Difference between revisions of "Notices"

Line 29: Line 29:
  
 
=== PLANNED CS IT SERVICE OUTAGES ===
 
=== PLANNED CS IT SERVICE OUTAGES ===
<!-- TEMPLATE - MAJOR OUTAGE RTFM
 
==== {{red|'''OUTAGE #1:  MAJOR CS IT SERVICES OUTAGE'''}}====
 
  
 
'''WHAT:''' Most CS IT Grad Net services ''will be unavailable'' due to file server maintenance.
 
 
'''WHEN:''' Thursday, August 15, 4am to 7am.
 
 
'''{{red|UPDATE}}''': As of 5:30 am, all services have been restored.  If you encounter any problems, please email us at {{mailto|support}} and let us know.
 
 
'''DETAILS:''' We will be performing upgrade maintenance on our servers, including the department's main file server (named "rtfm") that services the Grad Net (affecting all Faculty, staff, instructors, and CS grad students), and will require downtime for several major CS IT services. The affected IT services will be unavailable on Thursday morning, August 15, from 4am to 7am.  Please see below for the list of affected services.
 
 
'''CS IT Services That ''Will Not Be Available'' During The System Maintenance:'''
 
 
* CS Mail service, both incoming and outgoing, will be suspended for CS Grad/Research Net users. And some CS email services will not be available for CS Ugrad Net users.  Incoming mail should be queued by the sender until our mail service is back up again.  Outgoing CS mail will not be available to Grad Net users, but since CS Ugrads can send through the JHU mail server, CS Ugrads might still be able to send email during the services outage (just not one of our lab computers or compute servers.)
 
 
* IMAP, POP, and webmail (for both Grad/Research and Ugrad accounts) will be unavailable.
 
 
* No locally-stored CS webpages will be available. The main CS website (run by WSE) may or may not remain accessible.  If you have a personal or lab CS page that we maintain locally in the dept, those will be unavailable. The CS IT Support Wiki and its Notices page will remain available.
 
 
* The CS staff documentation website will be unavailable.
 
 
* All CS Linux user accounts and home directories will be inaccessible during the service outage.
 
 
* ssh service to our Linux clients (masters1 through masters16, ugrad1 through ugrad24, gradx, ugradx, gradz, and ugradz) will be unavailable.
 
 
* Console (desktop) access at any of our Masters Lab Linux client systems will be unavailable.
 
 
* SMB (SAMBA) File Shares (the CS Office Staff and some others use these) will be unavailable.
 
 
* MySQL service via the mysql.cs.jhu.edu server will be unavailable.
 
-->
 
 
===={{red|'''OUTAGE:  CS Linux Lab Systems Downtime/Upgrade Schedule'''}}====
 
===={{red|'''OUTAGE:  CS Linux Lab Systems Downtime/Upgrade Schedule'''}}====
  
Line 77: Line 46:
 
*      On Friday. August 23, any systems that had to be skipped during the previous days will be upgraded. Our Notices page will have information about any such systems.
 
*      On Friday. August 23, any systems that had to be skipped during the previous days will be upgraded. Our Notices page will have information about any such systems.
  
<!--
+
 
{{outage
 
  |type=Planned outage
 
  |time=Wednesday, August 7, between 9:00 am and noon
 
  |services=main CS website, CS-hosted websites, ugrad passwords, ugrad accounts website
 
  |summary=Brief outages of the above-listed services.
 
  |details=We will be performing upgrades on the servers that host the services listed above.  The upgrades will require one or two brief outages for each service during the given time window.  Each outage should last for less than a minute.}}
 
-->
 
 
<!--:None at this time.-->
 
<!--:None at this time.-->
<!--
 
 
====Major Malone Power Outage Planned (Affecting CS IT Services) - Saturday, March 30 from 6am to 2:30pm (CS IT Services Outage before and after Power Outage as well)====
 
 
:'''WHAT:''' There will be '''''no''''' CS IT computing services available during an upcoming all-day major power outage for ALL of Malone Hall.
 
 
:'''WHEN:'''  Power Outage - Saturday, March 30, 2024, starting at '''6am''' and running until '''2:30pm''' (so, roughly, 8.5 hours.)
 
 
:: Loss of CS IT services - Saturday, March 30, 2024, starting at '''5am''' (one hour before the power outage) and lasting until '''4:30pm''' (two hours after the power outage is completed.)
 
 
:'''DESCRIPTION:'''  JHU is planning an a all-day power outage for Malone Hall, and all of our computing services will be unavailable during that time.
 
 
:The actual power outage is planned to start at 6am, Saturday morning, March 30,, and will continue  for approximately an 8.5 hours.  '''''However,''''' we need to safely bring down our computer servers and clients ''earlier'' than that (before the power goes out.)  We plan to bring our systems down that morning around '''5am'''.  And although the power to the building should restored around 2:30pm that same day, we will not have all our systems back up and running until approx. 4:30pm, so plan on about 2 hours after the power outage is deemed over until our servers and services are available again.
 
 
:{{red|Please read all of the notes below regarding Malone Hall Residents, CS Server Room users, and a list of the CS IT services that will be unavailable during the outage.}}
 
 
::{{red|'''NOTES TO MALONE HALL RESIDENTS:'''}}  During the time of the outage, we're assuming most building lights will be out and the J-Card system might be out too.  That might make it more difficult to get into the building during the outage.  But with the power out, we're not sure how much need there will be for anyone to be in the building during that time anyway.  If you have an office refrigerator, expect that to be out too.  If you are counting on your UPS (battery-backup) systems to continue powering your office equipment, keep in mind the expected length of the outage (8 hours) and plan for a longer period of time, just to be safe.  And keep in mind that your office phones may be inoperable during the outage.  So please plan in advance for this outage.
 
 
::{{red|'''NOTE TO CS SERVER ROOM (MH G-29) SERVER OWNERS:'''}}  Our server room will be out of power, so our servers will be unavailable.  If you host servers in the server room, your servers will be down as well.  Plan ahead of time to shut down and to bring back up your servers.  Your group is responsible for any systems you choose to shut down before the outage or boot back up after the outage.
 
 
=====Tracking Our CS IT Services Status Updates During The Outage=====
 
 
:Because we will not have power to our servers in Malone Hall, the CS IT Support Wiki, and especially this Notices page ( https://support.cs.jhu.edu/wiki/Notices ) will be unavailable during the outage.  Instead, during the outage, we have arranged for status updates to be available at the following website (served at an off-site facility):
 
 
::[https://csstatus.jhu.edu https://csstatus.jhu.edu]  We will update that page soon with this information.
 
 
:(Bookmark that link ahead of time, in case you can't access your CS mail during the outage.)
 
 
:As soon as we're able to do so after the outage, we'll also make this Notices page available again.
 
 
=====CS IT Services ''Un''available During The Power Outage Include...=====
 
 
* DNS resolution (hostname lookups) for all cs.jhu.edu hostnames will be unavailable.  This will affect all websites with cs.jhu.edu domain names, even if the website is hosted by someone other than the CS department.
 
 
* CS Mail service, both incoming and outgoing, will be suspended for CS Grad/Research Net users.  And some CS email services will not be available for CS Ugrad Net users.
 
** Incoming mail ''should'' be queued by the sender until our mail service is back up again. Outgoing mail will not be available.
 
** Outgoing CS mail will not be available to Grad Net users, but since CS Ugrads can send through the JHU mail server, CS Ugrads might still be able to send email during the outage (just not from a Malone Hall–based computer.)
 
** IMAP, POP, and webmail (for both Grad/Research and Ugrad accounts) will be unavailable.
 
 
* '''No''' CS webpages will be available.  This includes the main CS website.  And, as mentioned above... because we will not have power to our servers, the CS IT Support Wiki, and especially its Notices page will be unavailable during the outage.  Please refer to https://csstatus.jhu.edu for status updates during the outage.
 
 
* Grad/Research Net and Ugrad Net user accounts and home directories will be inaccessible during the power outage.
 
 
* ssh service to our CS Grad/Research Net & Ugrad Net Linux boxes (masters1 through masters16, ugrad1 through ugrad24, gradx, gradz, ugradx, and ugradz) will be unavailable.
 
 
* Console (desktop) access at any of our lab Linux client systems will be unavailable.
 
 
* SMB (SAMBA) File Shares (the CS Office Staff and some others use these) will be unavailable.
 
 
* MySQL service via the mysql.cs.jhu.edu server and through the dbase.cs.jhu.edu server will be unavailable.
 
 
* Network switches in the building will be without power, so no network connections in Malone Hall.
 
 
* Wifi access points in Malone Hall will be without power and will therefore not be available.
 
<br>
 
-->
 
<!--
 
{{outage
 
  |type=Planned outage
 
  |services=most CS IT services
 
  |time=Tuesday, December 27, 9:00 am to 12:00 pm
 
  |summary=Most CS IT services will be unavailable due to file server maintenance.
 
  |details=We will be performing maintenance on our several of servers. This will require downtime for several major CS IT services.  The affected IT services will be unavailable on the morning of Tuesday, December 27, starting at 9:00 am.  Most services should be restored before 10:00 am, but services depending on the ugrad file server will remain unavailable for longer.  Please see below for the list of affected services.<br/>
 
<br/>
 
'''CS IT Services That Will Not Be Available During The System Maintenance:'''<br/>
 
 
* CS mail service, both incoming and outgoing, will be suspended for CS Grad/Research Net users.  Some CS email services will not be available for CS Ugrad Net users.  Incoming mail should be queued by the sender until our mail service is back up again.  Outgoing CS mail will not be available to Grad Net users.  CS ugrads can send through the JHU mail server, which will remain available.  We expect mail service to be restored by 10:00 am, but see below about mail retrieval for ugrad accounts.
 
 
* IMAP, POP, and webmail (for both Grad/Research and Ugrad accounts) will be unavailable.  We expect Grad Net email to be full operational by 10:00 am.  Ugrad IMAP, POP, and webmail should be available by 12:00 pm.
 
 
* No locally-stored CS webpages will be available. The main CS website (run by WSE) will remain available, but some individual pages may fail to load.  Personal webpages (both grad and ugrad) will not load.  Other websites hosted by us for department affiliates (e.g. lab websites) will be unavailable.  The CS IT Support Wiki and its Notices page will remain available.  We expect all service interruptions for the main webserver (www.cs.jhu.edu) and hosted websites to be completed before 10:00 am. Ugrad personal webpages should be available again by 12:00 pm.
 
 
* Grad/Research Net and Ugrad Net user accounts and home directories will be inaccessible during the services outage.  We expect Grad Net services to be restored by 10:00 am and Ugrad Net services by 12:00 pm.
 
 
* ssh service to our CS Grad/Research Net & Ugrad Net Linux boxes (masters1 through masters16, ugrad1 through ugrad24, gradx, gradz, ugradx,and ugradz) will be unavailable.  We expect Grad Net services to be restored by 10:00 am and Ugrad Net services by 12:00 pm.
 
 
* Console (desktop) access at any of our lab Linux client systems will be unavailable.  We expect Grad Net systems to be available again by 10:00 am and Ugrad Net systems by 12:00 pm.
 
 
* SMB (Samba) file shares (the CS office staff and some others use these) will be unavailable.  We expect them to be available again by 10:00 am.
 
 
* MySQL service via the mysql.cs.jhu.edu server and the dbase.cs.jhu.edu server will be unavailable.  We expect mysql.cs.jhu.edu to be available by 10:00am and dbase.cs.jhu.edu by 12:00 pm.
 
}}
 
-->
 
 
 
<!--{{outage
 
  |type=Limited availability
 
  |time=June 10 through August 10, 2022
 
  |services=ugrad1 through ugrad12
 
  |summary=''ugrad1'' through ''ugrad12'' will only be available remotely through SSH.  Please see the CS Computing Lab Availability section below for details.
 
}}-->
 
<!--
 
*******************************************
 
**** UGRAD CLIENT UPGRADES TEMPLATE *******
 
*******************************************
 
====CS Linux Client Unavailability During Upgrades====
 
 
:We are upgrading our [https://support.cs.jhu.edu/wiki/Category:Linux_Clients CS Linux Clients] to Fedora 35 (from Fedora 33) per the following schedule:
 
 
:* On Monday, January 24 the systems in Malone G61's Masters/Ugrad Lab will be upgraded.  This includes all masters lab systems (masters1 through 16) and the ugrad lab systems in that same area (ugrad13 through 24).  Please use ugradx and gradx instead.
 
:** As of 4:00 pm, all of the Malone G61 upgrades have been completed.
 
 
:* On Tuesday, January 25, the systems in the Malone 122 Ugrad Lab will be upgraded.  These are ugrad lab systems ugrad1 through 12.  Please use one of the already-upgraded ugrad systems (ugrad13 through ugrad24) instead.  You may also use the not-yet-upgraded ugradx if you want.
 
:** As of 2:00 pm, all of the Malone 122 upgrades have been completed.
 
 
:* On Wednesday, January 26, in addition to any of the above systems that we were unable to upgrade the prior two days, we will also upgrade the Linux clients ugradz and gradz.  Please use any of the already-upgraded systems (ugrad1 through ugrad24 or masters1 through masters16) instead.  You may also use the not-yet-upgraded ugradx and gradx if you want.
 
:** As of 2:00 pm, both ugradz and gradz have been upgraded.
 
 
:* On Wednesday, February 2, the Linux clients ugradx and gradx will be upgraded.  Please use ugradz/gradz or the lab client systems (ugrad1-24/masters1-16) instead.
 
:** As of 2:00 pm, both ugradx and gradx have been upgraded.
 
 
:'''NOTE:'''  On each day, the upgrades will start at roughly 9:00 am and are expected to be complete by 5:00 pm.
 
END TEMPLATE - UGRAD CLIENT UPGRADES -->
 
<!-- TEMPLATE FOR POWER OUTAGE
 
==== Major CS Grad/Research Net and Ugrad Net IT Services Outage====
 
 
 
:'''WHAT:''' Most CS IT services will be ''un''available due to file server maintenance.
 
 
:'''WHEN:'''  ''Tuesday, December 28, 5:30am to 7:30am.''
 
 
:'''DETAILS:''' We will be performing maintenance on our two file servers, rtfm and barley, that will require downtime for both those systems and several other major CS IT services as well.  The affected IT services will be unavailable on Tuesday, December 28, from 5:30am to 7:30am.  Please see below for the list of affected services.
 
 
=====CS IT Services That Will ''Not'' Be Available During The System Maintenance=====
 
 
* CS Mail service, both incoming and outgoing, will be suspended for CS Grad/Research Net users.  Some CS email services will not be available for CS Ugrad Net users.
 
** Incoming mail ''should'' be queued by the sender until our mail service is back up again.
 
** Outgoing CS mail will not be available to Grad Net users, but since CS Ugrads can send through the JHU mail server, CS Ugrads might still be able to send email during the outage.
 
** IMAP, POP, and webmail (for both Grad/Research and Ugrad accounts) will be unavailable.
 
 
* '''No''' locally-stored CS webpages will be available.  The main CS website (run by WSE) will remain available, but, if you have a personal or lab page that we maintain locally in the dept, those will be unavailable.  The CS IT Support Wiki and its Notices page will remain available.
 
 
* Grad/Research Net and Ugrad Net user accounts and home directories will be inaccessible during the outage.
 
 
* ssh service to our CS Grad/Research Net & Ugrad Net Linux boxes (masters1 through masters16, ugrad1 through ugrad24, gradx, gradz, ugradx, and ugradz) will be unavailable.
 
 
* Console (desktop) access at any of our lab Linux client systems will be unavailable.
 
 
* SMB (SAMBA) file shares (the CS Office Staff and some others use these) will be unavailable.
 
 
* MySQL service via the mysql.cs.jhu.edu server and the dbase.cs.jhu.edu server will be unavailable.
 
  
:We will update this Notices page if there are changes or any delay in the restore time of our IT services.
 
-->
 
<!--
 
*******************************************
 
*********  POWER OUTAGE TEMPLATE***********
 
*******************************************
 
  
  
-->
 
 
<!--
 
<!--
 
-->
 
-->

Revision as of 14:40, 19 August 2024


CS IT STAFF AVAILABILITY

  • The CS IT Support staff is back in Malone Hall. Our group is working a hybrid schedule with some of us working remotely on certain days, while others of our team are on campus.
  • We continue being available M-F, 8:30 to 5pm, but there may be certain times we might be online only.
  • Therefore, please remember to email support@cs.jhu.edu for assistance.
  • Also, please have Zoom available on your device(s), so that we can arrange to contact you using that method, as an alternative to in-person communication.
  • For the time being, Steve DeBlasio, our accounts liaison, is providing a virtual version of his daily office hours for accounts, etc. Email support@cs.jhu.edu for details.


CS IT SERVICE OUTAGES (Unplanned & Planned)

UNPLANNED CS IT SERVICE OUTAGES

None at this time.


PLANNED CS IT SERVICE OUTAGES

OUTAGE: CS Linux Lab Systems Downtime/Upgrade Schedule

WHEN: Monday, August 19 through Friday, August 23

WHAT: Subsets of the CS Linux clients will be down for upgrades over the course of the week.

DETAILS: In prepping for the new semester, we will be upgrading the CS Dept's Linux clients (our lab systems and others that are remotely-accessible-only) from Fedora 38 to Fedora 40. This will require having the clients offline during the upgrades. We'll do this in stages, so there will always be some clients available at all times.

The upgrade schedule for these systems will be as follows:

  • On Monday, August 19, ugrad1 through ugrad12 (in MH 122) will be upgraded.
  • On Tuesday, August 20, ugrad13 through ugrad24 and masters1 through masters16 (in MH G61) will be upgraded.
  • On Wednesday, August 21, ugradz and gradz (remotely-accessible only) will be upgraded.
  • On Thursday, August 22, ugradx and gradx (remotely-accessible only) will be upgraded.
  • On Friday. August 23, any systems that had to be skipped during the previous days will be upgraded. Our Notices page will have information about any such systems.




CS COMPUTING LAB AVAILABILITY

MH 122 (CS Undergrad Lab/Collaboration room) is available for in-person access.


MH G61 (CS Masters/Ugrad Labs) is available for in-person access.


AUDIO/VISUAL (A/V) OUTAGES

None at this time.