|
|
(70 intermediate revisions by 2 users not shown) |
Line 16: |
Line 16: |
| === PLANNED ''JHU'' SERVICE OUTAGES === | | === PLANNED ''JHU'' SERVICE OUTAGES === |
| --> | | --> |
− |
| |
− | <!-- TEMPLATE JHU Service Outages -->
| |
| <!-- | | <!-- |
− | {{outage
| + | === UNPLANNED ''JHU'' SERVICE OUTAGES === |
− | |type=Planned JHU outage
| |
− | |services=Malone Hall
| |
− | |time=Friday, March 10, starting around 11am and lasting until completed
| |
− | |summary=Wi-Fi access point replacement
| |
− | |details=JHU Networking will be swapping out all of the Hopkins-managed Malone Hall ''wifi'' access points in the building. They plan to start work around 11am that Friday, and they expect it could take 4 hours, more or less, to replace them all. During that time, wifi access might disappear and reappear. Additionally, when your wireless device tries to reconnect to the newly-replaced access point, you ''might'' be prompted to accept a certificate, and we were informed that you should do so.<br/>
| |
− | <br/>
| |
− | After the wifi outage, if you continue to have issues with your device, '''''please contact JHU IT directly...''''' Visit [[Wireless Networking]] for details on who to contact for assistance.
| |
− | }}
| |
− | -->
| |
− | <!--
| |
− | ::JHU Networking has indicated they are testing power transfer equipment in Mason Hall that will affect several buildings, including Malone and Hackerman. They will be cycling power to the buildings, perhaps several times. They expect their outages to be < 10 seconds each.
| |
− | | |
− | ::Our CS IT servers that provide you most of our IT services should remain up and running, since our servers have backup battery power. Unfortunately, the JHU network in the building does not. So, you will probably experience brief network interruptions when the power is cycled by Facilities. And each time the power is out, CS services that you interact with (email, web, home directories, etc.) will be inaccessible due to the building's network being unavailable during the outage times.
| |
− | | |
− | ::Faculty who run their own servers in the CS Server Room (MH G-29), please note that if you do not have UPS units in your racks (and most of you do not), you can expect your systems will power cycle each time Facilities cycles power in Malone Hall. Please be aware. PhD students who maintain those systems (and perhaps other systems in the building), please keep that in mind as well.
| |
− | | |
− | ::The CS computing labs' systems (currently, for the summer, all located in G-61), those computers are not on UPS systems, so those computers will power cycle and should boot back up on their own. But, if you're planning to use our lab systems, because they might go up and down several times during the electrical work time period, you might not want to do your school work on those systems during that time.
| |
− | -->
| |
− | <!--
| |
− | ::JHU Facilities is preparing for BGE to test electrical equipment that affects several Homewood buildings. They will be performing this test on Saturday evening, June 26 at 8pm. If you recall, back on May 6, there was a very short power outage that affected our building and others. The testing BGE will be doing is part of their troubleshooting what happened in May.
| |
− | | |
− | ::In the case of the upcoming 6/26 testing, there is a potential for another short power outage (1 to 2 minutes) that evening.
| |
− | | |
− | ::A short outage of this type will affect our CS servers and IT services in the following way: Although our servers should physically stay running, as they are on battery-backed equipment, because our services require network connections that are controlled by JHU (and not on battery backup), all of our CS IT services will be unavailable during the expected brief outage.
| |
− | | |
− | ::Once the power returns, our services should be available again, because the network should be available again.
| |
− | | |
− | ::Also, if there is indeed an outage, the CS Grad and Undergrad Lab systems (that currently, you can only access remotely) will power off. However, when power is restored, those lab systems should automatically reboot.
| |
− | | |
− | ::Other notes: WiFi and other networking in the building would be unavailable during the outage. Most likely, lights would be unavailable. My group does not maintain J-Card systems, so we do not know how the J-Card readers will perform during a power outage.
| |
− | | |
− | ::''For your own equipment, whether it be in your office or the server room, please prepare as for any other planned power outage.''
| |
− | | |
− | ::If there are additional details that we hear of, we will update here.
| |
− | | |
− | <br>
| |
| --> | | --> |
| | | |
| == {{red|CS IT SERVICE OUTAGES (Unplanned & Planned)}} == | | == {{red|CS IT SERVICE OUTAGES (Unplanned & Planned)}} == |
| | | |
− | <!--
| |
− | === UNPLANNED ''JHU'' SERVICE OUTAGES ===
| |
− |
| |
− | ==== {{red|9/29/23 MAJOR JHU email outage and delays}} ====
| |
− |
| |
− | :JHU is experiencing email issues with it's @jhu.edu mail services due to a global outage at Cisco. This affects both incoming and outgoing email messages to external recipients. It also impacts systems that send email through JHU's email gateways. Expect major mail delays until this is fixed. (We suspect that those with @jhu.edu addresses can still send and receive to others with @jhu.edu addresses.)
| |
− |
| |
− | :'''''UPDATE:''''' JHU has implemented a work-around to the email problem, and email delivery has returned to normal.
| |
− | -->
| |
− | <!--TEMPLATE
| |
− | {{outage
| |
− | |services=
| |
− | |summary=
| |
− | |time=
| |
− | |details=
| |
− | }}
| |
− | -->
| |
− |
| |
− | <!-- <br>-->
| |
| | | |
| === UNPLANNED CS IT SERVICE OUTAGES === | | === UNPLANNED CS IT SERVICE OUTAGES === |
− |
| |
− |
| |
− | <!--TEMPLATE
| |
− | {{outage
| |
− | |time=Started Aug 15, 2022 around 7am
| |
− | |services=MH-122's MH122PRT printer
| |
− | |summary=The HP printer in MH-122, mh122prt, is down due to a fuser error. Service has been called.
| |
− | |details=In the meantime, please use the printer in MH-G61, mhG61prt.<br/>
| |
− | <br/>
| |
− | Other available printers can be found at: [[Available Printers]]
| |
− | }}
| |
− | -->
| |
| | | |
| :None at this time. | | :None at this time. |
− |
| |
− | <!--====<span style="color:#0000ff">PHISHING EMAIL AND OTHER ACCOUNT ISSUES!</span>====
| |
− |
| |
− | <div style="color:#0000ff">
| |
− | :5/5/20: We are currently receiving a large number of phishing emails directed at the CS Department. If you receive an email with links in it and have ''any'' doubts about the email, '''do not click the link'''. You '''do not''' need to send the emails to us at this time, as we are actively tracking the situation.
| |
− |
| |
− | ::Also...
| |
− |
| |
− | :Because of these phishing attacks, if you've followed the phishing links and provided your account credentials to others, and then find you are unable to login to your CS account get your CS email, then, please see our [https://support.cs.jhu.edu/wiki/How_To_Reset_Your_Password password reset procedures]. If your CS email account has been disabled, and you need you need to contact us, you will need an alternate non-CS email address to do so. Also, if you did follow a phishing link and enter your account credentials and then realize what happened, please email [mailto:support@cs.jhu.edu support@cs.jhu.edu] '''''right away''''', and let us know.
| |
− |
| |
− | </div>-->
| |
− | <!--:None at this time.-->
| |
| | | |
| === PLANNED CS IT SERVICE OUTAGES === | | === PLANNED CS IT SERVICE OUTAGES === |
− | ==== {{red|'''OUTAGE #1: MAJOR CS IT SERVICES OUTAGE'''}}====
| |
| | | |
− |
| |
− | '''WHAT:''' Most CS IT Grad Net services ''will be unavailable'' due to file server maintenance.
| |
− |
| |
− | '''WHEN:''' Thursday, August 15, 4am to 7am.
| |
− |
| |
− | '''DETAILS:''' We will be performing upgrade maintenance on our servers, including the department's main file server (named "rtfm") that services the Grad Net (affecting all Faculty, staff, instructors, and CS grad students), and will require downtime for several major CS IT services. The affected IT services will be unavailable on Thursday morning, August 15, from 4am to 7am. Please see below for the list of affected services.
| |
− |
| |
− | '''CS IT Services That ''Will Not Be Available'' During The System Maintenance:'''
| |
− |
| |
− | * CS Mail service, both incoming and outgoing, will be suspended for CS Grad/Research Net users. And some CS email services will not be available for CS Ugrad Net users. Incoming mail should be queued by the sender until our mail service is back up again. Outgoing CS mail will not be available to Grad Net users, but since CS Ugrads can send through the JHU mail server, CS Ugrads might still be able to send email during the services outage (just not one of our lab computers or compute servers.)
| |
− |
| |
− | * IMAP, POP, and webmail (for both Grad/Research and Ugrad accounts) will be unavailable.
| |
− |
| |
− | * No locally-stored CS webpages will be available. The main CS website (run by WSE) may or may not remain accessible. If you have a personal or lab CS page that we maintain locally in the dept, those will be unavailable. The CS IT Support Wiki and its Notices page will remain available.
| |
− |
| |
− | * Grad/Research Net Linux user accounts and home directories will be inaccessible during the service outage.
| |
− |
| |
− | * ssh service to our CS Grad/Research Net (masters1 through masters16, gradx, and gradz) will be unavailable.
| |
− |
| |
− | * Console (desktop) access at any of our Masters Lab Linux client systems will be unavailable.
| |
− |
| |
− | * SMB (SAMBA) File Shares (the CS Office Staff and some others use these) will be unavailable.
| |
− |
| |
− | * MySQL service via the mysql.cs.jhu.edu server will be unavailable.
| |
− |
| |
− | ===={{red|'''OUTAGE #2: CS Linux Lab Systems Downtime/Upgrade Schedule'''}}====
| |
− |
| |
− |
| |
− | '''WHEN:''' Tuesday, August 19 through Friday, August 23
| |
− |
| |
− | '''WHAT:''' Subsets of the CS Linux clients will be down for upgrades over the course of the week.
| |
− |
| |
− | '''DETAILS:''' In prepping for the new semester, we will be upgrading the CS Dept's [[Linux clients]] (our lab systems and others that are remotely-accessible-only) from Fedora 38 to Fedora 40. This will require having the clients offline during the upgrades. We'll do this in stages, so there will always be some clients available at all times.
| |
− |
| |
− | The upgrade schedule for these systems will be as follows:
| |
− | * On Monday, August 19, ugrad1 through ugrad12 (in MH 122) will be upgraded.
| |
− | * On Tuesday, August 20, ugrad13 through ugrad24 and masters1 through
| |
− | masters16 (in MH G61) will be upgraded.
| |
− | * On Wednesday, August 21, ugradz and gradz (remotely-accessible only) will be upgraded.
| |
− | * On Thursday, August 22, ugradx and gradx (remotely-accessible only)
| |
− | will be upgraded.
| |
− | * On Friday. August 23, any systems that had to be skipped during the
| |
− | previous days will be upgraded. Our Notices page will have information
| |
− | about any such systems.
| |
− |
| |
− |
| |
− |
| |
− | <!--
| |
− | {{outage
| |
− | |type=Planned outage
| |
− | |time=Wednesday, August 7, between 9:00 am and noon
| |
− | |services=main CS website, CS-hosted websites, ugrad passwords, ugrad accounts website
| |
− | |summary=Brief outages of the above-listed services.
| |
− | |details=We will be performing upgrades on the servers that host the services listed above. The upgrades will require one or two brief outages for each service during the given time window. Each outage should last for less than a minute.}}
| |
− | -->
| |
| <!--:None at this time.--> | | <!--:None at this time.--> |
− | <!--
| |
− |
| |
− | ====Major Malone Power Outage Planned (Affecting CS IT Services) - Saturday, March 30 from 6am to 2:30pm (CS IT Services Outage before and after Power Outage as well)====
| |
− |
| |
− | :'''WHAT:''' There will be '''''no''''' CS IT computing services available during an upcoming all-day major power outage for ALL of Malone Hall.
| |
− |
| |
− | :'''WHEN:''' Power Outage - Saturday, March 30, 2024, starting at '''6am''' and running until '''2:30pm''' (so, roughly, 8.5 hours.)
| |
− |
| |
− | :: Loss of CS IT services - Saturday, March 30, 2024, starting at '''5am''' (one hour before the power outage) and lasting until '''4:30pm''' (two hours after the power outage is completed.)
| |
− |
| |
− | :'''DESCRIPTION:''' JHU is planning an a all-day power outage for Malone Hall, and all of our computing services will be unavailable during that time.
| |
− |
| |
− | :The actual power outage is planned to start at 6am, Saturday morning, March 30,, and will continue for approximately an 8.5 hours. '''''However,''''' we need to safely bring down our computer servers and clients ''earlier'' than that (before the power goes out.) We plan to bring our systems down that morning around '''5am'''. And although the power to the building should restored around 2:30pm that same day, we will not have all our systems back up and running until approx. 4:30pm, so plan on about 2 hours after the power outage is deemed over until our servers and services are available again.
| |
− |
| |
− | :{{red|Please read all of the notes below regarding Malone Hall Residents, CS Server Room users, and a list of the CS IT services that will be unavailable during the outage.}}
| |
− |
| |
− | ::{{red|'''NOTES TO MALONE HALL RESIDENTS:'''}} During the time of the outage, we're assuming most building lights will be out and the J-Card system might be out too. That might make it more difficult to get into the building during the outage. But with the power out, we're not sure how much need there will be for anyone to be in the building during that time anyway. If you have an office refrigerator, expect that to be out too. If you are counting on your UPS (battery-backup) systems to continue powering your office equipment, keep in mind the expected length of the outage (8 hours) and plan for a longer period of time, just to be safe. And keep in mind that your office phones may be inoperable during the outage. So please plan in advance for this outage.
| |
− |
| |
− | ::{{red|'''NOTE TO CS SERVER ROOM (MH G-29) SERVER OWNERS:'''}} Our server room will be out of power, so our servers will be unavailable. If you host servers in the server room, your servers will be down as well. Plan ahead of time to shut down and to bring back up your servers. Your group is responsible for any systems you choose to shut down before the outage or boot back up after the outage.
| |
− |
| |
− | =====Tracking Our CS IT Services Status Updates During The Outage=====
| |
− |
| |
− | :Because we will not have power to our servers in Malone Hall, the CS IT Support Wiki, and especially this Notices page ( https://support.cs.jhu.edu/wiki/Notices ) will be unavailable during the outage. Instead, during the outage, we have arranged for status updates to be available at the following website (served at an off-site facility):
| |
− |
| |
− | ::[https://csstatus.jhu.edu https://csstatus.jhu.edu] We will update that page soon with this information.
| |
− |
| |
− | :(Bookmark that link ahead of time, in case you can't access your CS mail during the outage.)
| |
− |
| |
− | :As soon as we're able to do so after the outage, we'll also make this Notices page available again.
| |
− |
| |
− | =====CS IT Services ''Un''available During The Power Outage Include...=====
| |
− |
| |
− | * DNS resolution (hostname lookups) for all cs.jhu.edu hostnames will be unavailable. This will affect all websites with cs.jhu.edu domain names, even if the website is hosted by someone other than the CS department.
| |
− |
| |
− | * CS Mail service, both incoming and outgoing, will be suspended for CS Grad/Research Net users. And some CS email services will not be available for CS Ugrad Net users.
| |
− | ** Incoming mail ''should'' be queued by the sender until our mail service is back up again. Outgoing mail will not be available.
| |
− | ** Outgoing CS mail will not be available to Grad Net users, but since CS Ugrads can send through the JHU mail server, CS Ugrads might still be able to send email during the outage (just not from a Malone Hall–based computer.)
| |
− | ** IMAP, POP, and webmail (for both Grad/Research and Ugrad accounts) will be unavailable.
| |
− |
| |
− | * '''No''' CS webpages will be available. This includes the main CS website. And, as mentioned above... because we will not have power to our servers, the CS IT Support Wiki, and especially its Notices page will be unavailable during the outage. Please refer to https://csstatus.jhu.edu for status updates during the outage.
| |
− |
| |
− | * Grad/Research Net and Ugrad Net user accounts and home directories will be inaccessible during the power outage.
| |
− |
| |
− | * ssh service to our CS Grad/Research Net & Ugrad Net Linux boxes (masters1 through masters16, ugrad1 through ugrad24, gradx, gradz, ugradx, and ugradz) will be unavailable.
| |
− |
| |
− | * Console (desktop) access at any of our lab Linux client systems will be unavailable.
| |
− |
| |
− | * SMB (SAMBA) File Shares (the CS Office Staff and some others use these) will be unavailable.
| |
− |
| |
− | * MySQL service via the mysql.cs.jhu.edu server and through the dbase.cs.jhu.edu server will be unavailable.
| |
− |
| |
− | * Network switches in the building will be without power, so no network connections in Malone Hall.
| |
− |
| |
− | * Wifi access points in Malone Hall will be without power and will therefore not be available.
| |
− | <br>
| |
− | -->
| |
− | <!--
| |
− | {{outage
| |
− | |type=Planned outage
| |
− | |services=most CS IT services
| |
− | |time=Tuesday, December 27, 9:00 am to 12:00 pm
| |
− | |summary=Most CS IT services will be unavailable due to file server maintenance.
| |
− | |details=We will be performing maintenance on our several of servers. This will require downtime for several major CS IT services. The affected IT services will be unavailable on the morning of Tuesday, December 27, starting at 9:00 am. Most services should be restored before 10:00 am, but services depending on the ugrad file server will remain unavailable for longer. Please see below for the list of affected services.<br/>
| |
− | <br/>
| |
− | '''CS IT Services That Will Not Be Available During The System Maintenance:'''<br/>
| |
− |
| |
− | * CS mail service, both incoming and outgoing, will be suspended for CS Grad/Research Net users. Some CS email services will not be available for CS Ugrad Net users. Incoming mail should be queued by the sender until our mail service is back up again. Outgoing CS mail will not be available to Grad Net users. CS ugrads can send through the JHU mail server, which will remain available. We expect mail service to be restored by 10:00 am, but see below about mail retrieval for ugrad accounts.
| |
− |
| |
− | * IMAP, POP, and webmail (for both Grad/Research and Ugrad accounts) will be unavailable. We expect Grad Net email to be full operational by 10:00 am. Ugrad IMAP, POP, and webmail should be available by 12:00 pm.
| |
− |
| |
− | * No locally-stored CS webpages will be available. The main CS website (run by WSE) will remain available, but some individual pages may fail to load. Personal webpages (both grad and ugrad) will not load. Other websites hosted by us for department affiliates (e.g. lab websites) will be unavailable. The CS IT Support Wiki and its Notices page will remain available. We expect all service interruptions for the main webserver (www.cs.jhu.edu) and hosted websites to be completed before 10:00 am. Ugrad personal webpages should be available again by 12:00 pm.
| |
− |
| |
− | * Grad/Research Net and Ugrad Net user accounts and home directories will be inaccessible during the services outage. We expect Grad Net services to be restored by 10:00 am and Ugrad Net services by 12:00 pm.
| |
− |
| |
− | * ssh service to our CS Grad/Research Net & Ugrad Net Linux boxes (masters1 through masters16, ugrad1 through ugrad24, gradx, gradz, ugradx,and ugradz) will be unavailable. We expect Grad Net services to be restored by 10:00 am and Ugrad Net services by 12:00 pm.
| |
− |
| |
− | * Console (desktop) access at any of our lab Linux client systems will be unavailable. We expect Grad Net systems to be available again by 10:00 am and Ugrad Net systems by 12:00 pm.
| |
− |
| |
− | * SMB (Samba) file shares (the CS office staff and some others use these) will be unavailable. We expect them to be available again by 10:00 am.
| |
− |
| |
− | * MySQL service via the mysql.cs.jhu.edu server and the dbase.cs.jhu.edu server will be unavailable. We expect mysql.cs.jhu.edu to be available by 10:00am and dbase.cs.jhu.edu by 12:00 pm.
| |
− | }}
| |
− | -->
| |
− |
| |
− |
| |
− | <!--{{outage
| |
− | |type=Limited availability
| |
− | |time=June 10 through August 10, 2022
| |
− | |services=ugrad1 through ugrad12
| |
− | |summary=''ugrad1'' through ''ugrad12'' will only be available remotely through SSH. Please see the CS Computing Lab Availability section below for details.
| |
− | }}-->
| |
− | <!--
| |
− | *******************************************
| |
− | **** UGRAD CLIENT UPGRADES TEMPLATE *******
| |
− | *******************************************
| |
− | ====CS Linux Client Unavailability During Upgrades====
| |
− |
| |
− | :We are upgrading our [https://support.cs.jhu.edu/wiki/Category:Linux_Clients CS Linux Clients] to Fedora 35 (from Fedora 33) per the following schedule:
| |
− |
| |
− | :* On Monday, January 24 the systems in Malone G61's Masters/Ugrad Lab will be upgraded. This includes all masters lab systems (masters1 through 16) and the ugrad lab systems in that same area (ugrad13 through 24). Please use ugradx and gradx instead.
| |
− | :** As of 4:00 pm, all of the Malone G61 upgrades have been completed.
| |
− |
| |
− | :* On Tuesday, January 25, the systems in the Malone 122 Ugrad Lab will be upgraded. These are ugrad lab systems ugrad1 through 12. Please use one of the already-upgraded ugrad systems (ugrad13 through ugrad24) instead. You may also use the not-yet-upgraded ugradx if you want.
| |
− | :** As of 2:00 pm, all of the Malone 122 upgrades have been completed.
| |
− |
| |
− | :* On Wednesday, January 26, in addition to any of the above systems that we were unable to upgrade the prior two days, we will also upgrade the Linux clients ugradz and gradz. Please use any of the already-upgraded systems (ugrad1 through ugrad24 or masters1 through masters16) instead. You may also use the not-yet-upgraded ugradx and gradx if you want.
| |
− | :** As of 2:00 pm, both ugradz and gradz have been upgraded.
| |
− |
| |
− | :* On Wednesday, February 2, the Linux clients ugradx and gradx will be upgraded. Please use ugradz/gradz or the lab client systems (ugrad1-24/masters1-16) instead.
| |
− | :** As of 2:00 pm, both ugradx and gradx have been upgraded.
| |
− |
| |
− | :'''NOTE:''' On each day, the upgrades will start at roughly 9:00 am and are expected to be complete by 5:00 pm.
| |
− | END TEMPLATE - UGRAD CLIENT UPGRADES -->
| |
− | <!-- TEMPLATE FOR POWER OUTAGE
| |
− | ==== Major CS Grad/Research Net and Ugrad Net IT Services Outage====
| |
− |
| |
− |
| |
− | :'''WHAT:''' Most CS IT services will be ''un''available due to file server maintenance.
| |
− |
| |
− | :'''WHEN:''' ''Tuesday, December 28, 5:30am to 7:30am.''
| |
− |
| |
− | :'''DETAILS:''' We will be performing maintenance on our two file servers, rtfm and barley, that will require downtime for both those systems and several other major CS IT services as well. The affected IT services will be unavailable on Tuesday, December 28, from 5:30am to 7:30am. Please see below for the list of affected services.
| |
− |
| |
− | =====CS IT Services That Will ''Not'' Be Available During The System Maintenance=====
| |
− |
| |
− | * CS Mail service, both incoming and outgoing, will be suspended for CS Grad/Research Net users. Some CS email services will not be available for CS Ugrad Net users.
| |
− | ** Incoming mail ''should'' be queued by the sender until our mail service is back up again.
| |
− | ** Outgoing CS mail will not be available to Grad Net users, but since CS Ugrads can send through the JHU mail server, CS Ugrads might still be able to send email during the outage.
| |
− | ** IMAP, POP, and webmail (for both Grad/Research and Ugrad accounts) will be unavailable.
| |
− |
| |
− | * '''No''' locally-stored CS webpages will be available. The main CS website (run by WSE) will remain available, but, if you have a personal or lab page that we maintain locally in the dept, those will be unavailable. The CS IT Support Wiki and its Notices page will remain available.
| |
− |
| |
− | * Grad/Research Net and Ugrad Net user accounts and home directories will be inaccessible during the outage.
| |
− |
| |
− | * ssh service to our CS Grad/Research Net & Ugrad Net Linux boxes (masters1 through masters16, ugrad1 through ugrad24, gradx, gradz, ugradx, and ugradz) will be unavailable.
| |
− |
| |
− | * Console (desktop) access at any of our lab Linux client systems will be unavailable.
| |
− |
| |
− | * SMB (SAMBA) file shares (the CS Office Staff and some others use these) will be unavailable.
| |
− |
| |
− | * MySQL service via the mysql.cs.jhu.edu server and the dbase.cs.jhu.edu server will be unavailable.
| |
− |
| |
− | :We will update this Notices page if there are changes or any delay in the restore time of our IT services.
| |
− | -->
| |
− | <!--
| |
− | *******************************************
| |
− | ********* POWER OUTAGE TEMPLATE***********
| |
− | *******************************************
| |
− |
| |
− |
| |
− | -->
| |
− | <!--
| |
− | -->
| |
− | <!-- ************************* END OF OUTAGE INFO ************************* -->
| |
− | <!-- ------------------------------------------------------------- -->
| |
− | <!--
| |
− | *********************************
| |
− | ** VM Server Shutdown TEMPLATE **
| |
− | *********************************
| |
− |
| |
− | '''WHAT:''' The dept's Virtual Machine will be shutdown.
| |
− |
| |
− | '''WHEN:''' Wednesday, January 11 from 6am to 3pm (or earlier)
| |
− |
| |
− | We need to do some work on the VM server and will be taking it down during the above date and time.
| |
− |
| |
− | As part of the shutdown process, we will suspend most or all of the VMs; some
| |
− | VMs might have to be shutdown all the way instead. And when the VM server is back up and running again, we will restart or unsuspend all VMs. In all cases, VM owner intervention should not be needed; we can handle this remotely.
| |
− |
| |
− | After the VM server is up and running again, VM owners will receive an announcement (and updates will be posted here), and, we do ask that VM owners check to make sure their VMs are running as expected. Please email [mailto:support@cs.jhu.edu support@cs.jhu.edu] if there are issues.
| |
− |
| |
− | ** END VM Server Shutdown TEMPLATE** -->
| |
− | <!-- **Begin Specific Client shutdown TEMPLATE**
| |
− |
| |
− | '''WHAT:''' ugradz.cs.jhu.edu (one of our CS Dept Linux Ugrad Net compute servers) will go down for a memory upgrade.
| |
− |
| |
− | '''WHEN:''' Thursday, April 6, from 9am to 11am.
| |
− |
| |
− | '''DETAILS:''' ugradz will be taken offline so that its memory can be upgraded. While ugradz is down for its memory upgrade, you can still access our other Ugrad Net Fedora 25
| |
− | systems (ugrad1 through ugrad24 and ugradx.) Info about our Fedora systems can be found at: https://support.cs.jhu.edu/wiki/Category:Linux_Clients
| |
− |
| |
− | Please make sure you are logged off of ugradz before the upgrade time.
| |
− |
| |
− | Any updates will be posted here.
| |
− |
| |
− | **End Specific Client shutdown TEMPLATE** -->
| |
− |
| |
− | == {{red|CS COMPUTING LAB AVAILABILITY}} ==
| |
− | <!-- ***** NORMAL POSTING MH 122****** -->
| |
− |
| |
− | ;:'''MH 122''' (CS Undergrad Lab/Collaboration room) is available for in-person access.
| |
− | <!--:* As of August, 2022, masks are now '''''optional''''' in the lab-->
| |
− | <!-- for those that are vaccinated '''''and''''' boosted. Masks '''''continue''''' to be '''''required''''' for all others using this lab.-->
| |
− | <!--
| |
− | :'''MH 122 ''UNAVAILABILITY'''''
| |
− |
| |
− | ::'''WHAT:''' MH 122 (and its breakout rooms) will be '''''closed''''' for due to a Human Language Technology Center of Excellence (HLTCOE) workshop being held there.
| |
− | ::'''WHEN:''' Monday, Jan 8 through Friday, Jan 19, 2024.
| |
− |
| |
− | ::'''NOTES:'''
| |
− | :* The G-61 Masters/Ugrad Lab will remain open and available during this time period. The G-61 printer will remain available as well.
| |
− | :* The MH 122 Linux systems, ugrad1 through ugrad12, will continue to be available, '''''but only remotely via ssh'''''. Please see our page on: [[Linux_Clients_on_the_CS_Undergrad_Net]]
| |
− | -->
| |
− |
| |
− |
| |
− | <!--
| |
− | :'''MH 122 ''UNAVAILABILITY'''''
| |
− | ::'''WHAT:''' MH 122 (and its breakout rooms) will be '''''closed''''' for the summer due to a CLSP workshop being held there.
| |
− | ::'''WHEN:''' Wednesday, June 5 through Monday, August 5. On Tuesday, August 6, the room becomes available to CS again, with ugrad1 through ugrad12 and the lab's printer returning to the room on sometime during August 6 and August 7.
| |
− |
| |
− | ::'''NOTES:'''
| |
− |
| |
− | :* The MH 122 Linux systems, ugrad1 through ugrad12, will continue to be available, '''''but only remotely via ssh''''' ''until'' they are moved back into MH-122 sometime during the Tues Aug 6 and/or Wed, Augu 7. There will be some downtime for those systems on 8/6 and/or 8/7 as the systems are transferredback to MH 122. Please see our page on: [[Linux_Clients_on_the_CS_Undergrad_Net]] https://support.cs.jhu.edu/wiki/Linux_Clients_on_the_CS_Undergrad_Net for a list of our remotely-available Ugrad Linux systems.
| |
− |
| |
− | :* The printer in MH 122 will be ''unavailable'' during this time, but it too should be back in MH-122 on 8/6 or 8/7.
| |
− |
| |
− | :* The G61 Masters/Ugrad Lab will remain open and available during the summer, and its Linux systems will be available for in-person and remote work, as usual. The G61 printer will remain available as well.
| |
− | -->
| |
− |
| |
− | <!-- ****** NORMAL POSTING G61 ********** -->
| |
− | :'''MH G61''' (CS Masters/Ugrad Labs) is available for in-person access.
| |
− |
| |
− | <!--:* All CS Linux systems in this lab area (masters1 through masters16 and ugrad13 through ugrad24) are available for use in-person or remotely, via ssh.-->
| |
− |
| |
− | <!--
| |
− | ******************************************************
| |
− | **** ACM CONTEST TEMPLATE - All CS Labs Closed on Friday/Saturday, Feb 23-24, 2024*****
| |
− | ******************************************************
| |
− | -->
| |
− | <!--
| |
| === Malone '''MH 122''' ''and'' '''G61''' Ugrad and Masters Labs {{red|'''''Closure'''''}}=== | | === Malone '''MH 122''' ''and'' '''G61''' Ugrad and Masters Labs {{red|'''''Closure'''''}}=== |
| | | |
| :'''WHAT:''' Malone Hall MH 122 '''and''' Malone Hall G61, both the Masters and Ugrad sides of the lab, '''and ''all'' the lab Linux computers, will be closed to CS students due to an ACM Programming Contest. | | :'''WHAT:''' Malone Hall MH 122 '''and''' Malone Hall G61, both the Masters and Ugrad sides of the lab, '''and ''all'' the lab Linux computers, will be closed to CS students due to an ACM Programming Contest. |
| | | |
− | :'''WHEN:''' Starting Friday evening, Feb 23, 5pm '''through''' Saturday, February 24, 9pm. | + | :'''WHEN:''' Starting Friday evening, November 15, 5pm '''through''' Saturday, November 16, 9pm. |
| | | |
| :'''DETAILS:''' | | :'''DETAILS:''' |
Line 415: |
Line 48: |
| * The printers in MH 122 and MH G61 will remain online, but, please pick up your printouts outside of the contest hours. | | * The printers in MH 122 and MH G61 will remain online, but, please pick up your printouts outside of the contest hours. |
| | | |
− | -->
| + | <br> |
− | <!-- ********* TEMPLATE FOR G61 Masters Closure for ACM Local Contest **********--> | |
− | <!--
| |
− | : '''Malone G61 ''Masters Lab'' Closure'''
| |
| | | |
− | ::'''WHAT:''' Malone Hall G61, '''the ''Masters'' side only''', will be closed to CS Masters students due to a ''local'' ACM Programming Contest.
| + | == {{red|CS COMPUTING LAB AVAILABILITY}} == |
| | | |
− | ::'''WHEN:''' Saturday, February 4, from 1:30pm to 7pm.
| |
| | | |
− | ::'''DETAILS:'''
| |
| | | |
− | :::The G61 Masters side of the lab will be used for an ACM Programming Contest and will therefore be closed for non-contest use during the 1:30 to 7pm time period on Feb. 4. The Ugrad side will be unaffected, and Ugrad students may enter through the Master's side of the lab to get to the Undergrad side of the lab.
| + | <!-- ***** NORMAL POSTING MH 122****** --> |
− | | + | :'''MH 122''' (CS Undergrad Lab/Collaboration room) is available for in-person access. |
− | :::During the Masters lab closure times, the Masters computers in G61 will continue to be available remotely, via SSH. | + | :{{red|However, please see the info above regarding the mid-November lab closure and systems unavailability.}} |
− | | |
− | ::Please see our [https://support.cs.jhu.edu/wiki/Category:Labs Labs] page for further information about our labs.
| |
− | -->
| |
| <!-- | | <!-- |
− | ******************************************************
| + | :'''MH 122 ''UNAVAILABILITY''''' |
− | **** G61 Lab Closure Programming Contest TEMPLATE ****
| |
− | ******************************************************
| |
− | === Malone '''G61''' Masters Lab/Ugrad Lab '''Closure'''===
| |
− | | |
− | :'''WHAT:''' Malone Hall G61, both the Masters and Ugrad sides of the lab, will be closed to CS students due to the ACM Programming Contest.
| |
− | | |
− | :'''WHEN:''' Saturday, February 26, from 11am to 7pm.
| |
− | | |
− | :'''DETAILS:'''
| |
− | | |
− | :The G61 Masters and Ugrad Labs will be used for an ACM Programming Contest and will therefore be closed for non-contest use during the 11am to 7pm time period on Feb. 26.
| |
− | | |
− | * During the lab closure times, the Masters and Ugrad Linux computers in G61 will continue to be available remotely, via SSH.
| |
− | | |
− | * Ugrad Lab, MH 122 will ''not be affected'' and will remain ''open'' during this time
| |
− | | |
− | | |
− | === '''''UPDATE''''' - July 19, 2021 - The CS Computing Labs are once again available for '''''in-person access'''''...===
| |
− | | |
− | :'''MH 122''' (CS Undergrad Lab/Collaboration room): Is now '''''available for in-person access'''''. | |
− | ::All CS Linux systems in that room (ugrad1 through ugrad12) are available for use in-person or remotely, via ssh. {{red|Masks are required for entry.}}
| |
− | | |
− | :'''MH G61''' (CS Masters/Ugrad Labs): Is now '''''available for in-person access'''''.
| |
− | ::The Linux systems in this lab area (masters1 through masters16 and ugrad13 through ugrad24) are available for use in-person or remotely, via ssh. {{red|Masks are required for entry.}}
| |
− | | |
− | Please see our [https://support.cs.jhu.edu/wiki/Category:Labs Labs] page for further information.
| |
− | <!--'''NOTE:''' Remember, all of the CS Linux systems, including the ones in the labs, will be unavailable during the March 22 power outage. Please see above.-->
| |
− | <!-- *************** END ACTIVE NOTICES ********************-->
| |
− | <!-- :None at this time. -->
| |
− | <!--PROGRAMMING CONTEST TEMPLATE -->
| |
− | <!-- === MH 122 ''and'' MH G61 (both CS Ugrad labs & the Masters Lab) CLOSURE ON Sat., Nov. 9===
| |
− | | |
− | '''WHAT:''' The 1st floor CS Ugrad lab, MH 122, and both lab sides of the CS Masters/Ugrad Lab, MH G61, will be closed due to an ACM Programming Contest.
| |
− | | |
− | '''WHEN:''' Saturday, November 9, from 9am - 7pm.
| |
− |
| |
− | '''ADDITIONAL INFO:''' Although these labs will be closed for the ACM Programming Contest, you may still access our Ugrad Linux systems remotely, via ssh. Please see:
| |
− |
| |
− | :: [https://support.cs.jhu.edu/wiki/Linux_Clients_on_the_CS_Undergrad_Net https://support.cs.jhu.edu/wiki/Linux_Clients_on_the_CS_Undergrad_Net]
| |
− | | |
− | ::: or
| |
− | | |
− | :: [https://support.cs.jhu.edu/wiki/Linux_Clients_on_the_CS_Grad/Research_Net https://support.cs.jhu.edu/wiki/Linux_Clients_on_the_CS_Grad/Research_Net]
| |
− |
| |
− | :for a list of our remotely available Linux systems. -->
| |
− | <!--
| |
− | *
| |
− | *
| |
− | * ********************* BEGIN TEMPLATES ********************
| |
− | *
| |
− | *
| |
− | *
| |
| --> | | --> |
− | <!-- ************ LAB CLOSURE TEMPLATE - START ***************
| |
| | | |
− | ==== '''PLANNED CLOSURE''''' ====
| |
− |
| |
− |
| |
− | '''''WHERE:''''' Malone Hall G61, both the Masters and Ugrad sides of the lab.
| |
− |
| |
− | '''''WHEN:''''' Monday, March 14 & Tuesday, March 15, from 6am to 12 Noon.
| |
− |
| |
− | '''''WHY:''''' Network cable installation. The lab will be closed those two
| |
− | mornings as workers install additional network cable.
| |
− |
| |
− | =====NOTES:=====
| |
− |
| |
− | * During the lab closure times, the masters and ugrad Linux computers in G61 will continue to be available remotely, via SSH.
| |
− |
| |
− | * Ugrad Lab, MH 122 will not be affected and will remain open during those times.
| |
− |
| |
− | ************* LAB CLOSURE TEMPLATE- END *************-->
| |
− | <!-- ********** BARLEY SHUTDOWN TEMPLATE - START *************
| |
− |
| |
− |
| |
− | ===Planned Outage 1: CS Ugrad Net File Server Repair (barley.cs.jhu.edu)===
| |
− |
| |
− | UPDATE: 10/4/16 7:15am All systems back in operation!
| |
− |
| |
− |
| |
− | :'''WHAT:''' Major CS *Undergrad* Net IT services outage, as we make repairs to the CS Undergrad Net file server, '''barley.cs.jhu.edu'''
| |
− |
| |
− | :'''WHEN:''' Tuesday, October 4, from ''6am to approx 8am''.
| |
− |
| |
− | :'''DETAILS:''' Our CS Undergrad Net home directory file server, barley.cs.jhu.edu, will be shut down to swap out a motherboard, since its own motherboard is reporting errors.
| |
− |
| |
− | :Due to this shutdown for repair, several of our CS Ugrad Net services will be unavailable during this time. If there are any unexpected complications during the repair process that will delay the restoration of services, we will update the CS IT Support Wiki's Notices page at [https://support.cs.jhu.edu/wiki/Notices https://support.cs.jhu.edu/wiki/Notices]
| |
− |
| |
− | {{red|UPDATE: 10/4/16 7:15am All systems back in operation! }}
| |
− |
| |
− | ====Suspended (Unavailable) Ugrad Net services while ''barley.cs.jhu.edu'' is down====
| |
− |
| |
− | :::*'''CS Ugrad Mail service,''' both incoming and outgoing, will be suspended for CS Ugrad Net users (as this fileserver works in tandem with our CS Ugrad mail server.) Incoming mail should be queued until our mail service is back up again. Outgoing mail from CS Ugrad Net users will not be available.
| |
− |
| |
− | :::*'''IMAP, POP, and Webmail''' from our CS Ugrad Mail server will be unavailable.
| |
− |
| |
− | :::*'''Webpages''' served from our CS Ugrad webserver will be unavailable.
| |
− |
| |
− | :::*'''Ugrad Net user accounts/home directories''' will be inaccessible during the downtime.
| |
− |
| |
− | :::*'''ssh service to our CS Ugrad Net Linux boxes''' (ugrad1 through ugrad24,and ugradx) will be unavailable.
| |
− |
| |
− | :::*'''Console (desktop) access to ugrad1 through ugrad24''' will be unavailable. However, although the CS Ugrad computers will be unavailable during the repair time, the CS Ugrad Labs will remain open.
| |
− |
| |
− | :::*'''MySQL service via the dbase.cs.jhu.edu server''' (used by a databases class) will be unavailable.
| |
− |
| |
− | :Future updates will be posted on the [https://support.cs.jhu.edu/wiki/Notices Notices] page of the CS IT Support Wiki
| |
− |
| |
− | {{red|UPDATE: 10/4/16 7:15am All systems back in operation! }}
| |
− |
| |
− |
| |
− | <br>
| |
− |
| |
− | ===Planned Outage 2: Databases Class MySQL Database Server ('''dbase.cs.jhu.edu''') Unavailability===
| |
− |
| |
− | :'''WHAT:''' The Databases class's MySQL database server, dbase.cs.jhu.edu, will be unavailable when the CS Ugrad Net's fileserver, barley.cs.jhu.edu, is being repaired (see above.)
| |
− |
| |
− | :'''WHEN:''' Tuesday, October 4, from ''6am to approx 8am''.
| |
− |
| |
− | :'''DETAILS:''' dbase.cs.jhu.edu uses the CS Ugrad Net file server and will therefore be unavailable during the barley.cs.jhu.edu repair time.
| |
− |
| |
− | :Future updates will be posted on the [https://support.cs.jhu.edu/wiki/Notices Notices] page of the CS IT Support Wiki
| |
− |
| |
− | {{red|UPDATE: 10/4/16 7:15am All systems back in operation! }}
| |
− |
| |
− |
| |
− | <br>
| |
− |
| |
− | ********** BARLEY SHUTDOWN TEMPLATE - END ************* -->
| |
− | <!-- ******************* MINOR OUTAGE TEMPLATE BEGIN ***********************
| |
− |
| |
− | '''Wed, July 30, 9am through noon:''' ''Entire Undergrad Net'' (clients and servers) will be down as we complete system maintenance and move some equipment to a different rack.
| |
− |
| |
− | Additionally, the Ugrad Net web and mail service will be unavailable during that time. (Incoming ugrad net mail should queue up on another of our mail servers during that time, until the ugrad mail server is back up and running and transfers the mail.)
| |
− |
| |
− | ************** MINOR OUTAGE TEMPLATE END ********************* -->
| |
− | <!-- ************** MAJOR OUTAGE TEMPLATE BEGIN *********************
| |
− |
| |
− | '''MAJOR''' motherboard repair of ''rtfm.cs.jhu.edu'', one of our main CS ''Grad/Research'' Net file system servers, will create up to (but hopefully, much shorter than) 6-hour planned downtime for the Grad/Research Network. Our hardware service/repair company will be on-site completing repairs.
| |
− |
| |
− | '''Outage will begin at 12am (midnight), Thursday, 8/22, and will last until 6am (or earlier) Thursday.'''
| |
− |
| |
− | During that time, the following services will be ''unavailable'':
| |
− |
| |
− | * ''Email in or out on the Grad/Research Net will be disabled.'' (Connections to smtp.cs.jhu.edu and imap.cs.jhu.edu will fail during that time. However, incoming mail to CS should queue at an alternative server.)
| |
− |
| |
− | * ''Email on the Undergrad Net will be disabled during this time'' (as CS Ugrad e-mail addresses are registered via a server on the CS Grad Net.)
| |
− |
| |
− | * ''DNS will only be available if you've configured your computer with a secondary DNS server.'' If you don't have a secondary server in your computer's DNS defined, please add 128.220.2.7 You may notice a delay in DNS name resolution when falling back to the secondary server.
| |
− |
| |
− | * ''Grad/Research Net user accounts/home directories will be inaccessible'' during the downtime.
| |
− |
| |
− | * ''Access to any of our Grad/Research Net linux clients (including gradx and masters1 through masters16, as well as Dr. Smith's pllab machines that we maintain) will be unavailable''
| |
− |
| |
− | * ''peregrine.cs.jhu.edu (our Solaris login server) will be unavailable''
| |
− |
| |
− | * ''Our mysql server, mysql.cs.jhu.edu, will be unavailable.''
| |
− |
| |
− | * ''Samba shares will be unavailable.''
| |
− |
| |
− | * ''Your Grad/Research Net web pages will be unavailable.'' (The webserver is expected to be serving minimal pages, mostly notices, during that time.)
| |
− |
| |
− | ******************** MAJOR OUTAGE TEMPLATE END ************************* -->
| |
− | <!-- ********* JHU-WIDE OUTAGES TEMPLATE - START *******************
| |
− |
| |
− | ==JHU-WIDE IT SERVICE OUTAGES==
| |
| | | |
| + | <!-- ****** NORMAL POSTING G61 ********** --> |
| + | :'''MH G61''' (CS Masters/Ugrad Labs) is available for in-person access. |
| + | :{{red|However, please see the info above regarding the mid-November lab closure and systems unavailability.}} |
| <br> | | <br> |
− |
| |
− | '''8/24/16 3:30pm''' UPDATE: We are told that JHU has fixed their mail servers and that JHU mail is back in operation again.
| |
− |
| |
− |
| |
− | '''8/24/16 1:30pm''' JHU's central mail servers are experiencing an issue that is causing mail bouncebacks for people not on JHU Exchange sending to people on JHU Exchange. An error might look like:
| |
− |
| |
− | :'''The reason for the problem: 5.1.2 - Bad destination host 'Multiple DNS'''
| |
− | :'''queries were attempted and failed: DNS Hard Error looking up'''
| |
− | :'''feint.johnshopkins.edu<http://feint.johnshopkins.edu/> (A): NXDomain'''
| |
− |
| |
− | JHU is looking into the problem at their end. Note that although the CS email servers are working fine, those on CS sending to JHU Exchange users may experience the same issue as others outside of JHU Exchange sending to JHU Exchange.
| |
− |
| |
− | <br>
| |
− | *********** JHU-WIDE OUTAGES TEMPLATE - END*********** -->
| |
− | <!-- **************** MAIL BOUNCES TEMPLATE - START ****************
| |
− |
| |
− |
| |
− |
| |
− | ===Possible Email Bounces From Normally-Working Sites===
| |
− |
| |
− | '''8/8/16''' We have been receiving reports of ''email bounces from people/organizations that normally work without problems.'' We think we know what is happening. We recently discovered that one of our CS student accounts had been compromised and was being used to send spam. Even though we disabled the account as soon as the compromise was discovered, several mail server reputation services had already classified us as a possible source of spam. As a result of that classification, some organizations have decided to temporarily reject email from our mail server. We can't predict ahead of time which organizations those are, since there are a variety of reputation services, and individual organizations differ in the ways they make use of reputation information.
| |
− |
| |
− | This problem will fix itself automatically over the next few days, as the reputation services take note of the fact that we have stopped sending spam. There's no way to speed up this process, unfortunately.
| |
− |
| |
− | This sort of problem doesn't often happen to us. But when it does, it causes headaches like the unexpected bounce messages some people have received. We will be implementing some new processes that we expect will allow us to react more quickly to situations like this, before they reach the point where other organizations stop accepting our mail.
| |
− |
| |
− | We will update this page once the reputation scores have returned to normal.
| |
− | <br>
| |
− |
| |
− |
| |
− | **************** MAIL BOUNCES TEMPLATE - END -->
| |
| | | |
| == {{red|AUDIO/VISUAL (A/V) OUTAGES}} == | | == {{red|AUDIO/VISUAL (A/V) OUTAGES}} == |