Difference between revisions of "Notices"

Line 39: Line 39:
 
:'''WHAT:''' There will be '''''no''''' CS IT computing services available during an upcoming major power outage for ALL of Malone Hall.
 
:'''WHAT:''' There will be '''''no''''' CS IT computing services available during an upcoming major power outage for ALL of Malone Hall.
  
:'''WHEN:'''    Sunday, March 22, ''all day'', from '''(NEW TIME)''' 6am until sometime after 8pm.
+
:'''WHEN:'''    Sunday, March 22, ''all day'', from 6am until sometime after 8pm.
  
 
:'''DESCRIPTION:'''  JHU is planning an all-day power outage for Malone Hall.  As such, all of our computing services will be unavailable during that time.
 
:'''DESCRIPTION:'''  JHU is planning an all-day power outage for Malone Hall.  As such, all of our computing services will be unavailable during that time.
  
:The actual power outage is planned to start at '''(NEW TIME)''' 7am and end at 8pm Sunday, March 22.  However, we need to safely bring down our computer servers and clients earlier than that (before the power goes out.)  We plan to bring our systems down around '''(NEW TIME)''' 6am that morning.  We will then bring the systems back up after 8pm (when the power outage is declared over.)   
+
:The actual power outage is planned to start at 7am and end at 8pm Sunday, March 22.  However, we need to safely bring down our computer servers and clients earlier than that (before the power goes out.)  We plan to bring our systems down around 6am that morning.  We will then bring the systems back up after 8pm (when the power outage is declared over.)   
  
 
:<span style="color:#ff0000">Please read all of the notes below regarding Malone Hall Residents, CS Server Room users, and a list of the CS IT services that will be unavailable during the outage. </span>
 
:<span style="color:#ff0000">Please read all of the notes below regarding Malone Hall Residents, CS Server Room users, and a list of the CS IT services that will be unavailable during the outage. </span>
  
:''NOTES TO MALONE HALL RESIDENTS:''  During the time of the outage, we're assuming most building lights will be out, and the J-Card system might be out too, and that might make it more difficult to get into the building during the outage.  But, with the power out, we're not sure how much need there will be to be in the building during that time anyway.  If you have an office refrigerator, expect that to be out too.  And, if you are counting on UPS (battery-backup) systems you have to power up your office equipment, please realize that this is an expected 12-hour outage.  And, keep in mind that your office phones may be inoperable during the outage.  So, please plan in advance for this outage.
+
:''NOTES TO MALONE HALL RESIDENTS:''  During the time of the outage, we're assuming most building lights will be out, and the J-Card system might be out too, and that might make it more difficult to get into the building during the outage.  But, with the power out, we're not sure how much need there will be to be in the building during that time anyway.  If you have an office refrigerator, expect that to be out too.  And, if you are counting on UPS (battery-backup) systems you have to power up your office equipment, please realize that this is an expected 13-hour outage.  And, keep in mind that your office phones may be inoperable during the outage.  So, please plan in advance for this outage.
  
 
:''NOTE TO CS SERVER ROOM (MH G-29) SERVER OWNERS:''  Our server room will be out of power, so our servers will be unavailable.  If you host servers in the server room, your servers will be down as well.  Plan ahead of time to shut down and to bring back up your servers.
 
:''NOTE TO CS SERVER ROOM (MH G-29) SERVER OWNERS:''  Our server room will be out of power, so our servers will be unavailable.  If you host servers in the server room, your servers will be down as well.  Plan ahead of time to shut down and to bring back up your servers.

Revision as of 12:30, 20 March 2020


CS IT STAFF AVAILABILITY (New!)


NOTE: Beginning March 18, 2020, and until further notice, the CS IT Support Staff will not be available in-person. We will continue being available M-F, 8:30 to 5pm, but online only. Therefore, please remember to email support@cs.jhu.edu for assistance. Also, please have Zoom available on your device(s), so that we can arrange to contact you using that method, as an alternative to in-person communication. We are also looking into providing a virtual version of Steve DeBlasio's daily office hours for accounts, etc.


SERVICE OUTAGES

UNPLANNED CS SERVICE OUTAGES

None at this time.


PLANNED CS SERVICE OUTAGES

PLEASE READ ALL OF THE INFO BELOW...
WHAT: There will be no CS IT computing services available during an upcoming major power outage for ALL of Malone Hall.
WHEN: Sunday, March 22, all day, from 6am until sometime after 8pm.
DESCRIPTION: JHU is planning an all-day power outage for Malone Hall. As such, all of our computing services will be unavailable during that time.
The actual power outage is planned to start at 7am and end at 8pm Sunday, March 22. However, we need to safely bring down our computer servers and clients earlier than that (before the power goes out.) We plan to bring our systems down around 6am that morning. We will then bring the systems back up after 8pm (when the power outage is declared over.)
Please read all of the notes below regarding Malone Hall Residents, CS Server Room users, and a list of the CS IT services that will be unavailable during the outage.
NOTES TO MALONE HALL RESIDENTS: During the time of the outage, we're assuming most building lights will be out, and the J-Card system might be out too, and that might make it more difficult to get into the building during the outage. But, with the power out, we're not sure how much need there will be to be in the building during that time anyway. If you have an office refrigerator, expect that to be out too. And, if you are counting on UPS (battery-backup) systems you have to power up your office equipment, please realize that this is an expected 13-hour outage. And, keep in mind that your office phones may be inoperable during the outage. So, please plan in advance for this outage.
NOTE TO CS SERVER ROOM (MH G-29) SERVER OWNERS: Our server room will be out of power, so our servers will be unavailable. If you host servers in the server room, your servers will be down as well. Plan ahead of time to shut down and to bring back up your servers.
CS IT services unavailable during the power outage include:
  • CS DNS-based lookups (hostname lookups) will be unavailable.
  • CS Mail service, both incoming and outgoing, will be suspended for CS Grad/Research Net users.
  • Incoming mail should be queued by the sender until our mail service is back up again. Outgoing mail will not be available.
  • IMAP, POP, and Webmail from our CS (Grad/Research Net) Mail server will be unavailable. And, although, CS Ugrads can send email through the JHU webserver, their @cs.jhu.edu incoming mail arrives at CS, so CS Ugrads might not be able to see their email.)
  • No CS webpages will be available.
    • NOTE: This also means, no CS IT Support Wiki and no Notices page (this page!) We are looking into a temporary Notices page for that day, but at this time, no guarantees.
  • Grad/Research Net and Ugrad Net user accounts and home directories will be inaccessible during the power outage.
  • SMB File Shares (the CS Office Staff uses these) will be unavailable.
  • ssh service to our CS Grad/Research Net & Ugrad Net Linux boxes (masters1 through masters16, ugrad1 through ugrad24, gradx, gradz, ugradx, and ugradz) will be unavailable.
  • Console (desktop) access at any of our lab Linux clients systems will be unavailable.
  • MySQL service via the mysql.cs.jhu.edu server and through the dbase.cs.jhu.edu server will be unavailable.
  • Network switches in the building will be without power, so no network connections in Malone Hall.
  • Wifi access points in Malone Hall will be without power, so no wifi.
We'll post updates here as we get them, but probably not during the outage See the note about the Notices page, above.


CS COMPUTING LAB AVAILABILITY


MH-122 (CS Undergrad Lab/Collaboration room): As of 3/13/20, closed until further notice.

All CS Linux systems in that room (ugrad1 through ugrad12) will continue to be available remotely, via ssh.

G-61 (CS Masters/Ugrad Labs): As of 3/17/20, closed until further notice.

For the UGrad side, although that section is closed, the Linux systems in that room (ugrad13 through ugrad24) will continue to be available remotely, via ssh. The same with the Masters side of the lab (masters1 through masters16)


NOTE: Remember, all of the CS Linux systems, including the ones in the labs, will be unavailable during the March 22 power outage. Please see above.



AUDIO/VISUAL (A/V) OUTAGES

None at this time.