Notices

UNPLANNED SERVICE OUTAGES

None at this time.


Our Linux client ugradx.cs.jhu.edu was down from approximately 11:00 pm on Thursday, February 18th through 9:00 am on Friday, February 19th. The system is back up and available and we're investigating the outage.

PLANNED OUTAGES

Nothing at this time.


CS COMPUTING LAB AVAILABILITY

MH 122 (Ugrad Lab)

Open as usual.


MH G-61 (Masters/Ugrad Lab)

PLANNED CLOSURE

WHERE: Malone Hall G-61, both the Masters and Ugrad sides of the lab.

WHEN: Monday, March 14 & Tuesday, March 15, from 6am to 12 Noon.

WHY: Network cable installation. The lab will be closed those two mornings as workers install additional network cable.

NOTES:
  • During the lab closure times, the masters and ugrad Linux computer in G-61 will continue to be available remotely, via SSH.
  • Ugrad Lab, MH 122 will not be affected and will remain open during those times.