Difference between revisions of "Notices"

Line 9: Line 9:
 
:'''ORIGINAL ISSUE...'''
 
:'''ORIGINAL ISSUE...'''
  
:'''WHAT:''' Intermittent or total ''hopkins'' Wifi Outage
+
::'''WHAT:''' Intermittent or total ''hopkins'' Wifi Outage
  
:'''WHEN:''' Started the morning of Thursday, Aug 9.
+
::'''WHEN:''' Started the morning of Thursday, Aug 9.
  
 
:Users are experiencing issues with ''hopkins'' wifi across some campuses, including Homewood.  We do not have any further information, except hearing that this is an enterprise-wide issue and JHU Networking is aware of it.
 
:Users are experiencing issues with ''hopkins'' wifi across some campuses, including Homewood.  We do not have any further information, except hearing that this is an enterprise-wide issue and JHU Networking is aware of it.

Revision as of 17:58, 9 August 2018


SERVICE OUTAGES


UNPLANNED JHU SERVICE OUTAGES

UPDATE: As of 12:30pm on 8/9, we've been told this issue is now resolved.
ORIGINAL ISSUE...
WHAT: Intermittent or total hopkins Wifi Outage
WHEN: Started the morning of Thursday, Aug 9.
Users are experiencing issues with hopkins wifi across some campuses, including Homewood. We do not have any further information, except hearing that this is an enterprise-wide issue and JHU Networking is aware of it.


UNPLANNED CS SERVICE OUTAGES

None at this time.


PLANNED CS SERVICE OUTAGES

None at this time.



CS COMPUTING LAB AVAILABILITY

MH 122 (Ugrad Lab/Collaboration Room) Will Be Closed For The Summer

WHEN: Fri., May 25 through Thu., Aug 9

DETAILS: Maintenance work and a CSLP Summer Workshop will be happening in this room during this time. In addition to the main MH-122 room, its three breakout rooms and the MH-122 printer will all be unavailable as well.

MH-122 will reopen on Friday, Aug 10.

NOTES:

• The G-61 Masters/Ugrad Lab will remain open and available during the summer. The G-61 printer will remain available as well.
• The MH-122 Linux systems, ugrad1 through ugrad12, will continue to be available, but only remotely via ssh. (There will be some downtime for those systems on 5/25 and 8/9 as the systems are transferred from, and then, back to MH-122.) Please see: https://support.cs.jhu.edu/wiki/Linux_Clients_on_the_CS_Undergrad_Net for a list of our remotely-available Ugrad Linux systems.


Projector in the main MH 122 Ugrad lab is down.

11/2/17 - Kit-cats (JHU's A/V group) has been called. They have been out and are evaluating their options for repair. ETA for repair is unknown at this time.


MH G-61 (Masters/Ugrad Lab) Availability Changes

WHEN: July 1, 2018 through August 24, 2018.
WHAT: Lab availability changes for Summer, 2018.
DETAILS: From July 1, 2018 through August 24, 2018, the Masters Lab side of this room (G-61) will be closed to CS students, as its desks are being assigned to specific visiting students. However, the Ugrad Lab (inner room) section of G-61 will be available to both Ugrad and Masters students during that time. So, you can come through this room's main entrance and head directly to the CS Ugrad lab side. The Ugrad Lab has the Ugrad Net's Linux clients (ugrad13 through ugrad 24.)
CS Masters students needing access to the Grad Net Linux systems can log into the Ugrad desktops first, and then ssh into the desired Grad Net Linux systems.
During this period of time, the G-61 printer has been temporarily relocated from the Masters side to the back of the Ugrad side.
(Please do not touch the computers stacked at the back wall of G-61's Ugrad Lab. Please leave them powered on.)