Ugrad Lab, MH 122 will not be affected and will remain open during those times.
 
* Ugrad Lab, MH 122 will not be affected and will remain open during those times.
Line 483: Line 585:
  
 
== <span style="color:#ff0000">AUDIO/VISUAL (A/V) OUTAGES</span> ==
 
== <span style="color:#ff0000">AUDIO/VISUAL (A/V) OUTAGES</span> ==
:None at this time.  But, note that the A/V equipment in MH-122 is unavailable since the room is unavailable for Summer, 2022.  See above for details.
+
:None at this time.  
  
 
[[Category:All]]
 
[[Category:All]]

Revision as of 17:07, 19 April 2024


CS IT STAFF AVAILABILITY

  • The CS IT Support staff is back in Malone Hall. Our group is working a hybrid schedule with some of us working remotely on certain days, while others of our team are on campus.
  • We continue being available M-F, 8:30 to 5pm, but there may be certain times we might be online only.
  • Therefore, please remember to email support@cs.jhu.edu for assistance.
  • Also, please have Zoom available on your device(s), so that we can arrange to contact you using that method, as an alternative to in-person communication.
  • For the time being, Steve DeBlasio, our accounts liaison, is providing a virtual version of his daily office hours for accounts, etc. Email support@cs.jhu.edu for details.


CS IT SERVICE OUTAGES (Unplanned & Planned)

UNPLANNED CS IT SERVICE OUTAGES

None at this time.


PLANNED CS IT SERVICE OUTAGES

None at this time.


CS COMPUTING LAB AVAILABILITY


MH 122 (CS Undergrad Lab/Collaboration room) is available for in-person access.


MH G61 (CS Masters/Ugrad Labs) is available for in-person access.


AUDIO/VISUAL (A/V) OUTAGES

None at this time.