Difference between revisions of "Notices"

 
(822 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
<!--  *************** BEGIN ACTIVE NOTICES **************************** -->
 
<!--  *************** BEGIN ACTIVE NOTICES **************************** -->
  
== <span style="color:#ff0000">SERVICE OUTAGES <span>==
+
== <span style="color:#ff0000">CS IT STAFF AVAILABILITY</span> ==
  
<!--
+
*  The CS IT Support staff is back in Malone Hall. Our group is working a hybrid schedule with some of us working remotely on certain days, while others of our team are on campus. 
 +
* We continue being available M-F, 8:30 to 5pm, but there may be certain times we might be online only.
 +
*  Therefore, please remember to email [mailto:support@cs.jhu.edu support@cs.jhu.edu] for assistance.
 +
*  Also, please have [https://support.cs.jhu.edu/wiki/Zoom Zoom] available on your device(s), so that we can arrange to contact you using that method, as an alternative to in-person communication.
 +
* For the time being, Steve DeBlasio, our accounts liaison, is providing a virtual version of his daily office hours for accounts, etc.  Email [mailto:support@cs.jhu.edu support@cs.jhu.edu] for details.
  
=== PLANNED ''JHU'' SERVICE OUTAGES ===
+
<br><p>
  
::'''WHAT:''' JHU Network Outage (wired and wifi) While They Update Malone Hall's Network Switches.
 
  
::'''WHEN:''' Thursday, October 3, starting at 10:30pm and lasting to approximately midnight.
+
<!--
 +
== <span style="color:#ff0000">JHU IT SERVICE OUTAGES AFFECTING CS IT SERVICES<span>==
 +
=== PLANNED ''JHU'' SERVICE OUTAGES ===
 +
-->
  
::'''DETAILS:''' JHU is updating the software on all the Malone Hall closet network switches this coming Thursday evening. Each switch might take up to 10 minutes to rebootThe whole process might take an hour and a half, but you're likely to only notice a few minute outage, depending upon what wallport your system is connected to or what wifi access point you're connected to.
+
<!-- TEMPLATE JHU Service Outages -->
 +
<!--
 +
{{outage
 +
  |type=Planned JHU outage
 +
  |services=Malone Hall
 +
  |time=Friday, March 10, starting around 11am and lasting until completed
 +
  |summary=Wi-Fi access point replacement
 +
  |details=JHU Networking will be swapping out all of the Hopkins-managed Malone Hall ''wifi'' access points in the building. They plan to start work around 11am that Friday, and they expect it could take 4 hours, more or less, to replace them allDuring that time, wifi access might disappear and reappear.  Additionally, when your wireless device tries to reconnect to the newly-replaced access point, you ''might'' be prompted to accept a certificate, and we were informed that you should do so.<br/>
 +
<br/>
 +
After the wifi outage, if you continue to have issues with your device, '''''please contact JHU IT directly...''''' Visit [[Wireless Networking]] for details on who to contact for assistance.
 +
}}
 +
-->
 +
<!--
 +
::JHU Networking has indicated they are testing power transfer equipment in Mason Hall that will affect several buildings, including Malone and Hackerman.  They will be cycling power to the buildings, perhaps several times.  They expect their outages to be < 10 seconds each.
  
::So, if you're in a Malone Hall office or lab, and your system is connected to a wallport (or to a local switch connected to a wallport), you will probably notice up to 10 minutes of no network connection at some point sometime between 10:30 and midnightYou might experience the same loss of network connectivity  with any connections to wifi in Malone Hall.
+
::Our CS IT servers that provide you most of our IT services should remain up and running, since our servers have backup battery power.  Unfortunately, the JHU network in the building does not.  So, you will probably experience brief network interruptions when the power is cycled by FacilitiesAnd each time the power is out, CS services that you interact with (email, web, home directories, etc.) will be inaccessible due to the building's network being unavailable during the outage times.
  
:: G29 server room users: We're told that the G29 server room itself will not have its network switch affected, however, connections to and from G29 might be affected the building network switch its connected to is rebooted.  
+
::Faculty who run their own servers in the CS Server Room (MH G-29), please note that if you do not have UPS units in your racks (and most of you do not), you can expect your systems will power cycle each time Facilities cycles power in Malone Hall.  Please be aware.  PhD students who maintain those systems (and perhaps other systems in the building), please keep that in mind as well.
<br>
 
-------------------------------------------------------------- -->
 
  
=== UNPLANNED CS SERVICE OUTAGES ===
+
::The CS computing labs' systems (currently, for the summer, all located in G-61), those computers are not on UPS systems, so those computers will power cycle and should boot back up on their own.  But, if you're planning to use our lab systems, because they might go up and down several times during the electrical work time period, you might not want to do your school work on those systems during that time.
 +
-->
 +
<!--
 +
::JHU Facilities is preparing for BGE to test electrical equipment that affects several Homewood buildings.  They will be performing this test on Saturday evening, June 26 at 8pm.  If you recall, back on May 6, there was a very short power outage that affected our building and others.  The testing BGE will be doing is part of their troubleshooting what happened in May.
  
:None at this time.
+
::In the case of the upcoming 6/26 testing, there is a potential for another short power outage (1 to 2 minutes) that evening.
  
<br>
+
::A short outage of this type will affect our CS servers and IT services in the following way:  Although our servers should physically stay running, as they are on battery-backed equipment, because our services require network connections that are controlled by JHU (and not on battery backup), all of our CS IT services will be unavailable during the expected brief outage.
  
=== PLANNED CS SERVICE OUTAGES ===
+
::Once the power returns, our services should be available again, because the network should be available again.
  
:None at this time.
+
::Also, if there is indeed an outage, the CS Grad and Undergrad Lab systems (that currently, you can only access remotely) will power off.  However, when power is restored, those lab systems should automatically reboot.
<!--              TEMPLATES          -->
 
<!--  TEMPLATE 1 START
 
  
 +
::Other notes:  WiFi and other networking in the building would be unavailable during the outage.  Most likely, lights would be unavailable.  My group does not maintain J-Card systems, so we do not know how the J-Card readers will perform during a power outage.
  
<hr>
+
::''For your own equipment, whether it be in your office or the server room, please prepare as for any other planned power outage.''
:'''WHAT:''' Linux kernel bug causing some of our Fedora 31 lab systems to hang.
 
  
:'''WHEN:''' First identified in CS, last week of January, 2020.    '''''UPDATES below the DETAILS section...'''''
+
::If there are additional details that we hear of, we will update here.
  
:'''DETAILS:'''
+
<br>
 +
-->
  
::As you know, recently, we upgraded our lab Linux clients to Fedora 31.  Over the past several days, we've discovered some odd behavior from some of the lab systems.  Upon further investigation, we have learned that there is a kernel bug that is causing some systems to hang (requiring a reboot) when certain NFS operations are performed.  (NFS is the system that allows our Linux clients to access the home directories, certain apps, other shared file systems.)
+
== <span style="color:#ff0000">CS IT SERVICE OUTAGES (Unplanned & Planned)<span>==
  
::We're seeing that the bug is documented and that it affects not only Fedora 31, but some prior versions as well.  It just happens to be that we are seeing its effects now.
+
<!--
 +
=== UNPLANNED ''JHU'' SERVICE OUTAGES ===
  
::This is a Linux kernel issue and there are Linux folk working on trying to get this bug patched, but we do not know how long it will take.
+
====<span style="color:#ff0000">9/29/23 MAJOR JHU email outage and delays</span>====
  
::In the meantime, CS IT is looking into work-arounds to bypass this bug as much as possible.
+
:JHU is experiencing email issues with it's @jhu.edu mail services due to a global outage at Cisco.  This affects both incoming and outgoing email messages to external recipients.  It also impacts systems that send email through JHU's email gateways.  Expect major mail delays until this is fixed.  (We suspect that those with @jhu.edu addresses can still send and receive to others with @jhu.edu addresses.)
  
::There is no way to predict if or when this bug will cause a system to hang.  Some of our systems may never notice it.  We think it might happen to some systems that are heavily utilizing NFS operations, but again, we're not sure.
+
:'''''UPDATE:'''''  JHU has implemented a work-around to the email problem, and email delivery has returned to normal.
 +
-->
 +
<!--TEMPLATE
 +
{{outage
 +
  |services=
 +
  |summary=
 +
  |time=
 +
  |details=
 +
}}
 +
-->
  
::Our recommendation is that when you're editing files, etc. save your work on a regular basis, just in case.  This is a good practice to follow anyway.
+
<!-- <br>-->
  
::'''''IMPORTANT:'''''  If you experience a system that hangs (and doesn't recover after several minutes), please email  {{mailto|support}} to let us know the name of the system that experienced the hang, the time of the hang, and what activity you were doing on the system at that time (which will help us troubleshoot the problem further.)
+
=== UNPLANNED CS IT SERVICE OUTAGES ===
 
::We will update here with our progress on circumventing this bug.
 
  
::'''UPDATE:  1/29/20'''  We are applying alternative pre-bug kernels to those  Linux clients that are available to be rebooted (to activate these kernels.)  As more become available, we'll reboot them as well.  We're hoping these alternative kernels will prevent the hangups until officially patched kernels become available.
 
  
::'''UPDATE:  2/7/20'''  We have applied updates to most of our systems in order to activate the alternative pre-bug kernels, which we hope will prevent hangupsThere are still some systems which have not yet had the alternative kernels applied, and that will happen as the systems become available for us to reboot.
+
<!--TEMPLATE
 +
{{outage
 +
  |time=Started Aug 15, 2022 around 7am
 +
  |services=MH-122's MH122PRT printer
 +
  |summary=The HP printer in MH-122, mh122prt, is down due to a fuser error.  Service has been called.
 +
   |details=In the meantime, please use the printer in MH-G61, mhG61prt.<br/>
 +
<br/>
 +
Other available printers can be found at:  [[Available Printers]]
 +
}}
 +
-->
  
TEMPLATE 1 END-->
+
:None at this time.
<!--  TEMPLATE 2 START
 
  
 +
<!--====<span style="color:#0000ff">PHISHING EMAIL AND OTHER ACCOUNT ISSUES!</span>====
  
===Suspended (Unavailable) ''Grad/Research Net'' services while rtfm.cs.jhu.edu & blaze.cs.jhu.edu are down:===
+
<div style="color:#0000ff">
 +
:5/5/20:  We are currently receiving a large number of phishing emails directed at the CS Department.  If you receive an email with links in it and have ''any'' doubts about the email, '''do not click the link'''. You '''do not''' need to send the emails to us at this time, as we are actively tracking the situation.
  
* CS Mail service, both incoming and outgoing, will be suspended for CS Grad/Research Net users.
+
::Also...
  
* Incoming mail should be queued by the sender until our mail service is back up again. Outgoing mail will not be available.  
+
:Because of these phishing attacks, if you've followed the phishing links and provided your account credentials to others, and then find you are unable to login to your CS account get your CS email, then, please see our [https://support.cs.jhu.edu/wiki/How_To_Reset_Your_Password password reset procedures]. If your CS email account has been disabled, and you need you need to contact us,  you will need an alternate non-CS email address to do so.  Also, if you did follow a phishing link and enter your account credentials and then realize what happened, please email [mailto:support@cs.jhu.edu support@cs.jhu.edu] '''''right away''''', and let us know.
  
* IMAP, POP, and Webmail from our CS (Grad/Research Net) Mail server will be unavailable.  
+
</div>-->
 +
<!--:None at this time.-->
  
* Some CS webpages, including user (and possibly lab and other CS pages), will be unavailable.
+
=== PLANNED CS IT SERVICE OUTAGES ===
  
* Grad/Research Net user accounts/home directories will be inaccessible during the downtime.  
+
:None at this time.
 +
<!--
  
* SMB File Shares (CS Office Staff uses these) will be unavailable.
+
====Major Malone Power Outage Planned (Affecting CS IT Services) - Saturday, March 30 from 6am to 2:30pm (CS IT Services Outage before and after Power Outage as well)====
  
* ssh service to our CS Grad/Research Net Linux boxes (masters1 through masters16, gradx, and gradz) will be unavailable.  
+
:'''WHAT:''' There will be '''''no''''' CS IT computing services available during an upcoming all-day major power outage for ALL of Malone Hall.
  
* Console (desktop) access to masters1 through masters16 will be unavailable.
+
:'''WHEN:'''  Power Outage - Saturday, March 30, 2024, starting at '''6am''' and running until '''2:30pm''' (so, roughly, 8.5 hours.)
  
* MySQL service via the mysql.cs.jhu.edu server will be unavailable.  
+
:: Loss of CS IT services - Saturday, March 30, 2024, starting at '''5am''' (one hour before the power outage) and lasting until '''4:30pm''' (two hours after the power outage is completed.)
  
 +
:'''DESCRIPTION:'''  JHU is planning an a all-day power outage for Malone Hall, and all of our computing services will be unavailable during that time.
  
 +
:The actual power outage is planned to start at 6am, Saturday morning, March 30,, and will continue  for approximately an 8.5 hours.  '''''However,''''' we need to safely bring down our computer servers and clients ''earlier'' than that (before the power goes out.)  We plan to bring our systems down that morning around '''5am'''.  And although the power to the building should restored around 2:30pm that same day, we will not have all our systems back up and running until approx. 4:30pm, so plan on about 2 hours after the power outage is deemed over until our servers and services are available again.
  
 +
:<span style="color:#ff0000">Please read all of the notes below regarding Malone Hall Residents, CS Server Room users, and a list of the CS IT services that will be unavailable during the outage. </span>
  
TEMPLATE 2 ends -->
+
::<span style="color:#ff0000">'''NOTES TO MALONE HALL RESIDENTS:'''</span>  During the time of the outage, we're assuming most building lights will be out and the J-Card system might be out too. That might make it more difficult to get into the building during the outageBut with the power out, we're not sure how much need there will be for anyone to be in the building during that time anyway. If you have an office refrigerator, expect that to be out too. If you are counting on your UPS (battery-backup) systems to continue powering your office equipment, keep in mind the expected length of the outage (8 hours) and plan for a longer period of time, just to be safe. And keep in mind that your office phones may be inoperable during the outage.  So please plan in advance for this outage.  
<!--:None at this time.-->
 
<!--    -->
 
<!--******************MORE TEMPLATES BEGIN HERE*****************-->
 
<!--    -->
 
<!-- ******TEMPLATE GRAD NET OUTAGE*****
 
====Major CS Grad/Research Net service outage (mail, web, home directories, login, etc.) ====
 
<!----------------:None at this time.------------------------>
 
<!--;'''WHAT'''
 
:Major CS Grad/Research Net (and some Ugrad) IT services outage, as we update our file server system.  
 
;'''WHEN'''
 
:''Wednesday, June 13, from 5:30pm to approx 7:30pm.''
 
;'''UPDATE'''
 
:June 13, 8:30pmThe service outage is complete, and are services our back to normal operation.
 
;'''DETAILS'''
 
:Our CS Grad/Research Net home directory file server-related system, ''rtfm.cs.jhu.edu'', will be shut down so that important server-related updates can be applied. (In order to shut down that server, we must also shut down our mail, DNS, and other services server, ''blaze.cs.jhu.edu''.)  We will apply the required updates on Wednesday, June 13, from 5:30pm to approximately 7:30pm.
 
:
 
:During the process of applying updates, several of our CS services will be unavailable.   If there are any unexpected complications during the update process that will delay the restoration of services, we will update this CS IT Support Wiki's Notices page.  
 
  
===Suspended (Unavailable) ''Grad/Research Net'' services while rtfm.cs.jhu.edu & blaze.cs.jhu.edu are down:===
+
::<span style="color:#ff0000">'''NOTE TO CS SERVER ROOM (MH G-29) SERVER OWNERS:''' </span>  Our server room will be out of power, so our servers will be unavailable. If you host servers in the server room, your servers will be down as well. Plan ahead of time to shut down and to bring back up your servers. Your group is responsible for any systems you choose to shut down before the outage or boot back up after the outage.
  
* CS Mail service, both incoming and outgoing, will be suspended for CS Grad/Research Net users.
+
=====Tracking Our CS IT Services Status Updates During The Outage=====
  
* Incoming mail should be queued by the sender until our mail service is back up again. Outgoing mail will not be available.
+
:Because we will not have power to our servers in Malone Hall, the CS IT Support Wiki, and especially this Notices page ( https://support.cs.jhu.edu/wiki/Notices ) will be unavailable during the outage. Instead, during the outage, we have arranged for status updates to be available at the following website (served at an off-site facility):
  
* IMAP, POP, and Webmail from our CS (Grad/Research Net) Mail server will be unavailable.  
+
::[https://csstatus.jhu.edu https://csstatus.jhu.edu]  We will update that page soon with this information.
  
* Some CS webpages, including user (and possibly lab and other CS pages), will be unavailable.
+
:(Bookmark that link ahead of time, in case you can't access your CS mail during the outage.)
  
* Grad/Research Net user accounts/home directories will be inaccessible during the downtime.  
+
:As soon as we're able to do so after the outage, we'll also make this Notices page available again.
  
* SMB File Shares (CS Office Staff uses these) will be unavailable.  
+
=====CS IT Services ''Un''available During The Power Outage Include...=====
  
* ssh service to our CS Grad/Research Net Linux boxes (masters1 through masters16, gradx, and gradz) will be unavailable.  
+
* DNS resolution (hostname lookups) for all cs.jhu.edu hostnames will be unavailable.  This will affect all websites with cs.jhu.edu domain names, even if the website is hosted by someone other than the CS department.
  
* Console (desktop) access to masters1 through masters16 will be unavailable.  
+
* CS Mail service, both incoming and outgoing, will be suspended for CS Grad/Research Net users.  And some CS email services will not be available for CS Ugrad Net users.
 +
** Incoming mail ''should'' be queued by the sender until our mail service is back up again. Outgoing mail will not be available.
 +
** Outgoing CS mail will not be available to Grad Net users, but since CS Ugrads can send through the JHU mail server, CS Ugrads might still be able to send email during the outage (just not from a Malone Hall–based computer.)
 +
** IMAP, POP, and webmail (for both Grad/Research and Ugrad accounts) will be unavailable.
  
* MySQL service via the mysql.cs.jhu.edu server will be unavailable.  
+
* '''No''' CS webpages will be available.  This includes the main CS website.  And, as mentioned above... because we will not have power to our servers, the CS IT Support Wiki, and especially its Notices page will be unavailable during the outage.  Please refer to https://csstatus.jhu.edu for status updates during the outage.
  
: '''Note to Ugrad Net users:''' During the rtfm.cs.jhu.edu and blaze.cs.jhu.edu updates, email directed to your ugrad acct @cs.jhu.edu will not be immediately delivered. Other Ugrad Net services should remain available. -->
+
* Grad/Research Net and Ugrad Net user accounts and home directories will be inaccessible during the power outage.
<!--    -->
 
<!--******************TEMPLATES BEGIN HERE*****************-->
 
<!--    -->
 
<!-- ******TEMPLATE GRAD NET OUTAGE*****
 
====Major CS Grad/Research Net service outage (mail, web, home directories, login, etc.) ====
 
  
'''WHAT:''' Major CS Grad/Research Net (and some Ugrad) IT services outage, as we apply security updates to our systems.  
+
* ssh service to our CS Grad/Research Net & Ugrad Net Linux boxes (masters1 through masters16, ugrad1 through ugrad24, gradx, gradz, ugradx, and ugradz) will be unavailable.
  
'''WHEN:''' '''''Rescheduled for''''' Thursday, January 18, from 5am to approx 7am.
+
* Console (desktop) access at any of our lab Linux client systems will be unavailable.
  
'''DETAILS:''' Many  CS Grad/Research Net servers will be shut down to apply security updates.  We will apply these updates on Thursday, January 18, from 5am to approximately 7am.
+
* SMB (SAMBA) File Shares (the CS Office Staff and some others use these) will be unavailable.
  
During the process of applying updates, several of our CS services will be unavailable.   If there are any unexpected complications during the update process that will delay the restoration of services, we will update the CS IT Support Wiki's Notices page at https://support.cs.jhu.edu/wiki/Notices
+
* MySQL service via the mysql.cs.jhu.edu server and through the dbase.cs.jhu.edu server will be unavailable.
  
Suspended (Unavailable) Grad/Research Net services while the servers are updated:
+
* Network switches in the building will be without power, so no network connections in Malone Hall.
  
* CS Mail service, both incoming and outgoing, will be suspended for CS Grad/Research Net users.
+
* Wifi access points in Malone Hall will be without power and will therefore not be available.
 +
<br>
 +
-->
 +
<!--
 +
{{outage
 +
  |type=Planned outage
 +
  |services=most CS IT services
 +
  |time=Tuesday, December 27, 9:00 am to 12:00 pm
 +
  |summary=Most CS IT services will be unavailable due to file server maintenance.
 +
  |details=We will be performing maintenance on our several of servers. This will require downtime for several major CS IT services.  The affected IT services will be unavailable on the morning of Tuesday, December 27, starting at 9:00 am.  Most services should be restored before 10:00 am, but services depending on the ugrad file server will remain unavailable for longer.  Please see below for the list of affected services.<br/>
 +
<br/>
 +
'''CS IT Services That Will Not Be Available During The System Maintenance:'''<br/>
  
* Incoming mail should be queued by the sender until our mail service is back up again. Outgoing mail will not be available.  
+
* CS mail service, both incoming and outgoing, will be suspended for CS Grad/Research Net users.  Some CS email services will not be available for CS Ugrad Net users.  Incoming mail should be queued by the sender until our mail service is back up again. Outgoing CS mail will not be available to Grad Net users.  CS ugrads can send through the JHU mail server, which will remain available.  We expect mail service to be restored by 10:00 am, but see below about mail retrieval for ugrad accounts.
  
* IMAP, POP, and Webmail from our CS (Grad/Research Net) Mail server will be unavailable.  
+
* IMAP, POP, and webmail (for both Grad/Research and Ugrad accounts) will be unavailable.  We expect Grad Net email to be full operational by 10:00 am.  Ugrad IMAP, POP, and webmail should be available by 12:00 pm.
  
* Some CS webpages, including user (and possibly lab and other CS pages), will be unavailable.  
+
* No locally-stored CS webpages will be available. The main CS website (run by WSE) will remain available, but some individual pages may fail to load.  Personal webpages (both grad and ugrad) will not load.  Other websites hosted by us for department affiliates (e.g. lab websites) will be unavailable.  The CS IT Support Wiki and its Notices page will remain available.  We expect all service interruptions for the main webserver (www.cs.jhu.edu) and hosted websites to be completed before 10:00 am. Ugrad personal webpages should be available again by 12:00 pm.
  
* Grad/Research Net user accounts/home directories will be inaccessible during the downtime.  
+
* Grad/Research Net and Ugrad Net user accounts and home directories will be inaccessible during the services outage.  We expect Grad Net services to be restored by 10:00 am and Ugrad Net services by 12:00 pm.
  
* SMB File Shares (CS Office Staff uses these) will be unavailable.  
+
* ssh service to our CS Grad/Research Net & Ugrad Net Linux boxes (masters1 through masters16, ugrad1 through ugrad24, gradx, gradz, ugradx,and ugradz) will be unavailable.  We expect Grad Net services to be restored by 10:00 am and Ugrad Net services by 12:00 pm.
  
* ssh service to our CS Grad/Research Net Linux boxes (masters1 through masters16, gradx, and gradz) will be unavailable.  
+
* Console (desktop) access at any of our lab Linux client systems will be unavailable.  We expect Grad Net systems to be available again by 10:00 am and Ugrad Net systems by 12:00 pm.
  
* Console (desktop) access to masters1 through masters16 will be unavailable.  
+
* SMB (Samba) file shares (the CS office staff and some others use these) will be unavailable.  We expect them to be available again by 10:00 am.
  
* MySQL service via the mysql.cs.jhu.edu server will be unavailable.  
+
* MySQL service via the mysql.cs.jhu.edu server and the dbase.cs.jhu.edu server will be unavailable. We expect mysql.cs.jhu.edu to be available by 10:00am and dbase.cs.jhu.edu by 12:00 pm.
 +
}}
 +
-->
  
Note to Ugrad Net users: During the Grad Net servers' security updates process, email directed to your ugrad acct @cs.jhu.edu will not be immediately delivered. Other Ugrad Net services should remain available.  Also, we will be applying security patches on the CS Ugrad net the next day, so you'll see an email for that at some point soon.
 
  
Updates, if necessary, will be posted here.
+
<!--{{outage
******TEMPLATE END*****-->
+
  |type=Limited availability
<!--    -->
+
  |time=June 10 through August 10, 2022
<!--******TEMPLATE BEGIN - UGRAD NET OUTAGE
+
  |services=ugrad1 through ugrad12
 +
  |summary=''ugrad1'' through ''ugrad12'' will only be available remotely through SSH.  Please see the CS Computing Lab Availability section below for details.
 +
}}-->
 +
<!--
 +
*******************************************
 +
**** UGRAD CLIENT UPGRADES TEMPLATE *******
 +
*******************************************
 +
====CS Linux Client Unavailability During Upgrades====
  
::::'''''NOTE:  DATE CHANGE BELOW for OUTAGE #1!!!!!!!!''''' -->
+
:We are upgrading our [https://support.cs.jhu.edu/wiki/Category:Linux_Clients CS Linux Clients] to Fedora 35 (from Fedora 33) per the following schedule:
<!------------==== Major CS ''UGrad Net'' service outage (mail, web, home directories, login, etc.) ====
 
  
 +
:* On Monday, January 24 the systems in Malone G61's Masters/Ugrad Lab will be upgraded.  This includes all masters lab systems (masters1 through 16) and the ugrad lab systems in that same area (ugrad13 through 24).  Please use ugradx and gradx instead.
 +
:** As of 4:00 pm, all of the Malone G61 upgrades have been completed.
  
'''WHAT:''' Major CS Ugrad Net IT services outage, as we reboot our Ugrad home directory file server.  
+
:* On Tuesday, January 25, the systems in the Malone 122 Ugrad Lab will be upgraded.  These are ugrad lab systems ugrad1 through 12.  Please use one of the already-upgraded ugrad systems (ugrad13 through ugrad24) instead.  You may also use the not-yet-upgraded ugradx if you want.
 +
:** As of 2:00 pm, all of the Malone 122 upgrades have been completed.
  
'''WHEN:''' Friday, October 18 (Fall Break Day) from 9am to approx 10am.
+
:* On Wednesday, January 26, in addition to any of the above systems that we were unable to upgrade the prior two days, we will also upgrade the Linux clients ugradz and gradz.  Please use any of the already-upgraded systems (ugrad1 through ugrad24 or masters1 through masters16) instead.  You may also use the not-yet-upgraded ugradx and gradx if you want.
 +
:** As of 2:00 pm, both ugradz and gradz have been upgraded.
  
'''UPDATE''': As of 9:45 am, all affected systems are back in service.
+
:* On Wednesday, February 2, the Linux clients ugradx and gradx will be upgraded.  Please use ugradz/gradz or the lab client systems (ugrad1-24/masters1-16) instead.
 +
:** As of 2:00 pm, both ugradx and gradx have been upgraded.
  
'''DETAILS:''' To patch a problem on our Ugrad home directory file server called barley, we need to reboot it.  The boot process should take less than an hour.
+
:'''NOTE:''' On each day, the upgrades will start at roughly 9:00 am and are expected to be complete by 5:00 pm.
 +
END TEMPLATE - UGRAD CLIENT UPGRADES -->
 +
<!-- TEMPLATE FOR POWER OUTAGE
 +
==== Major CS Grad/Research Net and Ugrad Net IT Services Outage====
  
During the reboot process, several of our CS services will be unavailable.  If there are any unexpected complications during the reboot process that will delay the restoration of services, we will update the CS IT Support Wiki's Notices page at https://support.cs.jhu.edu/wiki/Notices
 
  
Suspended (Unavailable) Ugrad Net services while barley is rebooted:
+
:'''WHAT:''' Most CS IT services will be ''un''available due to file server maintenance.
  
* CS Ugrad Mail service, both incoming and outgoing, will be suspended for CS Ugrad Net users.
+
:'''WHEN:'''  ''Tuesday, December 28, 5:30am to 7:30am.''
  
* Incoming mail should be queued by the sender until our mail service is back up again. Outgoing mail will not be available.  
+
:'''DETAILS:''' We will be performing maintenance on our two file servers, rtfm and barley, that will require downtime for both those systems and several other major CS IT services as well. The affected IT services will be unavailable on Tuesday, December 28, from 5:30am to 7:30am.  Please see below for the list of affected services.
 +
 +
=====CS IT Services That Will ''Not'' Be Available During The System Maintenance=====
  
* IMAP, POP, and Webmail from our CS (Ugrad Net) Mail server will be unavailable.  
+
* CS Mail service, both incoming and outgoing, will be suspended for CS Grad/Research Net users.  Some CS email services will not be available for CS Ugrad Net users.
 +
** Incoming mail ''should'' be queued by the sender until our mail service is back up again.
 +
** Outgoing CS mail will not be available to Grad Net users, but since CS Ugrads can send through the JHU mail server, CS Ugrads might still be able to send email during the outage.
 +
** IMAP, POP, and webmail (for both Grad/Research and Ugrad accounts) will be unavailable.
  
* CS Ugrad Net webpages will be unavailable.  
+
* '''No''' locally-stored CS webpages will be available.  The main CS website (run by WSE) will remain available, but, if you have a personal or lab page that we maintain locally in the dept, those will be unavailable.  The CS IT Support Wiki and its Notices page will remain available.  
  
* CS Ugrad Net user accounts/home directories will be inaccessible during the downtime.  
+
* Grad/Research Net and Ugrad Net user accounts and home directories will be inaccessible during the outage.
  
* ssh service to our CS Ugrad Net Linux boxes (ugrad1 through ugrad24, ugradx, and ugradz) will be unavailable.  
+
* ssh service to our CS Grad/Research Net & Ugrad Net Linux boxes (masters1 through masters16, ugrad1 through ugrad24, gradx, gradz, ugradx, and ugradz) will be unavailable.
  
* Console (desktop) access to ugrad1 through ugrad24 will be unavailable.  
+
* Console (desktop) access at any of our lab Linux client systems will be unavailable.
  
* MySQL service via the dbase.cs.jhu.edu server (Dr. Yarowsky's class) will be unavailable.  
+
* SMB (SAMBA) file shares (the CS Office Staff and some others use these) will be unavailable.
  
Updates, if necessary, will be posted here. ------------------------>
+
* MySQL service via the mysql.cs.jhu.edu server and the dbase.cs.jhu.edu server will be unavailable.
<!--:'''WHAT:''' Emergency reboot of ''blaze'', the dept's main Grad/Research net mail server.
 
  
:'''WHEN:''' ''(TODAY!)'' Tuesday, Dec. 12 @ noon and lasting approx 1/2 hour if all goes well.   
+
:We will update this Notices page if there are changes or any delay in the restore time of our IT services.
 +
-->
 +
<!--
 +
*******************************************
 +
********* POWER OUTAGE TEMPLATE***********
 +
*******************************************
  
:'''DETAILS:'''
 
  
::We have discovered an issue with our mail spool disk on ''blaze'' our Grad/Research net mail server which must be corrected right away.  As such, we expect that a configuration change and reboot should fix the problem.  
+
-->
 +
<!--
 +
-->
 +
<!-- ************************* END OF OUTAGE INFO ************************* -->
 +
<!-- ------------------------------------------------------------- -->
 +
<!--
 +
*********************************
 +
** VM Server Shutdown TEMPLATE **
 +
*********************************
  
::We plan to do this shortly, at ''noon today (lunchtime.)'' The reboot should take approx. 1/2 hour if all goes well. If there are issues, it might take some additional time to complete the repair. 
+
'''WHAT:''' The dept's Virtual Machine will be shutdown.
 
 
::During the reboot time, there will be ''no CS email service in or out of the CS Grad/Research network.'' You will not be able to send or receive mail (IMAP/POP/etc.) through blaze (smtp.cs.jhu.edu/pop.cs.jhu.edu) or via webmail during that time. Also, DNS might be slow or non-existent, depending upon your client's own configuration.
 
  
::You also might experience slow connection times to www.cs.jhu.edu.
+
'''WHEN:''' Wednesday, January 11 from 6am to 3pm (or earlier)
  
::Grad Net Lab Linux systems (masters1 through masters16, gradx, and gradz) may experience a short delay as their NIS service connects to a different server.  
+
We need to do some work on the VM server and will be taking it down during the above date and time.
  
::Any updates and notice of completion will be presented through this NOTICES page today.
+
As part of the shutdown process, we will suspend most or all of the VMs; some
 +
VMs might have to be shutdown all the way instead.  And when the VM server is back up and running again, we will restart or unsuspend all VMs.  In all cases, VM owner intervention should not be needed; we can handle this remotely.
  
:'''''UPDATE:''''' 12/12/17 at 12:15pm
+
After the VM server is up and running again, VM owners will receive an announcement (and updates will be posted here), and, we do ask that VM owners check to make sure their VMs are running as expected.  Please email [mailto:support@cs.jhu.edu support@cs.jhu.edu] if there are issues.
  
::Reboot successful! Blaze is back in operation and services have been returned to normal operation.
+
** END VM Server Shutdown TEMPLATE** -->
-->
+
<!-- **Begin Specific Client shutdown TEMPLATE**
  
<!-- :'''WHAT:''' Brief CS network outage
+
'''WHAT:''' ugradz.cs.jhu.edu (one of our CS Dept Linux Ugrad Net compute servers) will go down for a memory upgrade.
  
:'''WHEN:''' ''Rescheduled for'' Thursday, July 20, from 9am to 9:30am.
+
'''WHEN:''' Thursday, April 6, from 9am to 11am.
  
:'''DETAILS:''' JHU Networking (in conjunction with JHU Network Security) will be moving the various CS Networks in Malone Hall from one firewall platform to anotherThis will ''now'' take place on Thursday, July 20 at 9am and should only last approximately 5 minutes or soBut, we're providing a 30 minute window in case JHU Networking needs to troubleshoot any issues.
+
'''DETAILS:''' ugradz will be taken offline so that its memory can be upgradedWhile ugradz is down for its memory upgrade, you can still access our other Ugrad Net Fedora 25
 +
systems (ugrad1 through ugrad24 and ugradx.)  Info about our Fedora systems can be found at: https://support.cs.jhu.edu/wiki/Category:Linux_Clients
  
:During the network outage, CS systems might not be seen by each other, and network traffic between CS and outside-of-CS may be halted.  Many CS services will be unavailable when the network is unavailable.  Again, JHU Networking expects this to be a brief network outage, so you might only experience a short system hang.
+
Please make sure you are logged off of ugradz before the upgrade time.
  
We will update this Notices page in case there are delays with restoring any of our services.
+
Any updates will be posted here.
  
 +
**End Specific Client shutdown TEMPLATE** -->
  
 +
== <span style="color:#ff0000">CS COMPUTING LAB AVAILABILITY </span> ==
 +
<!--  ***** NORMAL POSTING MH 122****** -->
 +
<br>
  
 +
:'''MH 122''' (CS Undergrad Lab/Collaboration room) is available for in-person access.
  
-->
 
  
<!-- ****** FILE SERVER OUTAGE TEMPLATE ******
+
<!--:* As of August, 2022, masks are now '''''optional''''' in the lab-->
  
===Planned Outage 1: CS Ugrad Net File Server Upgrade (barley.cs.jhu.edu)===
+
<!-- for those that are vaccinated '''''and''''' boosted. Masks '''''continue''''' to be '''''required''''' for all others using this lab.-->
 +
<!--
 +
:'''MH 122 ''UNAVAILABILITY'''''
  
 +
::'''WHAT:'''  MH 122 (and its breakout rooms) will be '''''closed''''' for  due to a Human Language Technology Center of Excellence (HLTCOE) workshop being held there. 
 +
::'''WHEN:''' Monday, Jan 8 through Friday, Jan 19, 2024.
  
:'''WHAT:''' Major <span style="color:#ff0000">CS *Undergrad* Net computing services outage</span>, as we upgrade our CS Undergrad Net home directory file  server,''' barley.cs.jhu.edu'''
+
::'''NOTES:'''
 +
:* The G-61 Masters/Ugrad Lab will remain open and available during this time period.  The G-61 printer will remain available as well.
 +
:* The MH 122 Linux systems, ugrad1 through ugrad12, will continue to be available, '''''but only remotely via ssh'''''.  Please see our page on:  [[Linux_Clients_on_the_CS_Undergrad_Net]]
 +
-->
 +
<!--
 +
<--  CLSP SUMMER PROGRAM
 +
:'''MH 122 ''UNAVAILABILITY'''''
 +
::'''WHAT:'''  MH 122 (and its breakout rooms) will be '''''closed''''' for the summer due to a CLSP workshop being held there. 
 +
::'''WHEN:''' Tuesday, June 7 through Wednesday, August 10.
 +
::'''NOTES:'''
 +
-->
 +
<!--
 +
:* The MH 122 Linux systems, ugrad1 through ugrad12, will continue to be available, '''''but only remotely via ssh'''''. There will be some downtime for those systems on 6/7 and on 8/9 (and possibly 8/10) as the systems are transferred from, and then, back to MH 122.  Please see our page on:  [[Linux_Clients_on_the_CS_Undergrad_Net]]
 +
<!--https://support.cs.jhu.edu/wiki/Linux_Clients_on_the_CS_Undergrad_Net-->
 +
<!--for a list of our remotely-available Ugrad Linux systems.
 +
-->
 +
<!--
 +
:* The printer in MH 122 will be ''unavailable'' during this time.
 +
-->
 +
<!--
 +
:* The G61 Masters/Ugrad Lab will remain open and available during the summer, and its Linux systems will be available for in-person and remote work, as usual. The G61 printer will remain available as well.
 +
-->
 +
<!-- ****** NORMAL POSTING G61 ********** -->
 +
:'''MH G61''' (CS Masters/Ugrad Labs) is available for in-person access.
  
:'''WHEN:''' Wednesday, January 18, from ''8am to approx 11am''.
+
<!--:* All CS Linux systems in this lab area (masters1 through masters16 and ugrad13 through ugrad24) are available for use in-person or remotely, via ssh.--> 
  
:'''DETAILS:''' Our CS Undergrad Net home directory file server,  barley.cs.jhu.edu, will be shut down to perform an major upgrade to its operating system.
+
<!--
 +
******************************************************
 +
**** ACM CONTEST TEMPLATE - All CS Labs Closed on Friday/Saturday, Feb 23-24, 2024*****
 +
******************************************************
 +
-->
 +
<!--
 +
=== Malone '''MH 122''' ''and'' '''G61''' Ugrad and Masters Labs <span style="color:#ff0000"> '''''Closure'''''<span>===
  
:Due to this shutdown for an upgrade, several of our CS '''''Ugrad''''' Net services will be unavailable during this time.  If there are any unexpected complications during the upgrade process that will delay the restoration of services, we will update the CS IT Support Wiki's Notices page at [https://support.cs.jhu.edu/wiki/Notices https://support.cs.jhu.edu/wiki/Notices]
+
:'''WHAT:''' Malone Hall MH 122 '''and''' Malone Hall G61, both the Masters and Ugrad sides of the lab, '''and ''all'' the lab Linux computers, will be closed to CS students due to an ACM Programming Contest.
  
====Suspended (Unavailable) Ugrad Net services while ''barley.cs.jhu.edu'' is down====
+
:'''WHEN:'''  Starting Friday evening, Feb 23, 5pm '''through''' Saturday, February 24, 9pm.
  
:::*'''CS Ugrad Mail service,''' both incoming and outgoing, will be suspended for CS Ugrad Net users (as this fileserver works in tandem with our CS Ugrad mail server.)  Incoming mail should be queued until our Ugrad mail service is back up again. Outgoing mail from CS Ugrad Net users will not be available.
+
:'''DETAILS:'''  
  
:::*'''IMAP, POP, and Webmail''' from our CS Ugrad Mail server will be unavailable.  
+
: Both the MH 122 '''and''' G61 Masters and Ugrad Labs will be used for an ACM Programming Contest and will therefore be '''''closed''''' to those not participating in the contest.
  
:::*'''Webpages''' served from our CS Ugrad webserver will be unavailable.  
+
: Additionally, all of the labs' Linux computers (grad1 through grad16 and ugrad1 through ugrad24) will be unavailable during the time period referenced above.
  
:::*'''Ugrad Net user accounts/home directories''' will be inaccessible during the downtime.  
+
* During the lab closure times, compute servers, gradx.cs.jhu.edu, gradz.cs.jhu.edu, ugradx.cs.jhu.ed, and ugradz.cs.jhu.edu  '''''will continue to be available remotely''''', via SSH.
  
:::*'''ssh service to our CS Ugrad Net Linux boxes''' (ugrad1 through  ugrad24,and ugradx) will be unavailable.  
+
* We have to take down the lab systems late that Friday afternoon.  At the end of the ACM contest that Saturday night, the coordinators of that contest will be turning our lab computer systems back on.  Most should boot normally.  But, if some do not, just trying using an alternate one in the lab.  We'll be back in the Monday afterwards and can check on any systems that didn't boot normally.  (And don't forget, as mentioned above our compute servers -- gradx, gradz, ugradx, ugradz -- will continue to be remotely available, even if the lab systems are not.)
  
:::*'''Console (desktop) access to ugrad1 through ugrad24''' will be unavailable. However, although the CS Ugrad computers will be unavailable during the fileserver downtime, the CS Ugrad Labs will remain open.
+
* The printers in MH 122 and MH G61 will remain online, but, please pick up your printouts outside of the contest hours.
  
:::*'''MySQL service via the dbase.cs.jhu.edu server''' (used by a databases class) will be unavailable.
+
-->
 +
<!-- ********* TEMPLATE FOR G61 Masters Closure for ACM Local Contest **********-->
 +
<!--
 +
: '''Malone G61 ''Masters Lab'' Closure'''
  
:Future updates will be posted on the [https://support.cs.jhu.edu/wiki/Notices Notices] page of the CS IT Support Wiki
+
::'''WHAT:''' Malone Hall G61, '''the ''Masters'' side only''', will be closed to CS Masters students due to a ''local'' ACM Programming Contest.
  
===Planned Outage 2: Databases Class MySQL Database Server ('''dbase.cs.jhu.edu''') Unavailability===
+
::'''WHEN:''' Saturday, February 4, from 1:30pm to 7pm.
  
:'''WHAT:''' The Databases class's MySQL database server, dbase.cs.jhu.edu, will be unavailable when the CS Ugrad Net's fileserver, barley.cs.jhu.edu, is being upgraded (see above.)
+
::'''DETAILS:'''  
  
:'''WHEN:''' Wednesday, January 18, from ''8am to approx 11am''.
+
:::The G61 Masters side of the lab will be used for an ACM Programming Contest and will therefore be closed for non-contest use during the 1:30 to 7pm time period on Feb. 4.  The Ugrad side will be unaffected, and Ugrad students may enter through the Master's side of the lab to get to the Undergrad side of the lab.
  
:'''DETAILS:''' dbase.cs.jhu.edu uses the CS Ugrad Net file server and will therefore be unavailable during the barley.cs.jhu.edu upgrade time.
+
:::During the Masters lab closure times, the Masters computers in G61 will continue to be available remotely, via SSH.
  
:Future updates will be posted on the [https://support.cs.jhu.edu/wiki/Notices Notices] page of the CS IT Support Wiki
+
::Please see our [https://support.cs.jhu.edu/wiki/Category:Labs Labs] page for further information about our labs.
 +
-->
 +
<!--
 +
******************************************************
 +
**** G61 Lab Closure Programming Contest TEMPLATE ****
 +
******************************************************
 +
=== Malone '''G61''' Masters Lab/Ugrad Lab '''Closure'''===
  
 +
:'''WHAT:''' Malone Hall G61, both the Masters and Ugrad sides of the lab, will be closed to CS students due to the ACM Programming Contest.
  
****** END FILE SERVER OUTAGE TEMPLATE ******----->
+
:'''WHEN:''' Saturday, February 26, from 11am to 7pm.
<!-- ------------------------------------------------------------- -->
 
<!-- **VM Server Shutdown TEMPLATE **
 
  
'''WHAT:''' The dept's Virtual Machine will be shutdown.
+
:'''DETAILS:'''  
  
'''WHEN:''' Wednesday, January 11 from 6am to 3pm (or earlier)
+
:The G61 Masters and Ugrad Labs will be used for an ACM Programming Contest and will therefore be closed for non-contest use during the 11am to 7pm time period on Feb. 26.
  
We need to do some work on the VM server and will be taking it down during the above date and time.
+
* During the lab closure times, the Masters and Ugrad Linux computers in G61 will continue to be available remotely, via SSH.
  
As part of the shutdown process, we will suspend most or all of the VMs; some
+
* Ugrad Lab, MH 122 will ''not be affected'' and will remain ''open'' during this time
VMs might have to be shutdown all the way instead.  And when the VM server is back up and running again, we will restart or unsuspend all VMs.  In all cases, VM owner intervention should not be needed; we can handle this remotely.
 
  
After the VM server is up and running again, VM owners will receive an announcement (and updates will be posted here), and, we do ask that VM owners check to make sure their VMs are running as expected.  Please email [mailto:support@cs.jhu.edu support@cs.jhu.edu] if there are issues.
 
  
** END VM Server Shutdown TEMPLATE**  -->
+
=== '''''UPDATE''''' - July 19, 2021 - The CS Computing Labs are once again available for '''''in-person access'''''...===
<!-- **Begin Specific Client shutdown TEMPLATE**
 
  
'''WHAT:''' ugradz.cs.jhu.edu (one of our CS Dept Linux Ugrad Net compute servers) will go down for a memory upgrade.
+
:'''MH 122''' (CS Undergrad Lab/Collaboration room): Is now '''''available for in-person access'''''.
 +
::All CS Linux systems in that room (ugrad1 through ugrad12) are available for use in-person or remotely, via ssh. <span style="color:#ff0000">Masks are required for entry.</span>
  
'''WHEN:''' Thursday, April 6, from 9am to 11am.
+
:'''MH G61''' (CS Masters/Ugrad Labs): Is now '''''available for in-person access'''''.
 +
::The Linux systems in this lab area (masters1 through masters16 and ugrad13 through ugrad24) are available for use in-person or remotely, via ssh. <span style="color:#ff0000">Masks are required for entry.</span>
  
'''DETAILS:''' ugradz will be taken offline so that its memory can be upgraded.  While ugradz is down for its memory upgrade, you can still access our other Ugrad Net Fedora 25
+
Please see our [https://support.cs.jhu.edu/wiki/Category:Labs Labs] page for further information.
systems (ugrad1 through ugrad24 and ugradx.)  Info about our Fedora systems can be found at:  https://support.cs.jhu.edu/wiki/Category:Linux_Clients
+
<!--'''NOTE:''' Remember, all of the CS Linux systems, including the ones in the labs, will be unavailable during the March 22 power outage.  Please see above.-->
 
 
Please make sure you are logged off of ugradz before the upgrade time.
 
 
 
Any updates will be posted here.
 
 
 
**End Specific Client shutdown TEMPLATE** -->
 
 
 
== <span style="color:#ff0000">CS COMPUTING LAB AVAILABILITY </span> ==
 
: All CS computing labs available at this time.
 
 
<!--  *************** END ACTIVE NOTICES  ********************-->
 
<!--  *************** END ACTIVE NOTICES  ********************-->
 
<!-- :None at this time. -->
 
<!-- :None at this time. -->
 
<!--PROGRAMMING CONTEST TEMPLATE -->
 
<!--PROGRAMMING CONTEST TEMPLATE -->
<!--    === MH-122 ''and'' MH G-61 (both CS Ugrad labs & the Masters Lab) CLOSURE ON Sat., Nov. 9===
+
<!--    === MH 122 ''and'' MH G61 (both CS Ugrad labs & the Masters Lab) CLOSURE ON Sat., Nov. 9===
  
'''WHAT:'''  The 1st floor CS Ugrad lab, MH-122, and both lab sides of the CS Masters/Ugrad Lab, MH G-61, will be closed due to an ACM Programming Contest.  
+
'''WHAT:'''  The 1st floor CS Ugrad lab, MH 122, and both lab sides of the CS Masters/Ugrad Lab, MH G61, will be closed due to an ACM Programming Contest.  
  
 
'''WHEN:'''  Saturday, November 9, from 9am - 7pm.  
 
'''WHEN:'''  Saturday, November 9, from 9am - 7pm.  
Line 331: Line 429:
 
 
 
 
 
:for a list of our remotely available Linux systems.              -->
 
:for a list of our remotely available Linux systems.              -->
 
 
 
<!--
 
<!--
 
*
 
*
Line 346: Line 442:
  
  
'''''WHERE:'''''  Malone Hall G-61, both the Masters and Ugrad sides of the lab.
+
'''''WHERE:'''''  Malone Hall G61, both the Masters and Ugrad sides of the lab.
  
 
'''''WHEN:'''''  Monday, March 14 & Tuesday, March 15, from 6am to 12 Noon.
 
'''''WHEN:'''''  Monday, March 14 & Tuesday, March 15, from 6am to 12 Noon.
Line 355: Line 451:
 
=====NOTES:=====
 
=====NOTES:=====
  
* During the lab closure times, the masters and ugrad Linux computers in G-61 will continue to be available remotely, via SSH.
+
* During the lab closure times, the masters and ugrad Linux computers in G61 will continue to be available remotely, via SSH.
  
 
* Ugrad Lab, MH 122 will not be affected and will remain open during those times.
 
* Ugrad Lab, MH 122 will not be affected and will remain open during those times.
Line 489: Line 585:
  
 
== <span style="color:#ff0000">AUDIO/VISUAL (A/V) OUTAGES</span> ==
 
== <span style="color:#ff0000">AUDIO/VISUAL (A/V) OUTAGES</span> ==
 
+
:None at this time.  
:None at this time.
 
  
 
[[Category:All]]
 
[[Category:All]]

Latest revision as of 17:07, 19 April 2024


CS IT STAFF AVAILABILITY

  • The CS IT Support staff is back in Malone Hall. Our group is working a hybrid schedule with some of us working remotely on certain days, while others of our team are on campus.
  • We continue being available M-F, 8:30 to 5pm, but there may be certain times we might be online only.
  • Therefore, please remember to email support@cs.jhu.edu for assistance.
  • Also, please have Zoom available on your device(s), so that we can arrange to contact you using that method, as an alternative to in-person communication.
  • For the time being, Steve DeBlasio, our accounts liaison, is providing a virtual version of his daily office hours for accounts, etc. Email support@cs.jhu.edu for details.


CS IT SERVICE OUTAGES (Unplanned & Planned)

UNPLANNED CS IT SERVICE OUTAGES

None at this time.


PLANNED CS IT SERVICE OUTAGES

None at this time.


CS COMPUTING LAB AVAILABILITY


MH 122 (CS Undergrad Lab/Collaboration room) is available for in-person access.


MH G61 (CS Masters/Ugrad Labs) is available for in-person access.


AUDIO/VISUAL (A/V) OUTAGES

None at this time.