Difference between revisions of "Notices"

Line 246: Line 246:
 
== <span style="color:#ff0000">CS COMPUTING LAB AVAILABILITY </span> ==
 
== <span style="color:#ff0000">CS COMPUTING LAB AVAILABILITY </span> ==
  
=== MH 122 (Ugrad Lab/Collaboration Room) Will Be Closed For The Summer ===
+
=== MH 122 (Ugrad Lab/Collaboration Room) Is Open Again ===
  
'''WHEN:'''  Fri., May 25 ''through'' Thu., Aug 9
+
:We have reopened MH-122 to CS students (If you recall,it had been by another group through much of summer.)
  
'''DETAILS:'''  Maintenance work and a CSLP Summer Workshop will be happening in this room during this time.  In addition to the main MH-122 room, its three breakout rooms and the MH-122 printer will all be unavailable as well.
 
  
MH-122 will reopen on Friday, Aug 10.
 
  
'''NOTES:'''
+
===Projector in the main MH 122 Ugrad lab is down.===
  
:• The G-61 Masters/Ugrad Lab will remain open and available during the summer.  The G-61 printer will remain available as well.
+
:'''(Update: 8/10/18)''' - Kit-cats has been actively working on the repairShould be completed by the time the school year commences.
 
 
:• The MH-122 Linux systems, ugrad1 through ugrad12, will continue to be available, but only remotely via ssh(There will be some downtime for those systems on 5/25 and 8/9 as the systems are transferred from, and then, back to MH-122.)  Please see: [https://support.cs.jhu.edu/wiki/Linux_Clients_on_the_CS_Undergrad_Net https://support.cs.jhu.edu/wiki/Linux_Clients_on_the_CS_Undergrad_Net] for a list of our remotely-available Ugrad Linux systems.
 
 
 
 
 
===Projector in the main MH 122 Ugrad lab is down.===
 
  
: 11/2/17 - Kit-cats (JHU's A/V group) has been called.  They have been out and are evaluating their options for repair.  ETA for repair is unknown at this time.
+
: '''11/2/17''' - Kit-cats (JHU's A/V group) has been called.  They have been out and are evaluating their options for repair.  ETA for repair is unknown at this time.
  
  

Revision as of 15:30, 10 August 2018


SERVICE OUTAGES


UNPLANNED CS SERVICE OUTAGES

None at this time.


PLANNED CS SERVICE OUTAGES

None at this time.



CS COMPUTING LAB AVAILABILITY

MH 122 (Ugrad Lab/Collaboration Room) Is Open Again

We have reopened MH-122 to CS students (If you recall,it had been by another group through much of summer.)


Projector in the main MH 122 Ugrad lab is down.

(Update: 8/10/18) - Kit-cats has been actively working on the repair. Should be completed by the time the school year commences.
11/2/17 - Kit-cats (JHU's A/V group) has been called. They have been out and are evaluating their options for repair. ETA for repair is unknown at this time.


MH G-61 (Masters/Ugrad Lab) Availability Changes

WHEN: July 1, 2018 through August 24, 2018.
WHAT: Lab availability changes for Summer, 2018.
DETAILS: From July 1, 2018 through August 24, 2018, the Masters Lab side of this room (G-61) will be closed to CS students, as its desks are being assigned to specific visiting students. However, the Ugrad Lab (inner room) section of G-61 will be available to both Ugrad and Masters students during that time. So, you can come through this room's main entrance and head directly to the CS Ugrad lab side. The Ugrad Lab has the Ugrad Net's Linux clients (ugrad13 through ugrad 24.)
CS Masters students needing access to the Grad Net Linux systems can log into the Ugrad desktops first, and then ssh into the desired Grad Net Linux systems.
During this period of time, the G-61 printer has been temporarily relocated from the Masters side to the back of the Ugrad side.
(Please do not touch the computers stacked at the back wall of G-61's Ugrad Lab. Please leave them powered on.)